1 | 1 | Survey. | 20-Sep-1990 | |
2 | 1 | Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which would interfere with or damage any Aboriginal site. | 20-Sep-1990 | |
3 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 20-Sep-1990 | |
4 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
4 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 20-Sep-1990 | 11-Aug-2005 |
5 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 20-Sep-1990 | |
6 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface clearing or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
6 | 1 | Unless the written approval of the District Mining Engineer, Department of Mines, is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface clearing or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 20-Sep-1990 | 11-Aug-2005 |
7 | 2 | No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained. | 12-Aug-2005 | |
7 | 1 | No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained. | 20-Sep-1990 | 11-Aug-2005 |
8 | 1 | Mining on any road or road reserve being confined to below a depth of 15 metres from the natural surface. | 20-Sep-1990 | |
9 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Birthday - Carinthian Gold Project - Notice of Intent" dated 14 June 1996 and retained on Department of Minerals and Energy File No. 2111/96.
- (MCP Reg ID 70485) "Mine Closure Plan – Birthday Corinthian Project – Small Scale Operation – M77/450" dated 30 October 2017 signed by Hong Seong Sun, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-70485 as Doc ID 5358570
Where a difference exists between the above document and the following conditions, then the following conditions shall prevail. | 21-May-2019 | |
9 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Birthday - Carinthian Gold Project - Notice of Intent" dated 14 June 1996 and retained on Department of Minerals and Energy File No. 2111/96.
- (Reg ID 48546) "Mine Closure Plan - Birthday Coringthian Project: Small Scale Operations, M77/450" dated 29 May 2014 signed by Keith Wong and retained on Department of Mines and Petroleum File No. EARS-MCP-48546
Where a difference exists between the above document and the following conditions, then the following conditions shall prevail. | 22-Sep-2014 | 20-May-2019 |
9 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled "Birthday - Carinthian Gold Project - Notice of Intent" dated 14 June 1996 and retained on Department of Minerals and Energy File No. 2111/96.Where a difference exists between the above document and the following conditions, then the following conditions shall prevail. | 27-Nov-1996 | 21-Sep-2014 |
10 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 27-Nov-1996 | |
11 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 27-Nov-1996 | |
12 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer. | 27-Nov-1996 | |
13 | 1 | All rubbish and scrap being progressively disposed of in a suitable manner. | 27-Nov-1996 | |
14 | 1 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the State Mining Engineer. | 27-Nov-1996 | |
15 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a program to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained. | 27-Nov-1996 | |
16 | 1 | The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines for due compliance with the environmental conditions of the lease in the sum of: | 27-Nov-1996 | 01-Jul-2013 |
17 | 2 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 02-Sep-2013 | |
17 | 1 | The lessee submitting to the State Mining Engineer, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 27-Nov-1996 | 02-Sep-2013 |
18 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website: | 22-Sep-2014 | 21-May-2019 |
18 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 20-Apr-2012 | 21-Sep-2014 |
19 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 28-Aug-2023 | |
19 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 21-May-2019 | 27-Aug-2023 |
Cond # | Ver | Text | Start | End |
1 | 1 | Survey. | 20-Sep-1990 | |
2 | 1 | Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which would interfere with or damage any Aboriginal site. | 20-Sep-1990 | |
3 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 20-Sep-1990 | |
4 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
4 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 20-Sep-1990 | 11-Aug-2005 |
5 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 20-Sep-1990 | |
6 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface clearing or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
6 | 1 | Unless the written approval of the District Mining Engineer, Department of Mines, is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface clearing or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 20-Sep-1990 | 11-Aug-2005 |
7 | 2 | No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained. | 12-Aug-2005 | |
7 | 1 | No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained. | 20-Sep-1990 | 11-Aug-2005 |
8 | 1 | Mining on any road or road reserve being confined to below a depth of 15 metres from the natural surface. | 20-Sep-1990 | |
9 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Birthday - Carinthian Gold Project - Notice of Intent" dated 14 June 1996 and retained on Department of Minerals and Energy File No. 2111/96.
- (MCP Reg ID 70485) "Mine Closure Plan – Birthday Corinthian Project – Small Scale Operation – M77/450" dated 30 October 2017 signed by Hong Seong Sun, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-70485 as Doc ID 5358570
Where a difference exists between the above document and the following conditions, then the following conditions shall prevail. | 21-May-2019 | |
9 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Birthday - Carinthian Gold Project - Notice of Intent" dated 14 June 1996 and retained on Department of Minerals and Energy File No. 2111/96.
- (Reg ID 48546) "Mine Closure Plan - Birthday Coringthian Project: Small Scale Operations, M77/450" dated 29 May 2014 signed by Keith Wong and retained on Department of Mines and Petroleum File No. EARS-MCP-48546
Where a difference exists between the above document and the following conditions, then the following conditions shall prevail. | 22-Sep-2014 | 20-May-2019 |
9 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled "Birthday - Carinthian Gold Project - Notice of Intent" dated 14 June 1996 and retained on Department of Minerals and Energy File No. 2111/96.Where a difference exists between the above document and the following conditions, then the following conditions shall prevail. | 27-Nov-1996 | 21-Sep-2014 |
10 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 27-Nov-1996 | |
11 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 27-Nov-1996 | |
12 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer. | 27-Nov-1996 | |
13 | 1 | All rubbish and scrap being progressively disposed of in a suitable manner. | 27-Nov-1996 | |
14 | 1 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the State Mining Engineer. | 27-Nov-1996 | |
15 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a program to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained. | 27-Nov-1996 | |
16 | 1 | The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines for due compliance with the environmental conditions of the lease in the sum of: | 27-Nov-1996 | 01-Jul-2013 |
17 | 2 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 02-Sep-2013 | |
17 | 1 | The lessee submitting to the State Mining Engineer, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 27-Nov-1996 | 02-Sep-2013 |
18 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website: | 22-Sep-2014 | 21-May-2019 |
18 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 20-Apr-2012 | 21-Sep-2014 |
19 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 28-Aug-2023 | |
19 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 21-May-2019 | 27-Aug-2023 |
Type | Number | Details |
Plaint | SC5/901 | Lodged 10:20 AM on 10 Apr 1991 by Robert FRADLRECORDED 10:20 AM 10 Apr 1991UPHELD 12 Aug 1991 by Warden PG Thobaven and the following orders made :
a) A declaration that the defendant holds the tenement in trust for the plaintiff.
b) A declaration that the Defendant has no interest in the plant situated on the tenement on 10 Nov 1990 and shall return the plant to the Plaintiff and make restitution for all plant removed, lost or damaged from and including 13 Nov 1990.
c) An order that the Plaintiff execute and lodge with the Registrar of Mines at Perth a transfer of the tenement in registerable form to the Plaintiff. |
Caveat | 2670H/901 | Lodged 1:50 PM on 27 Jun 1991 by Robert FRADLRECORDED 1:50 PM 27 Jun 1991WITHDRAWN 1:25 PM 28 Jan 1992 |
Withdrawal of Dealing | 713H/912 | Lodged 1:25 PM on 28 Jan 1992 withdrawing Caveat 2670H/901REGISTERED 1:25 PM 28 Jan 1992 |
Bond | PE2865 | Lodged on 12 Aug 1996 For $5,000.00RECORDED 12 Aug 1996RETIRED 14 Oct 1997 |
Plaint | SC2/967 | Lodged 9:25 AM on 10 Mar 1997 by Andrew John MortonRECORDED 9:25 AM 10 Mar 1997Plaintiff seeking an order for the Warden:
a) declare that the partnership between the plaintiff and the defendants has been dissolved;
b) determine the contributions between the partners therein;
c) declare that the assets of the partnership include mining lease 77/450 together with all improvements, plant and equipment situate thereon;
d) order that the first defendant transfer mining lease 77/450 into the name of the partnership, alternatively pay the plaintiff damages in lieu thereof;
e) order the taking of all necessary accounts relating to the partnership;
f) order that the first defendant account to the partnership for his use of the partnership assets before and after the dissolution of the partnership;
g) order that the affairs of the partnership be wound up;
h) order that the first defendant, alternatively the partnership, pay the plaintiff's costs of this plaint pursuant to Local Court Division 2 Complex Scale; and
i) make such other orders as the Warden shall think fit.The following orders were made by Warden Cullen at Southern Cross and handed down at Midland on 25 Sep 1997.
The Court adjudges that:
a) there be judgement for the plaintiff against the first defendants in the following terms
AND the Court declares and orders:
a) that the plaintiff and the first defendants entered into a partnership for the working of mining lease M77/450 in or around Nov 1996.
b) that the partnership between the plaintiff and the first defendants has been dissolved.
c) that the first named defendant account to the partnership for his use of the partnership assets before and after the dissolution of the partnership.
d) that the affairs of the partnership be wound up.
e) that the plaint be adjourned to consider such further orders as sought by the plaintiff are appropriate to the Warden's Court at Southern Cross sitting at Midland at 9:30 AM on 10 Oct 1997.The following further orders were made by Warden Cullen at Southern Cross on 8 Oct 1997.
The Court adjudges that:
c) It is hereby agreed that the following orders may be made by consent:
1) The claim and cross-claim filed herein be dismissed;
2) The injunction granted herein on 11 Sep 1997 be and is hereby discharged; and
3) There be no order as to costs. |
Caveat | 171H/978 | Lodged 1:00 PM on 07 Aug 1997 by JAGEM PTY LTDRECORDED 10:00 AM 08 Oct 1997WITHDRAWN 3:12 PM 25 Feb 1998 |
Injunction | 1H/978 | GRANTED by Warden on 11 Sep 1997 restraining the Director, Mineral Titles from registering Transfer 239H/978 and recording Caveat 171H/978 or any other dealingDISCHARGED 08 Oct 1997 by order of Warden Cullen at Southern CrossLodged:00:00 11 September 1997GRANTED:00:00 11 September 1997WITHDRAWN:00:00 08 October 1997 |
Bond | PE3559 | Lodged on 02 Oct 1997 For $5,000.00RECORDED 02 Oct 1997Lodged:00:00 02 October 1997Bond Type:Unconditional Performance BondBond Amount:$5,000.00RECORDED:02 October 1997RETIRED - MRF:16 July 2014 |
Withdrawal of Dealing | 374H/978 | Lodged 3:12:00 PM on 25 Feb 1998 withdrawing Caveat 171H/978REGISTERED 3:12 PM 25 Feb 1998 |
Caveat | 515H/001 | Lodged 2:57 PM on 24 Nov 2000 by Robert FRADL in respect to 50/100ths shares in the name of JAGEM PTY LTDRECORDED 2:57 PM 24 Nov 2000WITHDRAWN:11:00 08 April 2011 |
Fine | 193418 | Penalty of $150 imposed pursuant to Section 97(5)
Date Due: 23 Mar 2004 Date Paid: 12 Mar 2004RECORDED 23 Feb 2004Penalty amount:$150.00Notification date:22/02/2004Due date:23/03/2004Pursuant to:Section 97(5)RECORDED:23 February 2004PAYMENT RECEIVED:12 March 2004FINALISED:12 March 2004Receipt Number:69979Amount:$150.00 |
Extension of Time | 205608 | Lodged 12:00 AM on 11 Nov 2004 extending the time to lodge until 31 Dec 2004Approved on 11 Nov 2004 |
Application to Amend | 352AH/045 | Lodged 11:00 AM on 28 Jan 2005 amending address to: ' c/- Lynette Isobel Fradl, Executor of the Estate of Robert Fradl, 16 Milgun Drive, Yangebup WA 6164REGISTERED 11:00 AM 28 Jan 2005 |
Plaint | SC25/045 | Lodged 4:29:00 PM on 11 Apr 2005 by Kevin Andrew WILLIAMS - Partnership Dispute against John Neville PRYCE and IN THE PURPLE PTY LTDRECORDED 4:29 PM 11 Apr 200511 Oct 2005 Warden Cullen made the following orders;
1. The Plaintiff file full Particulars of Claim by 26 Oct 2005.
2. The Defendants file full Particulars of Defence by 10 Nov 2005.
3. Both parties give full discovery on affidavit by 24 Nov 2005.
Plaint SC25/045 adjourned to Set Hearing date on 6 Dec 2005.DISMISSED 21 Nov 2007There be no order as to costs |
Injunction | SC1/045 | Lodged 9:00:00 AM on 12 Apr 2005 [Ex Parte] by Kevin Andrew WILLIAMS [Plaintiff] and John Neville PRYCE [1st Defendant] and IN THE PURPLE PTY LTD [2nd Defendant]GRANTED 9:30 AM 12 Apr 2005 Ex Parte by Warden Edwards at Northam who ordered that:
1. The Defendants and each of them be restrained and an Injunction is hereby granted restraining them whether by themselves, their servants, agents or otherwise until further order from mining on Mining Lease 77/450 or from removing or otherwise dealing with any ore thereon whether on the surface or underground.
2. The Defendants have liberty to apply to set aside this Injunction on giving the Plaintiff 7 day's notice.
3. The costs of this application be reserved.
JUDGMENT/ORDER OF THE WARDEN'S COURT made at Southern Cross WC on 17 Jul 2007 by Warden Edwards at 12:00 midday as per the following:
BY CONSENT IT IS HEREBY ORDERED that:
1. Lewis Pryce be entitled to enter Mining Lease 77/450 for the purpose of dewatering the mine thereon, of bogging all broken ore currently underground and bringing the same to the surface.
2. Upon completion of the work described in paragraph 1 of this Minute, that all ore then available on the surface of the Mining Lease be transported to Coolgardie for treatment by Higginsville Mining Pty Ltd.
3. Upon completion of treatment of the ore at Higginsville, the gold recovered be delivered to the Perth Mint with instructions to be given to the Mint for proceeds to be paid by cheque to Lawton Lawyers and McKenzie Lalor.
4. The proceeds of gold received from the Perth Mint be paid into a trust account in the joint names of the solicitors for the Plaintiff and the solicitors for the Defendants and they are authorised to pay cartage, treatment and royalty payments. After disbursement of the cost of cartage, treatment and royalty payments the balance funds are to remain in the joint account pending agreement between the parties or Final Order of this Court.DISMISSED 21 Nov 2007 |
Plaint | SC3/067 | Lodged 10:30:00 AM on 22 Sep 2006 (for forfeiture) by Vernon Wesley STRANGERECORDED 10:30 AM 22 Sep 2006DISMISSED 21 Nov 2007There be no order as to costs. |
Bond Requirement | 323463 | Requirement Date:27/11/1996Amount:$5,000.00RECORDED:13:36:18 27 November 1996FINALISED:14:40:59 16 July 2014 |
Withdrawal of Dealing | 369284 | Lodged:11:00 08 April 2011In respect to:Caveat 515H/001 (72545)RECORDED:11:00 08 April 2011 |
Extension / Renewal of Term | 381199 | Lodged:15:35 13 September 2011Applied For Period:21 YearsRECORDED:15:35 13 September 2011GRANTED:15 September 2011Granted Period:21 YearsTerm Renewed To:19/09/2032 |
Caveat | 401596 | Lodged:15:30 17 July 2012Caveat Type:Consent CaveatCaveator:EL CORPORATION LIMITEDShares Caveated:50/100 shares FRADL, Robert
50/100 shares JAGEM PTY LTDRECORDED:15:30 17 July 2012WITHDRAWN:13:55 17 July 2013 |
Devolution | 401599 | Lodged:15:30 17 July 2012From:FRADL, Robert 50/100 sharesTo:FRADL, Lynette Isobel 50/50 sharesPursuant to:Lynette Isobel Fradl is the wife and executor of the estate of her late husband Mr Robert Fradl. Supporting documents lodged to support the devolution are Mr Fradl's will, Certificate of Probate appointing Matthew Morgan executor, and Deed of Variation appointing Mrs Lynette Isobel Fradl as executor.REGISTERED:15:30 17 July 2012 |
Caveat | 390361 | Lodged:13:40 31 January 2012REJECTED:13:40 31 January 2012Relodged:14:00 27 November 2012Caveat Type:Absolute CaveatCaveator:JAGEM PTY LTDShares Caveated:50/100 shares JAGEM PTY LTDWITHDRAWN:15:45 06 August 2013 |
Caveat | 413436 | Lodged:08:30 18 December 2012Caveat Type:Absolute CaveatCaveator:SHILKIN, StevenShares Caveated:50/100 shares JAGEM PTY LTDWITHDRAWN:15:45 06 August 2013 |
Caveat | 413439 | Lodged:08:30 18 December 2012Caveat Type:Absolute CaveatCaveator:SHILKIN, StevenShares Caveated:50/100 shares FRADL, Lynette IsobelRECORDED:08:30 18 December 2012WITHDRAWN:15:40 17 June 2013 |
Caveat | 413807 | Provisionally Lodged:14:20 20 December 2012Caveat Type:Absolute CaveatCaveator:FRADL, LYNETTE ISOBELShares Caveated:50/100 shares FRADL, Lynette IsobelREJECTED:14:20 20 December 2012 |
Caveat | 415185 | Lodged:15:10 17 January 2013Caveat Type:Absolute CaveatCaveator:JAGEM PTY LTDShares Caveated:50/100 shares FRADL, Lynette IsobelWITHDRAWN:15:40 17 June 2013 |
Withdrawal of Dealing | 425380 | Lodged:15:40 17 June 2013In respect to:Caveat 413439RECORDED:15:40 17 June 2013 |
Withdrawal of Dealing | 425384 | Lodged:15:40 17 June 2013In respect to:Caveat 415185RECORDED:15:40 17 June 2013 |
Withdrawal of Dealing | 427304 | Lodged:13:55 17 July 2013In respect to:Caveat 401596RECORDED:13:55 17 July 2013 |
Caveat | 427307 | Lodged:13:55 17 July 2013REJECTED:13:55 17 July 2013 |
Caveat | 427535 | Lodged:10:20 23 July 2013Caveat Type:Absolute CaveatCaveator:SUMMIT LIGHT VENTURES LTDShares Caveated:50/100 shares SHILKIN, Steven AndrewWITHDRAWN:16:00 19 September 2013 |
Caveat | 427537 | Lodged:10:20 23 July 2013Caveat Type:Absolute CaveatCaveator:SUMMIT LIGHT VENTURES LTDShares Caveated:50/100 shares JAGEM PTY LTDWITHDRAWN:15:45 09 August 2013 |
Withdrawal of Dealing | 428655 | Lodged:15:45 06 August 2013In respect to:Caveat 390361RECORDED:15:45 06 August 2013 |
Withdrawal of Dealing | 428656 | Lodged:15:45 06 August 2013In respect to:Caveat 413436RECORDED:15:45 06 August 2013 |
Withdrawal of Dealing | 429358 | Lodged:15:45 09 August 2013In respect to:Caveat 427537RECORDED:15:45 09 August 2013 |
Withdrawal of Dealing | 431588 | Lodged:16:00 19 September 2013In respect to:Caveat 427535RECORDED:16:00 19 September 2013 |
Application to Amend | 433713 | Lodged:14:55 23 October 2013Amending:AddressFrom:SUMMIT LIGHT VENTURES LTD, C/- STEINEPREIS PAGANIN, GPO BOX 2799, PERTH, WA, 6001To:SUMMIT LIGHT VENTURES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:14:55 23 October 2013 |
Application to Amend | 447174 | Lodged:13:37:34 26 May 2014Amending:AddressFrom:SUMMIT LIGHT VENTURES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:SUMMIT LIGHT VENTURES LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913RECORDED:13:37:34 26 May 2014 |
Extension of Time | 498399 | Lodged:15:41:56 12 December 2016Type:Stat DecRECORDED:15:41:56 12 December 2016APPROVED:08:46:10 13 December 2016Time extended to 12 December 2016 |
Extension of Time | 498422 | Lodged:09:54:17 13 December 2016Type:Stat DecRECORDED:09:54:17 13 December 2016WITHDRAWN:14:51 30 December 2016 |
Application for Forfeiture | 566833 | Lodged:10:21:35 18 November 2019Applicant:WEST AUSTRALIAN PROSPECTORS PTY LTDRespondent:SUMMIT LIGHT VENTURES LTDRECORDED:10:21:35 18 November 2019BY CONSENT AND BY ORDER OF THE WARDEN:
1. Applications for Forfeiture 566833 by the First Applicant and 566844 by the Second Applicant are to be heard and determined on the same occasion.
2. The matters are transferred to Perth for further mention hearing.
3. .there are no orders as to costs.
WARDEN WEBB 18/08/2020 at 12:08pmWarden's Determination:Recommended for Forfeiture 09/05/2022 00:00:00See 2022 WAMW 9 and 2022 WAMW 10Pursuant to Section 99, penalty of $10,000.00 imposed by Minister on 16 January 2023. See register entry "Fine 666960" below for detailsPenalty paid 31 January 2023 - Application for forfeiture finalised |
Application for Forfeiture | 566844 | Lodged:12:03:41 18 November 2019Applicant:MCCLAREN, Kym AnthonyRespondent:SUMMIT LIGHT VENTURES LTDRECORDED:12:03:41 18 November 2019BY CONSENT AND BY ORDER OF THE WARDEN:
1. Applications for Forfeiture 566833 by the First Applicant and 566844 by the Second Applicant are to be heard and determined on the same occasion.
2. The matters are transferred to Perth for further mention hearing.
3. .there are no orders as to costs.
WARDEN WEBB 18/08/2020 at 12:08pmWarden's Determination:Recommended for Forfeiture 09/05/2022 10:00:00See 2022 WAMW 9 and 2022 WAMW 10Pursuant to Section 99, penalty of $10,000.00 imposed by Minister on 16 January 2023. See register entry "Fine 666960" below for detailsPenalty paid 31 January 2023 - Application for forfeiture finalised |
Caveat | 651265 | Lodged:14:20:10 10 June 2022Caveat Type:Absolute CaveatCaveator:WEST AUSTRALIAN PROSPECTORS PTY LTDShares Caveated:100/100 shares SUMMIT LIGHT VENTURES LTDRECORDED:14:20:10 10 June 2022WITHDRAWN:09:00:50 07 July 2022 |
Caveat | 652536 | Lodged:13:22 30 June 2022Caveat Type:Consent CaveatCaveator:WEST AUSTRALIAN PROSPECTORS PTY LTD
MCCLAREN, Kym AnthonyShares Caveated:100/100 shares SUMMIT LIGHT VENTURES LTDRECORDED:13:22 30 June 2022WITHDRAWN:16:22:59 21 October 2022 |
Withdrawal of Dealing | 652949 | Lodged:09:00:50 07 July 2022In respect to:Caveat 651265RECORDED:09:00:50 07 July 2022 |
Withdrawal of Dealing | 661685 | Lodged:16:22:59 21 October 2022In respect to:Caveat 652536RECORDED:16:22:59 21 October 2022 |
Fine | 666960 | Penalty amount:$10,000.00Notification date:16/01/2023Due date:20/02/2023Pursuant to:Other - 99(1)(b)Failure to pay penalty in full by the due date will result in notice of forfeiture being published in the Government Gazette and the rights conferred on the applicants for forfeiture under section 100(2) of the Mining Act 1978 shall apply.RECORDED:16 January 2023PAYMENT RECEIVED:31 January 2023FINALISED:02 February 2023Receipt Number:30817426445Amount:$10,000.00Remaining balance:$0.00 |
Application to Amend | 678234 | Lodged:08:30 12 June 2023Amending:Address (Including DTC Details)From:Principal Place of Business : WEST AUSTRALIAN PROSPECTORS PTY LTD, 321 ARCTURUS ST, SOUTHERN CROSS, WA, 6426 and DTC :WEST AUSTRALIAN PROSPECTORS PTY LTD, 321 ARCTURUS ST, SOUTHERN CROSS, WA, 6426To:Principal Place of Business : WEST AUSTRALIAN PROSPECTORS PTY LTD, 321 ARCTURUS STREET, SOUTHERN CROSS, WA, 6426 and DTC :WEST AUSTRALIAN PROSPECTORS PTY LTD, VERNON STRANGE, PO BOX 77, SOUTHERN CROSS, WA, 6426, xxxxxxx@wn.com.au, xxxxxxx880REJECTED:08:30 12 June 2023 |
Application to Amend | 694589 | Lodged:13:20:53 22 January 2024Amending:Address (Including DTC Details)From:Principal Residence : MCCLAREN, Kym Anthony, 26 HEADLEY PLACE, BAYSWATER, WA, 6053 and DTC :MCCLAREN, Kym Anthony, 26 HEADLEY PLACE, BAYSWATER, WA, 6053To:Principal Residence : MCCLAREN, Kym Anthony, PO BOX 2142, BOULDER, WA, 6432, xxxxxxxxxxxxxxx@gmail.com, xxxxxxxxx757 and DTC :MCCLAREN, Kym Anthony, KYM MCCLAREN, PO BOX 4021, EDEN HILL, WA, 6054, xxxxxxxxxxxxxxx@gmail.comRECORDED:13:20:53 22 January 2024 |
Application to Amend | 701546 | Lodged:13:58:19 17 April 2024Amending:Address (Including DTC Details)From:Principal Place of Business : WEST AUSTRALIAN PROSPECTORS PTY LTD, 321 ARCTURUS ST, SOUTHERN CROSS, WA, 6426 and DTC :WEST AUSTRALIAN PROSPECTORS PTY LTD, 321 ARCTURUS ST, SOUTHERN CROSS, WA, 6426To:Principal Place of Business : WEST AUSTRALIAN PROSPECTORS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400 and DTC :WEST AUSTRALIAN PROSPECTORS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400RECORDED:13:58:19 17 April 2024 |
Application to Amend | 702541 | Lodged:15:10:13 29 April 2024Amending:Address (Including DTC Details)From:Principal Residence : MCCLAREN, Kym Anthony, PO BOX 2142, BOULDER, WA, 6432, xxxxxxxxxxxxxxx@gmail.com, xxxxxxxxx757 and DTC :MCCLAREN, Kym Anthony, KYM MCCLAREN, PO BOX 4021, EDEN HILL, WA, 6054, xxxxxxxxxxxxxxx@gmail.comTo:Principal Residence : MCCLAREN, Kym Anthony, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :MCCLAREN, Kym Anthony, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:10:13 29 April 2024 |