Tenement: M70-238

View on Landtracker Maps (logon required)

Extracted from MTO on 06-Apr-2026 00:42, last changed 06-Apr-2026.

Tenement Summary

Identifier:M 70/238Type:Mining Lease
Status:LiveDistrict:SOUTH WEST M.F.
Lodged:PERTHArea:571.35000 HA
Purposes:Term:21 Years (Renewed)
Markout:17-Dec-1984 10:00Received:17-Dec-1984 15:35
Commence:27-May-1988 Expiry:26-May-2030

Holders

Company NameSharesTotal Shares
HEIDELBERG MATERIALS AUSTRALIA PTY LTD9696

Applicants on Receival

Company NameSharesTotal Shares
BEBICH, Peter3296
BEBICH, Matthew3296
BEBICH, Yoze3296

Shires

Shire NameShire NumberStartArea
SWAN CITY805017-Dec-1984 571.35000 HA

Conditions

#VerTextStartEnd
11Survey.27-May-1988
21Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which is likely to interfere with or damage any Aboriginal Site.27-May-1988
31Mining on any gazetted road or road reserve being confined to below a depth of 15 metres from the natural surface.27-May-1988
41No mining on Trignometical Station Reserve 11937 without the prior written consent of the Minister for Mines.27-May-1988
53The construction and operation of the project and measures to protect the environment to be carried out in accordance with the documents titled:
  • Gnangara Specaility Silica Sand Project proposal as assessed by the Environmental Protection Authority and fulfilling the commitment given for environmental management;
  • (MCP Reg ID 72869) "Mine Closure Plan Gaskell Avenue Mining Lease 70/238 Rev 1" dated 29 November 2018 signed by Vern Newton, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-72869 as Doc ID 6185826
Where a difference exists between the above document(s)  and the following conditions, then the following conditions shall prevail.
 
29-Jan-2019
52The construction and operation of the project and measures to protect the environment to be carried out in accordance with the documents titled:
  • Gnangara Specaility Silica Sand Project proposal as assessed by the Environmental Protection Authority and fulfilling the commitment given for environmental management;
  • (Reg ID 54087) "Mine Closure Plan Mining Lease 702/238 Gaskell Avenue, Gnangara" dated 27 February 2015 signed by Vernon Newton and retained on Department of Mines and Petroleum File No. EARS-MCP-54087
Where a difference exists between the above document(s)  and the following conditions, then the following conditions shall prevail.
 
10-Jun-2015 28-Jan-2019
51The lessee adhering to the Gnangara Speciality Silica Sand Project proposal as assessed by the Environmental Protection Authority and fulfilling the commitment given for environmental management.27-May-1988 09-Jun-2015
61The lessee ensuring that all waste oils and vehicle washdown water is collected and treated, or disposed offsite, to the satisfaction of the Water Authority of Western Australia.27-May-1988
71The lessee constructing and operating all fuel storage facilites in accordance with the requirements of the Water Authority of Western Australia.27-May-1988
81The lessee submitting brief annual reports to the satisfaction of the Department of Mines describing rehabilitation programmes and summarising monitoring results with respect to environmental management programmes adopted for the project.27-May-1988
91Rehabilitation on private land being an end land use agreed with the land owner, provided that the lessee shall ensure that disturbed area are left in a condition acceptable to the Environmental Protection Authority.27-May-1988
101Prior to commissioning, a dust management programme be developed by the lessee to control dust migration from unstabilised operations areas, to the satisfaction of the Department of Mines. This programme to include a proposal to install an appropriate dust suppression system such as mobile water cannon to control dust during adverse weather conditions.27-May-1988
111The lessee shall not carry out processing activities or place electrical equipment or power lines within 500 metres of the Gnangara Magnetic Observatory for such a period that the Magnetic Observatory is in operation.27-May-1988 21-Aug-2014
121In order to reduce the effects of vibration and magnetic disturbances on the Gnangara Magnetic Observatory, the lessee ensuring that mining and heavy vehicle access to and from the project is kept at a distance of at least 200 metres from the Gnangara Magnetic Observatory. (Except for the intrusion caused by the current alignment of Gaskell Avenue.)27-May-1988 21-Aug-2014
131If, following detailed testing (by the operators of the observatory) it is shown that the vibration and magnetic disturbances associated with the proposals are unacceptable, the Environmental Protection Authority shall modify the requirements of conditions 11 and 12 to ensure that the integrity of the observatory is maintained.27-May-1988 21-Aug-2014
142The lessee paying to the Executive Director, Department of Conservation and Land Management (CALM), compensation for all areas cleared of vegetation for mining, in support of mining and degraded as a result of mining in association with this lease. Provided that the Executive Director and the lessee may agree from time to time that land shall be transferred or works undertaken by the lessee in lieu of payment under this condition. The rate of compensation being $2,789.65 per hectare and adjusted annually by the Executive Director. The C.P.I. for Perth providing the basis of such adjustments. The Executive Director issuing a notice for the amount of compensation due and the lessee paying the amount within 2 months of the date of such notice. A penalty of interest at the Commonwealth bond rate being charged for late payment. The Lessee providing detailed surveys of areas cleared in conjunction with annual mining proposals.11-Jul-1994
141The lessee paying to the Executive Director of the Department of Conservation and Land Management (CALM) compensation for land cleared for on in connection with mining. Compensation being at the rate of $2,158 per hectare and being reviewed three times yearly from the date of grant by the Executive Director.27-May-1988 10-Jul-1994
151The lessee taking all such necessary precautions as may be indicated by the District Manager CALM to prevent the occurrence or spread of any fires within or adjacent to the leased area and undertaking to enter an agreement to commit resources to fire suppression.27-May-1988
161The lessee at his expense rehabilitating all areas affected by mining or operations associated with mining including the rehabilitation enrichment of dieback or other forest disease affected areas. Rehabilitation being to the satisfaction of the Executive Director.27-May-1988
171The lessee reviewing and submitting a triennial "Mine Plan and Environmental Management Programme" for approval to the Director Mining Engineering Division in agreement with the Executive Director CALM.27-May-1988
183The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for State Development for due compliance with the environmental conditions of the lease in the sum of:
  • $305,000
02-Jan-2002 02-Jul-2013
182The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines in the sum of $160,000 for due compliance with the environmental conditions of the lease.31-Dec-1997 01-Jan-2002
181The lessee lodging a security being the sum of $20,000 in the term of Section 26(1)(d) of the Mining Act, 1978 with the Director General of Mines, for due annual performance of the approved plan.27-May-1988 30-Dec-1997
191The Lessee avoiding any disturbance to the Gnangara Fire Tower and its communications. If necessary the Lessee shall relocate the tower and associated equipment at his expense to a site to be agreed.27-May-1988 31-Dec-1997
201The Lessee shall, if necessary, meet any reasonable costs of relocating the Gnangara Forest Settlement in an area within the Conservation and Land Management Wanneroo District, free from the disturbance of mining operations.27-May-1988 31-Dec-1997
211Provisions of the Metropolitan Water Supply and Sewerage and Drainage Act 1909 as amended and the Rights in Water and Irrigation Act 1914 as amended.27-May-1988
221No claim being made against the Water Authority of Western Australia in respect of the effects the abstraction of groundwater by the Authrority in or on the subject of the mining lease.27-May-1988
231No mining within 25 metres of either side of the Dampier to Perth Gas Pipeline and Dongara to Pinjarra Gas Pipeline.22-Jun-1988
241No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (23) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer.22-Jun-1988
251No interference with the drainage pattern, and no parking, storage, or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (23) hereof without the prior approval of the State Energy Commission of Western Australia.22-Jun-1988
261The lessee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (23) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer.22-Jun-1988
271No explosives being used or stored within 150 metres of the Dampier to Perth Gas Pipeline and Dongara to Pinjarra Gas Pipeline without the prior written consent of the State Mining Engineer.22-Jun-1988
281Mining on the Safety Zone established in Condition (23) hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer.22-Jun-1988
291The rights of ingress to and egress from the Dampier to Perth Gas Pipeline Easement and Dongara to Pinjarra Gas Pipeline respectively being at all times preserved for employees, contractors and agents of the operations of the Dampier to Perth Pipeline Authority and State Energy Commission respectively.22-Jun-1988
301Such further conditions as may from time to time be imposed by the Minister for Mines for the purpose of protecting the Dampier to Perth Natural Gas Pipeline and Dongara to Pinjarra Gas Pipeline.22-Jun-1988
313A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2023
29-Jan-2019
312A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
  • 2018
10-Jun-2015 28-Jan-2019
311A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
  • 2015
22-Apr-2013 09-Jun-2015
321The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management plans undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months.  This report to be submitted each year in:
  • February
30-Jul-2013
331Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Executive Director, Environment Division, Department of Mines and Petroleum (DMP) for his assessment and until his written approval to proceed has been obtained.10-Jun-2015
341The development and operations being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.10-Jun-2015
351All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.
 
10-Jun-2015
361At the completion of operations, all buildings and structure being removed from site or demolished and buried to the satisfaction of the Executive Director, Environment Division, DMP.10-Jun-2015
371All rubbish and scrap is to be progressively disposed of in a suitable manner.10-Jun-2015
381Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles.10-Jun-2015

Endorsements

Cond #VerTextStartEnd
11Survey.27-May-1988
21Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which is likely to interfere with or damage any Aboriginal Site.27-May-1988
31Mining on any gazetted road or road reserve being confined to below a depth of 15 metres from the natural surface.27-May-1988
41No mining on Trignometical Station Reserve 11937 without the prior written consent of the Minister for Mines.27-May-1988
53The construction and operation of the project and measures to protect the environment to be carried out in accordance with the documents titled:
  • Gnangara Specaility Silica Sand Project proposal as assessed by the Environmental Protection Authority and fulfilling the commitment given for environmental management;
  • (MCP Reg ID 72869) "Mine Closure Plan Gaskell Avenue Mining Lease 70/238 Rev 1" dated 29 November 2018 signed by Vern Newton, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-72869 as Doc ID 6185826
Where a difference exists between the above document(s)  and the following conditions, then the following conditions shall prevail.
 
29-Jan-2019
52The construction and operation of the project and measures to protect the environment to be carried out in accordance with the documents titled:
  • Gnangara Specaility Silica Sand Project proposal as assessed by the Environmental Protection Authority and fulfilling the commitment given for environmental management;
  • (Reg ID 54087) "Mine Closure Plan Mining Lease 702/238 Gaskell Avenue, Gnangara" dated 27 February 2015 signed by Vernon Newton and retained on Department of Mines and Petroleum File No. EARS-MCP-54087
Where a difference exists between the above document(s)  and the following conditions, then the following conditions shall prevail.
 
10-Jun-2015 28-Jan-2019
51The lessee adhering to the Gnangara Speciality Silica Sand Project proposal as assessed by the Environmental Protection Authority and fulfilling the commitment given for environmental management.27-May-1988 09-Jun-2015
61The lessee ensuring that all waste oils and vehicle washdown water is collected and treated, or disposed offsite, to the satisfaction of the Water Authority of Western Australia.27-May-1988
71The lessee constructing and operating all fuel storage facilites in accordance with the requirements of the Water Authority of Western Australia.27-May-1988
81The lessee submitting brief annual reports to the satisfaction of the Department of Mines describing rehabilitation programmes and summarising monitoring results with respect to environmental management programmes adopted for the project.27-May-1988
91Rehabilitation on private land being an end land use agreed with the land owner, provided that the lessee shall ensure that disturbed area are left in a condition acceptable to the Environmental Protection Authority.27-May-1988
101Prior to commissioning, a dust management programme be developed by the lessee to control dust migration from unstabilised operations areas, to the satisfaction of the Department of Mines. This programme to include a proposal to install an appropriate dust suppression system such as mobile water cannon to control dust during adverse weather conditions.27-May-1988
111The lessee shall not carry out processing activities or place electrical equipment or power lines within 500 metres of the Gnangara Magnetic Observatory for such a period that the Magnetic Observatory is in operation.27-May-1988 21-Aug-2014
121In order to reduce the effects of vibration and magnetic disturbances on the Gnangara Magnetic Observatory, the lessee ensuring that mining and heavy vehicle access to and from the project is kept at a distance of at least 200 metres from the Gnangara Magnetic Observatory. (Except for the intrusion caused by the current alignment of Gaskell Avenue.)27-May-1988 21-Aug-2014
131If, following detailed testing (by the operators of the observatory) it is shown that the vibration and magnetic disturbances associated with the proposals are unacceptable, the Environmental Protection Authority shall modify the requirements of conditions 11 and 12 to ensure that the integrity of the observatory is maintained.27-May-1988 21-Aug-2014
142The lessee paying to the Executive Director, Department of Conservation and Land Management (CALM), compensation for all areas cleared of vegetation for mining, in support of mining and degraded as a result of mining in association with this lease. Provided that the Executive Director and the lessee may agree from time to time that land shall be transferred or works undertaken by the lessee in lieu of payment under this condition. The rate of compensation being $2,789.65 per hectare and adjusted annually by the Executive Director. The C.P.I. for Perth providing the basis of such adjustments. The Executive Director issuing a notice for the amount of compensation due and the lessee paying the amount within 2 months of the date of such notice. A penalty of interest at the Commonwealth bond rate being charged for late payment. The Lessee providing detailed surveys of areas cleared in conjunction with annual mining proposals.11-Jul-1994
141The lessee paying to the Executive Director of the Department of Conservation and Land Management (CALM) compensation for land cleared for on in connection with mining. Compensation being at the rate of $2,158 per hectare and being reviewed three times yearly from the date of grant by the Executive Director.27-May-1988 10-Jul-1994
151The lessee taking all such necessary precautions as may be indicated by the District Manager CALM to prevent the occurrence or spread of any fires within or adjacent to the leased area and undertaking to enter an agreement to commit resources to fire suppression.27-May-1988
161The lessee at his expense rehabilitating all areas affected by mining or operations associated with mining including the rehabilitation enrichment of dieback or other forest disease affected areas. Rehabilitation being to the satisfaction of the Executive Director.27-May-1988
171The lessee reviewing and submitting a triennial "Mine Plan and Environmental Management Programme" for approval to the Director Mining Engineering Division in agreement with the Executive Director CALM.27-May-1988
183The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for State Development for due compliance with the environmental conditions of the lease in the sum of:
  • $305,000
02-Jan-2002 02-Jul-2013
182The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines in the sum of $160,000 for due compliance with the environmental conditions of the lease.31-Dec-1997 01-Jan-2002
181The lessee lodging a security being the sum of $20,000 in the term of Section 26(1)(d) of the Mining Act, 1978 with the Director General of Mines, for due annual performance of the approved plan.27-May-1988 30-Dec-1997
191The Lessee avoiding any disturbance to the Gnangara Fire Tower and its communications. If necessary the Lessee shall relocate the tower and associated equipment at his expense to a site to be agreed.27-May-1988 31-Dec-1997
201The Lessee shall, if necessary, meet any reasonable costs of relocating the Gnangara Forest Settlement in an area within the Conservation and Land Management Wanneroo District, free from the disturbance of mining operations.27-May-1988 31-Dec-1997
211Provisions of the Metropolitan Water Supply and Sewerage and Drainage Act 1909 as amended and the Rights in Water and Irrigation Act 1914 as amended.27-May-1988
221No claim being made against the Water Authority of Western Australia in respect of the effects the abstraction of groundwater by the Authrority in or on the subject of the mining lease.27-May-1988
231No mining within 25 metres of either side of the Dampier to Perth Gas Pipeline and Dongara to Pinjarra Gas Pipeline.22-Jun-1988
241No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (23) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer.22-Jun-1988
251No interference with the drainage pattern, and no parking, storage, or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (23) hereof without the prior approval of the State Energy Commission of Western Australia.22-Jun-1988
261The lessee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (23) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer.22-Jun-1988
271No explosives being used or stored within 150 metres of the Dampier to Perth Gas Pipeline and Dongara to Pinjarra Gas Pipeline without the prior written consent of the State Mining Engineer.22-Jun-1988
281Mining on the Safety Zone established in Condition (23) hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer.22-Jun-1988
291The rights of ingress to and egress from the Dampier to Perth Gas Pipeline Easement and Dongara to Pinjarra Gas Pipeline respectively being at all times preserved for employees, contractors and agents of the operations of the Dampier to Perth Pipeline Authority and State Energy Commission respectively.22-Jun-1988
301Such further conditions as may from time to time be imposed by the Minister for Mines for the purpose of protecting the Dampier to Perth Natural Gas Pipeline and Dongara to Pinjarra Gas Pipeline.22-Jun-1988
313A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2023
29-Jan-2019
312A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
  • 2018
10-Jun-2015 28-Jan-2019
311A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
  • 2015
22-Apr-2013 09-Jun-2015
321The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management plans undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months.  This report to be submitted each year in:
  • February
30-Jul-2013
331Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Executive Director, Environment Division, Department of Mines and Petroleum (DMP) for his assessment and until his written approval to proceed has been obtained.10-Jun-2015
341The development and operations being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.10-Jun-2015
351All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.
 
10-Jun-2015
361At the completion of operations, all buildings and structure being removed from site or demolished and buried to the satisfaction of the Executive Director, Environment Division, DMP.10-Jun-2015
371All rubbish and scrap is to be progressively disposed of in a suitable manner.10-Jun-2015
381Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles.10-Jun-2015

Dealings

TypeNumberDetails
Application to Amend940H/878Lodged 9:30 AM on 07 Jun 1988 amending the 5th leg of the description to read: "Thence along Western side Plantation Road for 240m at 140 degrees"REGISTERED 9:30 AM 07 Jun 1988
Mortgage1H/889Lodged 11:15 AM on 30 Jun 1988 in favour of NATIONAL AUSTRALIA BANK LTDREGISTERED 11:15 AM 30 Jun 1988Discharged by Withdrawal 796H/901 lodged 11:00:00 AM on 21 Sep 1990
Mortgage - Discharge796H/901In respect to Mortgage 1H/889 lodged 11:00:00 AM on 21 Sep 1990REGISTERED 11:00 AM 21 Sep 1990
Mortgage24H/901Lodged 11:00AM on 21 Sep 1990 in favour of PATA NOMINEES PTY LTDREGISTERED 11:00 AM 21 Sep 1990Discharged by Withdrawal 1724H/901 lodged 9:00:00 AM on 19 Feb 1991Lodged:11:00 21 September 1990Mortgaged Shares:32/96 shares BEBICH, Yoze 32/96 shares BEBICH, Peter Patrick 32/96 shares BEBICH, Matthew MarkMortgagee:PATA NOMINEES PTY LTDREGISTERED:11:00 21 September 1990DISCHARGED:09:00 19 February 1991Full Discharge:1724H/901 Registered 09:00 19 February 1991
Mortgage - Discharge1724H/901In respect to Mortgage 24H/901 lodged 9:00:00 AM on 19 Feb 1991REGISTERED 9:00 AM 19 Feb 1991
Caveat1481H/901Lodged 9:00 AM on 19 Feb 1991by AMATEK LTD in respect to 32/96ths shares in the name of Yoze BEBICHRECORDED 9:00 AM 19 Feb 1991Re Agreement 64H/923 14 day notice sent on 02 Nov 1992LAPSED 9:00 AM 17 Nov 1992
Caveat1482H/901Lodged 9:00 AM on 19 Feb 1991by AMATEK LTD in respect to 32/96ths shares in the name of Peter Patrick BEBICHRECORDED 9:00 AM 19 Feb 1991Re Agreement 64H/923 14 day notice sent on 02 Nov 1992LAPSED 9:00 AM 17 Nov 1992
Caveat1483H/901Lodged 9:00 AM on 19 Feb 1991by AMATEK LTD in respect to 32/96ths shares in the name of Matthew Mark BEBICHRECORDED 9:00 AM 19 Feb 1991Re Agreement 64H/923 14 day notice sent on 02 Nov 1992LAPSED 9:00 AM 17 Nov 1992
Agreement64H/923Agreement (Sale and Purchase) Matthew Mark BEBICH, Peter Patrick BEBICH, Yoze BEBICH, SILICA SALES PTY LTD and AMATEK LTD Lodged 10:40 AM on 27 Oct 1992REGISTERED 9:00 AM 17 Nov 1992
BondPE3721Lodged on 09 Dec 1997 For $160,000.00RECORDED 09 Dec 1997RETIRED 23 Apr 2002
Application to Amend164H/990Lodged 9:30:00 AM on 17 Dec 1999 amending address to read: "1 Casella Place, Kewdale, WA 6105"REGISTERED 9:30 AM 17 Dec 1999
Bond Requirement309668Requirement Date:02/01/2002Amount:$305,000.00RECORDED:11:37:52 02 January 2002FINALISED:09:40:09 24 October 2014
BondPE7218Lodged on 26 Mar 2002 For $305,000.00RECORDED 26 Mar 2002RETIRED 28 Jan 2005
Bond206326Lodged on 23 Nov 2004 For $305,000.00RECORDED 23 Nov 2004Lodged:00:00 23 November 2004Bond Type:Unconditional Performance BondBond Amount:$305,000.00RECORDED:23 November 2004RETIRED - MRF:24 October 2014
Extension / Renewal of Term298735Lodged 9:30:00 AM on 02 Sep 2008 applied for a period of 21 YearsRECORDED 9:30 AM 02 Sep 2008GRANTED 03 Sep 2008 for a further period of 21 Years
Forfeiture327991Initiated:19/08/2009 for non-compliance with expenditure conditionsRECORDED:11:10:40 18 August 2009Notice Issued:Regulation 50 Notice sent 19/08/2009 for non-compliance with expenditure conditions pursuant to Reg 31 & 32.Compliance Date:21/09/2009FINALISED:Order by Minister on 23 September 2009 that Penalty Imposed
Fine330907Fine in respect to:Forfeiture Process 327991Fine reason:Non-compliance with expenditure obligationsPenalty amount:$360.00Notification date:25/09/2009Due date:26/10/2009Pursuant to:Section 97(5)RECORDED:25 September 2009PAYMENT RECEIVED:07 October 2009Receipt Number:70744Amount:$360.00Remaining balance:$0.00FINALISED:07 October 2009
Application to Amend413848Lodged:14:50 20 December 2012Amending:Address (Including DTC Details)From:ROCLA PTY LIMITED, PO BOX 469, CLOVERDALE, WA, 6985To:ROCLA PTY LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:14:50 20 December 2012
Caveat481706Lodged:09:30 15 February 2016Caveat Type:Absolute CaveatCaveator:HANSON CONSTRUCTION MATERIALS PTY LTDShares Caveated:96/96 shares ROCLA PTY LIMITEDRECORDED:09:30 15 February 2016WITHDRAWN:15:40 15 June 2016
Withdrawal of Dealing488615Lodged:15:40 15 June 2016In respect to:Caveat 481706RECORDED:15:40 15 June 2016
Application to Amend489142Lodged:11:51:25 23 June 2016Amending:Address (Including DTC Details)From:Principal Place of Business : HANSON CONSTRUCTION MATERIALS PTY LTD, LEVEL 10, 35 CLARENCE STREET, SYDNEY, NSW, 2000 and DTC :HANSON CONSTRUCTION MATERIALS PTY LTD, LEVEL 10, 35 CLARENCE STREET, SYDNEY, NSW, 2000To:Principal Place of Business : HANSON CONSTRUCTION MATERIALS PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :HANSON CONSTRUCTION MATERIALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:11:51:25 23 June 2016
Application to Amend504082Lodged:15:32:02 06 April 2017Amending:Address (Including DTC Details)From:Principal Place of Business : HANSON CONSTRUCTION MATERIALS PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :HANSON CONSTRUCTION MATERIALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : HANSON CONSTRUCTION MATERIALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :HANSON CONSTRUCTION MATERIALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:32:02 06 April 2017
Application to Amend719527Lodged:16:19:28 13 November 2024Amending:NameFrom:HANSON CONSTRUCTION MATERIALS PTY LTDTo:HEIDELBERG MATERIALS AUSTRALIA PTY LTDRECORDED:16:19:28 13 November 2024

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202602-May-2025 53273655035$16,359.20571.35000 HA30-Jul-1988 $16,359.20$0.00
Rental202527-May-2024 43973321526$14,872.00571.35000 HA30-Jul-1988 $14,872.00$0.00
Rental202426-May-2023 33927450891$13,728.00571.35000 HA30-Jul-1988 $13,728.00$0.00
Rental202327-May-2022 23946246991$12,584.00571.35000 HA30-Jul-1988 $12,584.00$0.00
Rental202227-May-2021 13940260855$11,440.00571.35000 HA30-Jul-1988 $11,440.00$0.00
Rental202127-May-2020 53978486349$11,325.60571.35000 HA30-Jul-1988 $11,325.60$0.00
Rental202022-May-2019 93812878440$10,696.40571.35000 HA30-Jul-1988 $10,696.40$0.00
Rental201909-May-2018 83461977145$10,067.20571.35000 HA30-Jul-1988 $10,067.20$0.00
Rental201801-May-2017 73247819435$9,752.60571.35000 HA30-Jul-1988 $9,752.60$0.00
Rental201715-Apr-2016 06-153284PERTH$9,438.00571.35000 HA30-Jul-1988 $9,438.00$0.00
Rental201604-May-2015 06-145050PERTH$9,209.20571.35000 HA30-Jul-1988 $9,209.20$0.00
Rental201512-May-2014 06-134989PERTH$8,980.40571.35000 HA30-Jul-1988 $8,980.40$0.00
Rental201421-May-2013 06-124154PERTH$8,808.80571.35000 HA30-Jul-1988 $8,808.80$0.00
Rental201320-Apr-2012 06-108787PERTH$8,580.00571.35000 HA30-Jul-1988 $8,580.00$0.00
Rental201220-May-2011 94438PERTH$9,123.40571.35000 HA30-Jul-1988 $9,123.40$0.00
Rental201114-May-2010 79205PERTH$8,934.64571.35000 HA30-Jul-1988 $8,934.64$0.00
Rental201002-Sep-2008 55786PERTH$8,557.12571.35000 HA30-Jul-1988 $8,557.12$0.00
Rental200923-May-2008 51850PERTH$8,305.44571.35000 HA30-Jul-1988 $8,305.44$0.00
Rental200811-May-2007 37390PERTH$7,927.92571.35000 HA30-Jul-1988 $7,927.92$0.00
Rental200719-May-2006 24458PERTH$7,676.24571.35000 HA30-Jul-1988 $7,676.24$0.00
Rental200613-May-2005 10973PERTH$7,487.48571.35000 HA30-Jul-1988 $7,487.48$0.00
Rental200507-May-2004 71696PERTH$7,298.72571.35000 HA30-Jul-1988 $7,298.72$0.00
Rental200416-May-2003 60412PERTH$7,047.04571.35000 HA30-Jul-1988 $7,047.04$0.00
Rental200303-May-2002 48314PERTH$6,864.00571.35000 HA30-Jul-1988 $6,864.00$0.00
Rental200211-May-2001 36476PERTH$6,480.76571.35000 HA30-Jul-1988 $6,480.76$0.00
Rental200108-Sep-2008 56016PERTH$0.02571.35000 HA30-Jul-1988 $6,424.27$0.00
Rental200126-May-2000 23395PERTH$6,424.25
Rental200017-May-1999 11393PERTH$5,891.60571.35000 HA30-Jul-1988 $5,891.60$0.00
Rental199921-May-1998 178694PERTH$5,720.00571.35000 HA30-Jul-1988 $5,720.00$0.00
Rental199826-May-1997 162180PERTH$5,720.00571.35000 HA30-Jul-1988 $5,720.00$0.00
Rental199727-May-1996 143790PERTH$5,720.00571.35000 HA30-Jul-1988 $5,720.00$0.00
Rental199608-Sep-2008 56016PERTH$269.70571.35000 HA30-Jul-1988 $5,319.60$0.00
Rental199611-Jul-1995 128755PERTH$50.00
Rental199607-Jun-1995 127099PERTH$4,999.90
Rental199508-Sep-2008 56016PERTH$269.70571.35000 HA30-Jul-1988 $5,319.60$0.00
Rental199518-May-1994 108130PERTH$5,049.90
Rental199408-Sep-2008 56016PERTH$269.70571.35000 HA30-Jul-1988 $5,319.60$0.00
Rental199428-May-1993 90500PERTH$5,049.90
Rental199308-Sep-2008 56016PERTH$269.70571.35000 HA30-Jul-1988 $5,319.60$0.00
Rental199325-May-1992 74709PERTH$5,049.90
Rental199208-Sep-2008 56016PERTH$252.30571.35000 HA30-Jul-1988 $4,976.40$0.00
Rental199217-May-1991 58083PERTH$4,724.10
Rental199108-Sep-2008 56016PERTH$252.30571.35000 HA30-Jul-1988 $4,976.40$0.00
Rental199128-Sep-1990 47953PERTH$4,724.10
Rental199008-Sep-2008 56016PERTH$234.90571.35000 HA30-Jul-1988 $4,633.20$0.00
Rental199014-Aug-1989 1PERTH$4,398.30
Rental198908-Sep-2008 56016PERTH$174.00571.35000 HA30-Jul-1988 $3,432.00$0.00
Rental198917-Dec-1984 1KARRATHA$3,258.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$57,200.00false
2025$57,200.0010-Jun-2025 $7,502,354.00$0.00$7,474,969.00$0.00$15,945.00$11,440.00$0.00false
2024$57,200.0025-Jul-2024 $10,274,236.00$0.00$10,261,760.00$0.00$1,036.00$11,440.00$0.00false
2023$57,200.0025-Jul-2023 $15,750,834.00$0.00$15,642,923.00$0.00$14,711.00$93,200.00$0.00false
2022$57,200.0020-Jul-2022 $13,916,621.00$0.00$13,891,659.00$0.00$13,562.00$11,400.00$0.00false
2021$57,200.0023-Jul-2021 $12,716,333.00$0.00$12,692,479.00$0.00$12,414.00$11,440.00$0.00false
2020$57,200.0024-Jul-2020 $11,448,659.00$0.00$11,424,919.00$0.00$12,300.00$11,440.00$0.00false
2019$57,200.0011-Jul-2019 $13,370,862.00$0.00$13,347,764.00$0.00$11,658.00$11,440.00$0.00false
2018$57,200.0018-Jul-2018 $14,999,461.08$0.00$14,976,608.28$0.00$11,412.80$11,440.00$0.00false
2017$57,200.0024-Jul-2017 $7,001,358.00$0.00$5,823,796.00$0.00$10,669.00$1,166,893.00$0.00false
2016Replacement$57,200.0004-Aug-2016 $6,551,889.00$0.00$5,449,701.00$0.00$10,351.00$1,091,837.00$0.00false
2016$57,200.0025-Jul-2016 $6,567,650.00$70,393.00$5,392,298.00$0.00$10,351.00$1,094,608.00$0.00true
2015$57,200.0024-Jul-2015 $9,757,361.00$0.00$8,451,290.00$0.00$38,378.00$1,267,693.00$0.00false
2014$57,200.0022-Jul-2014 $9,312,605.00$553,839.00$7,492,737.00$0.00$8,808.00$1,257,221.00$0.00false
2013$57,200.0018-Jul-2013 $8,022,140.00$0.00$8,002,120.00$0.00$8,580.00$11,440.00$0.00false
2012$57,200.0019-Jul-2012 $8,726,952.00$0.00$7,582,827.00$0.00$8,294.00$1,135,831.00$0.00false
2011$57,200.0022-Jul-2011 $11,458,702.00$0.00$9,957,752.00$0.00$8,122.00$1,492,828.00$0.00false
2010$57,200.0002-Jul-2010 $8,321,304.00$0.00$7,223,680.00$0.00$9,026.00$1,088,598.00$0.00false
2009$57,200.0019-Aug-2009 $8,622,362.00$0.00$7,597,266.00$0.00$8,039.00$1,017,057.00$0.00false
2008$57,200.0014-Jul-2008 $11,032,761.00$325,807.00$8,954,178.00$0.00$30,212.00$1,722,564.00$0.00false
2007$57,200.0018-Jul-2007 $7,936,608.00$301,398.00$6,640,521.00$0.00$15,080.00$979,609.00$0.00false
2006$57,200.0029-Jun-2006 $5,389,770.00$181,246.00$4,423,458.00$0.00$156,751.00$628,315.00$0.00false
2005$57,200.0016-Jun-2005 $4,967,495.00$174,811.00$3,930,308.00$0.00$149,459.00$712,917.00$0.00false
2004$57,200.0010-Jun-2004 $4,514,083.00$162,823.00$3,499,491.00$0.00$136,010.00$715,759.00$0.00false
2003$57,200.0011-Jul-2003 $3,901,673.00$161,653.00$3,258,637.00$0.00$129,712.00$351,671.00$0.00false
2002$57,200.0018-Jun-2002 $3,760,870.00$0.00$0.00$0.00$0.00$0.00$0.00false
2001$57,200.0026-Jul-2001 $2,384,848.00$0.00$0.00$0.00$0.00$0.00$0.00false
2000$57,200.0031-Jul-2000 $2,824,980.00$0.00$0.00$0.00$0.00$0.00$0.00false
1999$57,200.0022-Jun-1999 $1,835,609.00$0.00$0.00$0.00$0.00$0.00$0.00false
1998$57,200.0022-Jul-1998 $1,934,538.00$0.00$0.00$0.00$0.00$0.00$0.00false
1997$57,200.0024-Jul-1997 $1,855,915.00$0.00$0.00$0.00$0.00$0.00$0.00false
1996$57,200.0002-Aug-1996 $1,036,059.00$0.00$0.00$0.00$0.00$0.00$0.00false
1995$57,200.0028-Jun-1995 $360,154.00$0.00$0.00$0.00$0.00$0.00$0.00false
1994$57,200.0017-Jun-1994 $789,754.00$0.00$0.00$0.00$0.00$0.00$0.00false
1993$57,200.0007-Oct-1993 $312,349.00$0.00$0.00$0.00$0.00$0.00$0.00false
1992$57,200.0031-Jul-1992 $319,547.00$0.00$0.00$0.00$0.00$0.00$0.00false
1991$57,200.0001-Jul-1991 $57,167.00$0.00$0.00$0.00$0.00$0.00$0.00false
1990$57,200.0013-Sep-1990 $27,800.00$0.00$0.00$0.00$0.00$0.00$0.00false
1989$56,500.0008-Sep-1989 $786,000.00$0.00$0.00$0.00$0.00$0.00$0.00false

Bond

Bond NumberNameSuretyAmountBond DateStatusStatus DateTypeCeasedOther Affected Tenements
206326Bond - Unconditional Performance BondAUSTRALIA AND NEW ZEALAND BANKING GROUP LTD$305,000.00 (Inital)23-Nov-2004 Retired - MRF24-Oct-2014 Unconditional Performance Bondtrue
PE7218Bond - Unconditional Performance BondCOMMONWEALTH BANK OF AUSTRALIA$305,000.00 (Inital)26-Mar-2002 Retired28-Jan-2005 Unconditional Performance Bondtrue
309668Bond Requirement$305,000.0002-Jan-2002 Finalised24-Oct-2014 true
PE3721Bond - Unconditional Performance BondCOMMONWEALTH BANK OF AUSTRALIA$160,000.00 (Inital)09-Dec-1997 Retired23-Apr-2002 Unconditional Performance Bondtrue

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
Tenement Application