Tenement: M77-1286

View on Landtracker Maps (logon required)

Extracted from MTO on 26-Apr-2025 00:56, last changed 15-Mar-2025.

Tenement Summary

Identifier:M 77/1286Type:Mining Lease
Status:LiveDistrict:YILGARN M.F.
Lodged:SOUTHERN CROSSArea:64.52500 HA
Purposes:Term:21 Years
Markout:20-Jul-2016 16:00Received:21-Jul-2016 09:40
Commence:28-Dec-2016 Expiry:27-Dec-2037

Holders

Company NameSharesTotal Shares
GOLDZONE INVESTMENTS PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
STRANGE, Vernon Wesley100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 49Conversion 491143FinalisedP 77/4127Dead

Shires

Shire NameShire NumberStartArea
MENZIES SHIRE539021-Jul-2016 64.52500 HA

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.28-Dec-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.28-Dec-2016
31The Lessee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.28-Dec-2016
41The Lessee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Lease; or
  • registration of a transfer introducing a new Lessee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
28-Dec-2016
51The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (MP Reg. ID: 60190) “Broadbents Mining J.V. Mining Proposal” dated 25 July 2016 signed by Vernon Strange and retained on Department of mines and Petroleum file no. EARS-MPMLA-60190 as Doc ID 4415027
  • Email dated 5 January 2017 "RE- Mining Proposal M 77/1286 – revised requested further information received from Vernon Strange, and retained on Department of Mines and Petroleum file no. EARS-MPMLA-60190 as Doc ID 4738685.
  • (MCP Reg. ID: 60190) Broadbents Mining J.V. Mine Closure Plan" dated 25 July 2016 signed by Vernon Strange – Tenement Holder, and retained on Department of Mines and Petroleum file no.EARS-MPMLA-60190 as Doc ID 4415027.                                      
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
13-Jan-2017
61The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.13-Jan-2017
71All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.13-Jan-2017
81All rubbish and scrap is to be progressively disposed of in a suitable manner.13-Jan-2017
91The Lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities.13-Jan-2017
101On the completion of operations or progressively where possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP.13-Jan-2017
111The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • October
13-Jan-2017
121A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
  • 2018
13-Jan-2017
131All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.16-Sep-2022

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.28-Dec-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.28-Dec-2016
31The Lessee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.28-Dec-2016
41The Lessee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Lease; or
  • registration of a transfer introducing a new Lessee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
28-Dec-2016
51The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (MP Reg. ID: 60190) “Broadbents Mining J.V. Mining Proposal” dated 25 July 2016 signed by Vernon Strange and retained on Department of mines and Petroleum file no. EARS-MPMLA-60190 as Doc ID 4415027
  • Email dated 5 January 2017 "RE- Mining Proposal M 77/1286 – revised requested further information received from Vernon Strange, and retained on Department of Mines and Petroleum file no. EARS-MPMLA-60190 as Doc ID 4738685.
  • (MCP Reg. ID: 60190) Broadbents Mining J.V. Mine Closure Plan" dated 25 July 2016 signed by Vernon Strange – Tenement Holder, and retained on Department of Mines and Petroleum file no.EARS-MPMLA-60190 as Doc ID 4415027.                                      
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
13-Jan-2017
61The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.13-Jan-2017
71All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.13-Jan-2017
81All rubbish and scrap is to be progressively disposed of in a suitable manner.13-Jan-2017
91The Lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities.13-Jan-2017
101On the completion of operations or progressively where possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP.13-Jan-2017
111The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • October
13-Jan-2017
121A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
  • 2018
13-Jan-2017
131All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.16-Sep-2022

Dealings

TypeNumberDetails
Application to Amend504605Lodged:13:55 13 April 2017Amending:Address (Including DTC Details)From:Principal Residence : STRANGE, Vernon Wesley, C/- PO BOX 77, SOUTHERN CROSS, WA, 6426 and DTC :STRANGE, Vernon Wesley, VERNON WESLEY STRANGE, PO BOX 77, SOUTHERN CROSS, WA, 6426, xxxxxxx@wn.co.auTo:Principal Residence : STRANGE, Vernon Wesley, 321, ARCTURUS STREET, SOUTHERN CROSS, WA, 6426 and DTC :STRANGE, Vernon Wesley, VERNON WESLEY STRANGE, C/- PO BOX 77, SOUTHERN CROSS, WA, 6426, xxxxxxx@wn.com.au, xxxxxxx880RECORDED:13:55 13 April 2017
Forfeiture526375Initiated:28/03/2018 for non-compliance with reporting requirements( Form 5 )RECORDED:17:09:32 23 March 2018Notice Issued:Regulation 50 Notice sent 28/03/2018 for non-compliance with expenditure requirements pursuant to Reg 32/Sec 82(1)- late lodgement of Form 5.Compliance Date:02/05/2018FINALISED:Order by Minister on 10 May 2018 that M 77/1286 be Penalty Imposed
Application to Amend528998Lodged:09:17:22 01 May 2018Amending:Address (Including DTC Details)From:STRANGE, Vernon Wesley, VERNON WESLEY STRANGE, C/- PO BOX 77, SOUTHERN CROSS, WA, 6426, xxxxxxx@wn.com.au, xxxxxxx880To:STRANGE, Vernon Wesley, MINING PROJECTS MANAGEMENT GROUP PTY LTD, PO BOX 8481, SOUTH PERTH, WA, 6151, xxxxxx@bigpond.comRECORDED:09:17:22 01 May 2018
Fine530314Fine in respect to:Forfeiture Process 526375Fine reason:Non-compliance with expenditure obligationsPenalty amount:$60.00Notification date:16/05/2018Due date:20/06/2018Pursuant to:Section 97(5)RECORDED:16 May 2018PAYMENT RECEIVED:31 May 2018FINALISED:31 May 2018Receipt Number:EFTAmount:$60.00Remaining balance:$0.00
Extension of Time548720Lodged:13:10 28 February 2019Type:Form 5RECORDED:13:10 28 February 2019APPROVED:09:42:33 06 March 2019Time extended to 1 March 2019
Application to Amend556084Lodged:15:00:32 13 June 2019Amending:Address (Including DTC Details)From:MINING PROJECTS MANAGEMENT GROUP PTY LTD, 48 ANGELO STREET, SOUTH PERTH, WA, 6151To:MINING PROJECTS MANAGEMENT GROUP PTY LTD, SUBIACO BUSINESS CENTRE, SUITE 5, 531 HAY STREET, SUBIACO, WA, 6008RECORDED:15:00:32 13 June 2019
Application to Amend558180Lodged:08:30 10 July 2019Amending:Address (Including DTC Details)From:MINING PROJECTS MANAGEMENT GROUP PTY LTD, TENEMENTS & LANDS, PO BOX 8481, SOUTH PERTH, WA, 6151, xxxxxxxxxxxxxxx@outlook.comTo:MINING PROJECTS MANAGEMENT GROUP PTY LTD, DATUM PEG MINING TITLES SOLUTIONS, PO BOX 5010, CENTREPOINT, MIDLAND, WA, 6056, xxxxxxx@datumpeg.com.au, xxxxxxx769RECORDED:08:30 10 July 2019
Forfeiture574191Initiated:17/03/2020 for non-compliance with reporting requirements( Form 5 )RECORDED:13:21:05 16 March 2020Notice Issued:Regulation 50 Notice sent 17/03/2020 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:21/04/2020FINALISED:Order by Minister on 03 June 2020 that M 77/1286 be Penalty Imposed
Application to Amend579043Lodged:15:09:17 29 May 2020Amending:Address (Including DTC Details)From:MINING PROJECTS MANAGEMENT GROUP PTY LTD, DATUM PEG MINING TITLES SOLUTIONS, PO BOX 5010, CENTREPOINT, MIDLAND, WA, 6056, xxxxxxx@datumpeg.com.au, xxxxxxx769To:MINING PROJECTS MANAGEMENT GROUP PTY LTD, C/- MINING PROJECTS MANAGEMENT GROUP PTY LTD, PO BOX 5010 (CENTREPOINT), MIDLAND, WA, 6056, xxxxxxx@datumpeg.com.au, xxxxxxx769RECORDED:15:09:17 29 May 2020
Fine579246Fine in respect to:Forfeiture Process 574191Fine reason:Non-compliance with expenditure obligationsPenalty amount:$270.00Notification date:08/06/2020Due date:13/07/2020Pursuant to:Section 97(5)RECORDED:03 June 2020PAYMENT RECEIVED:22 June 2020FINALISED:22 June 2020Receipt Number:10150149Amount:$270.00Remaining balance:$0.00
Application to Amend618733Lodged:08:30 25 March 2021Amending:Address (Including DTC Details)From:MINING PROJECTS MANAGEMENT GROUP PTY LTD, C/- MINING PROJECTS MANAGEMENT GROUP PTY LTD, PO BOX 5010 (CENTREPOINT), MIDLAND, WA, 6056, xxxxxxx@datumpeg.com.au, xxxxxxx769To:MINING PROJECTS MANAGEMENT GROUP PTY LTD, C/- JAKE LARSEN, 218 BURBIDGE ROAD, MARVEL LOCH, WA, 6426, xxxxxxxxxxxx@hotmail.comREJECTED:08:30 25 March 2021
Application to Amend618860Lodged:15:45:24 25 March 2021Amending:Address (Including DTC Details)From:MINING PROJECTS MANAGEMENT GROUP PTY LTD, C/- MINING PROJECTS MANAGEMENT GROUP PTY LTD, PO BOX 5010 (CENTREPOINT), MIDLAND, WA, 6056, xxxxxxx@datumpeg.com.au, xxxxxxx769To:MINING PROJECTS MANAGEMENT GROUP PTY LTD, JAKE LARSEN, 218 BURBIDGE ROAD, MARVEL LOCH, WA, 6426, xxxxxxxxxxxx@hotmail.comRECORDED:15:45:24 25 March 2021
Application to Amend664683Lodged:08:30 05 December 2022Amending:Address (Including DTC Details)From:LARSEN, Jake Thomas, JAKE LARSEN, 218 BURBIDGE ROAD, MARVEL LOCH, WA, 6426, xxxxxxxxxxxx@outlook.com, xxxxxxx310To:LARSEN, Jake Thomas, JAKE LARSEN, PO BOX 1046, GUILDERTON, WA, 6041, xxxxxxxxxxxx@outlook.com, xxxxxxx310RECORDED:08:30 05 December 2022
Application to Amend664692Lodged:08:30 05 December 2022Amending:Address (Including DTC Details)From:Principal Residence : LARSEN, Jake Thomas, 218 BURBIDGE ROAD, MARVEL LOCH, WA, 6426 and DTC :LARSEN, Jake Thomas, JAKE LARSEN, 218 BURBIDGE ROAD, MARVEL LOCH, WA, 6426, xxxxxxxxxxxx@outlook.comTo:Principal Residence : LARSEN, Jake Thomas, 270 TAMARISK DRIVE, GABBADAH, WA, 6041 and DTC :LARSEN, Jake Thomas, JAKE LARSEN, 218 BURBIDGE ROAD, MARVEL LOCH, WA, 6426, xxxxxxxxxxxx@outlook.com, xxxxxxx310RECORDED:08:30 05 December 2022
Application to Amend665794Lodged:12:00:51 19 December 2022Amending:Address (Including DTC Details)From:LARSEN, Jake Thomas, JAKE LARSEN, PO BOX 1046, GUILDERTON, WA, 6041, xxxxxxxxxxxx@outlook.com, xxxxxxx310To:LARSEN, Jake Thomas, WITAN RESOURCES PTY LTD, PO BOX 8376, WOOLLOONGABBA, QLD, 4102, xxxxxxxx@witanresources.comRECORDED:12:00:51 19 December 2022
Application to Amend671061Lodged:09:00:20 16 March 2023Amending:Address (Including DTC Details)FromToRECORDED:09:00:20 16 March 2023
Application to Amend725498Lodged:10:50:09 11 February 2025Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDZONE INVESTMENTS PTY LTD, 2 CARGILL STREET, VICTORIA PARK, WA, 6100, xxxxx@gzi.com.au and DTC :GOLDZONE INVESTMENTS PTY LTD, WITAN RESOURCES PTY LTD, PO BOX 8376, WOOLLOONGABBA, QLD, 4102, xxxxxxxxx@witanresources.comTo:Principal Place of Business : GOLDZONE INVESTMENTS PTY LTD, PO BOX 207, PADDINGTON, QLD, 4064, xxxxxxxxx@witanresources.com and DTC :GOLDZONE INVESTMENTS PTY LTD, WITAN RESOURCES PTY LTD, PO BOX 207, PADDINGTON, QLD, 4064, xxxxxxxxx@witanresources.comREJECTED:10:50:09 11 February 2025
Application to Amend725499Lodged:10:50:09 11 February 2025Amending:Address (Including DTC Details)From:GOLDZONE INVESTMENTS PTY LTD, 2 CARGILL STREET, VICTORIA PARK, WA, 6100, xxxxx@gzi.com.auTo:GOLDZONE INVESTMENTS PTY LTD, 2 CARGILL STREET, VICTORIA PARK, WA, 6100, xxxxxxxxx@gzi.com.auREJECTED:10:50:09 11 February 2025
Application to Amend727010Lodged:10:14:39 27 February 2025Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDZONE INVESTMENTS PTY LTD, 2 CARGILL STREET, VICTORIA PARK, WA, 6100, xxxxx@gzi.com.au and DTC :GOLDZONE INVESTMENTS PTY LTD, WITAN RESOURCES PTY LTD, PO BOX 8376, WOOLLOONGABBA, QLD, 4102, xxxxxxxxx@witanresources.comTo:Principal Place of Business : GOLDZONE INVESTMENTS PTY LTD, 1/160 BURSWOOD ROAD, BURSWOOD, WA, 6100, xxxxx@gzi.com.au and DTC :GOLDZONE INVESTMENTS PTY LTD, WITAN RESOURCES PTY LTD, PO BOX 207, PADDINGTON, QLD, 4064, xxxxxxxxx@witanresources.comRECORDED:10:14:39 27 February 2025
Application to Amend727011Lodged:10:14:39 27 February 2025Amending:Address (Including DTC Details)From:GOLDZONE INVESTMENTS PTY LTD, 1/160 BURSWOOD ROAD, BURSWOOD, WA, 6100, xxxxx@gzi.com.auTo:GOLDZONE INVESTMENTS PTY LTD, 2 CARGILL STREET, VICTORIA PARK, WA, 6100, xxxxxxxxx@gzi.com.auRECORDED:10:14:39 27 February 2025

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202519-Dec-2024 10725829$1,859.0064.52500 HA13-Mar-2018 $1,859.00$0.00
Rental202410-Jan-2024 (REFUND) FIL-43549$1,690.0064.52500 HA13-Mar-2018 $1,690.00$0.00
Rental202403-Jan-2024 10475606$1,690.00
Rental202421-Dec-2023 10471100$1,690.00
Rental202320-Dec-2022 10312921$1,560.0064.52500 HA13-Mar-2018 $1,560.00$0.00
Rental202223-Dec-2021 19613274654$1,430.0064.52500 HA13-Mar-2018 $1,430.00$0.00
Rental202122-Dec-2020 10176567$1,300.0064.52500 HA13-Mar-2018 $1,300.00$0.00
Rental202010-Jan-2020 10129045$1,287.0064.52500 HA13-Mar-2018 $1,287.00$0.00
Rental201917-Dec-2018 10080170$1,215.5064.52500 HA13-Mar-2018 $1,215.50$0.00
Rental201817-Dec-2018 10080170$17.6064.52500 HA13-Mar-2018 $1,144.00$0.00
Rental201811-Jan-2018 7020603218$1,126.40
Rental201729-Mar-2019 10090724$17.0564.52500 HA13-Mar-2018 $1,108.25$0.00
Rental201721-Jul-2016 01-004133SOUTHERN CROSS$1,091.20

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2025$10,000.00false
2024$10,000.0019-Feb-2025 $91,179.00$22,388.00$50,248.00$0.00$3,347.00$15,196.00$0.00false
2023$10,000.0016-Feb-2024 $93,161.00$0.00$0.00$0.00$0.00$0.00$93,161.00false
2022$10,000.0020-Feb-2023 $187,215.00$0.00$0.00$0.00$0.00$0.00$187,215.00false
2021$10,000.0007-Jan-2022 $110,164.68$0.00$0.00$0.00$0.00$0.00$110,164.68false
2020$10,000.0024-Feb-2021 $125,681.00$0.00$0.00$0.00$0.00$0.00$125,681.00false
2019$10,000.0018-Mar-2020 $259,071.00$0.00$0.00$0.00$0.00$0.00$259,071.00false
2018$10,000.0028-Feb-2019 $132,171.00$0.00$0.00$0.00$0.00$0.00$132,171.00false
2017$10,000.0028-Feb-2018 $209,237.00$0.00$0.00$0.00$0.00$0.00$209,237.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
29-Jul-2016 Tenement ApplicationRTN Procedure : Native Title Cleared - Other ReasonRTN Procedure64.56 HA294014S1192742E127km N'ly of Koolyanobbing13GoldfieldsNative Title Services Goldfields