Extracted from MTO on 07-May-2025 00:44,
last changed 08-Oct-2024.
# | Ver | Text | Start | End |
1 | 1 | Survey. | 08-Aug-2003 | |
2 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 08-Aug-2003 | |
3 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
3 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 08-Aug-2003 | 11-Aug-2005 |
4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Aug-2003 | |
5 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
5 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Aug-2003 | 11-Aug-2005 |
6 | 2 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 12-Aug-2005 | |
6 | 1 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the State Mining Engineer for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 08-Aug-2003 | 11-Aug-2005 |
7 | 1 | Mining on any road, road verge or road reserve being confined to below a depth of 15 metres from the natural surface. | 08-Aug-2003 | |
8 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg iD: 58474) "Cadoux Kaolin Project - Mining Proposal - Revised" dated 1 March 2016 signed by Mark Garner - Director, and retained on Department of Mines and Petroleum file no. EARS-MPMCP-58474;
- (MCP Reg ID: 58474) "Cadoux Kaolin Project - Preliminary Mine Closure Plan for OZ Kaolin Resources Pty Ltd - Revised " dated 1 February 2016 signed by Mark Garner - Director, and retained on Department of Mines and Petroleum file no. EARS-MPMCP-58474.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 11-Apr-2016 | 09-Jan-2020 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 11-Apr-2016 | |
10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 11-Apr-2016 | |
11 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 11-Apr-2016 | |
12 | 1 | The Lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 11-Apr-2016 | |
13 | 1 | Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability. | 11-Apr-2016 | |
14 | 2 | On the completion of operations or progressively where possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety. | 09-Jan-2020 | |
14 | 1 | On the completion of operations or progressively where possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP. | 11-Apr-2016 | 08-Jan-2020 |
15 | 2 | An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 09-Jan-2020 | |
15 | 1 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, mine site environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 11-Apr-2016 | 08-Jan-2020 |
16 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 09-Jan-2020 | |
16 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 11-Apr-2016 | 08-Jan-2020 |
17 | 1 | All mining operations to meet the environmental outcomes as measured by the performance criteria stated in table 12 of the Mining Proposal (Reg ID: 81473) "Cadoux Kaolin Project Mining Proposal" dated 30 October 2019 signed by Mark Garner, and retained on Department of Mines, Industry Regulation and Safety file number EARS-MPMCP-81473 as Doc ID 6950920. | 09-Jan-2020 | |
18 | 1 | All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 30 October 2019 and retained on Department of Mines, Industry Regulation and Safety file no. EARS-MPMCP-81473 as Doc ID 6950922. | 09-Jan-2020 | |
19 | 1 | No alteration or expansion of mining operations beyond the activities detailed in Tables on page 12-19 of the Mining Proposal (Reg ID: 81473) “Cadoux Kaolin Project Mining Proposal” dated 30 October 2019 signed by Mark Garner, and retained on Department of Mines, Industry Regulation and Safety file no. EARS-MPMCP-81473 as Doc ID 6950920. | 09-Jan-2020 | |
20 | 1 | Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID: 81473 ) “Cadoux Kaolin Project Revised Mine Closure Plan for Ozkaolin Resources Pty Ltd" dated 30 October 2019 signed by Mark Garner, and retained on Department of Mines, Industry Regulation and Safety file number EARS-MPMCP-81473 as Doc ID 6950921 . | 09-Jan-2020 | |
21 | 1 | Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident. | 09-Jan-2020 | |
22 | 1 | Report any breach of environmental outcome or performance criteria stated in Table 12 of the Mining Proposal (Reg ID: 81473) "Cadoux Kaolin Project Mining Proposal” dated 30 October 2019 signed by Mark Garner, and retained on Department of Mines, Industry Regulation and Safety file no. EARS-MPMCP-81473 as Doc ID 6950920, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the breach. | 09-Jan-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | Survey. | 08-Aug-2003 | |
2 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 08-Aug-2003 | |
3 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
3 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 08-Aug-2003 | 11-Aug-2005 |
4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Aug-2003 | |
5 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
5 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Aug-2003 | 11-Aug-2005 |
6 | 2 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 12-Aug-2005 | |
6 | 1 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the State Mining Engineer for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 08-Aug-2003 | 11-Aug-2005 |
7 | 1 | Mining on any road, road verge or road reserve being confined to below a depth of 15 metres from the natural surface. | 08-Aug-2003 | |
8 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg iD: 58474) "Cadoux Kaolin Project - Mining Proposal - Revised" dated 1 March 2016 signed by Mark Garner - Director, and retained on Department of Mines and Petroleum file no. EARS-MPMCP-58474;
- (MCP Reg ID: 58474) "Cadoux Kaolin Project - Preliminary Mine Closure Plan for OZ Kaolin Resources Pty Ltd - Revised " dated 1 February 2016 signed by Mark Garner - Director, and retained on Department of Mines and Petroleum file no. EARS-MPMCP-58474.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 11-Apr-2016 | 09-Jan-2020 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 11-Apr-2016 | |
10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 11-Apr-2016 | |
11 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 11-Apr-2016 | |
12 | 1 | The Lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 11-Apr-2016 | |
13 | 1 | Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability. | 11-Apr-2016 | |
14 | 2 | On the completion of operations or progressively where possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety. | 09-Jan-2020 | |
14 | 1 | On the completion of operations or progressively where possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP. | 11-Apr-2016 | 08-Jan-2020 |
15 | 2 | An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 09-Jan-2020 | |
15 | 1 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, mine site environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 11-Apr-2016 | 08-Jan-2020 |
16 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 09-Jan-2020 | |
16 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 11-Apr-2016 | 08-Jan-2020 |
17 | 1 | All mining operations to meet the environmental outcomes as measured by the performance criteria stated in table 12 of the Mining Proposal (Reg ID: 81473) "Cadoux Kaolin Project Mining Proposal" dated 30 October 2019 signed by Mark Garner, and retained on Department of Mines, Industry Regulation and Safety file number EARS-MPMCP-81473 as Doc ID 6950920. | 09-Jan-2020 | |
18 | 1 | All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 30 October 2019 and retained on Department of Mines, Industry Regulation and Safety file no. EARS-MPMCP-81473 as Doc ID 6950922. | 09-Jan-2020 | |
19 | 1 | No alteration or expansion of mining operations beyond the activities detailed in Tables on page 12-19 of the Mining Proposal (Reg ID: 81473) “Cadoux Kaolin Project Mining Proposal” dated 30 October 2019 signed by Mark Garner, and retained on Department of Mines, Industry Regulation and Safety file no. EARS-MPMCP-81473 as Doc ID 6950920. | 09-Jan-2020 | |
20 | 1 | Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID: 81473 ) “Cadoux Kaolin Project Revised Mine Closure Plan for Ozkaolin Resources Pty Ltd" dated 30 October 2019 signed by Mark Garner, and retained on Department of Mines, Industry Regulation and Safety file number EARS-MPMCP-81473 as Doc ID 6950921 . | 09-Jan-2020 | |
21 | 1 | Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident. | 09-Jan-2020 | |
22 | 1 | Report any breach of environmental outcome or performance criteria stated in Table 12 of the Mining Proposal (Reg ID: 81473) "Cadoux Kaolin Project Mining Proposal” dated 30 October 2019 signed by Mark Garner, and retained on Department of Mines, Industry Regulation and Safety file no. EARS-MPMCP-81473 as Doc ID 6950920, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the breach. | 09-Jan-2020 | |
Type | Number | Details |
Application to Amend | 369H/023 | Lodged 9:30:00 AM on 26 May 2003 amending holders to: Colin Kingsley FITZGERALD - 25/100ths shares, Jacomyntje Johanna A FITZGERALD - 25/100ths shares, BIRKDALE ENTERPRISES PTY LTD - 50/100ths sharesREGISTERED 9:30 AM 26 May 2003 |
Application to Amend | 685H/056 | Lodged 4:20:00 PM on 10 Mar 2006 amending the address for Birkdale Enterprises Pty Ltd to read " c/- Western Tenement Services, PO Box 8335, Perth Business Centre, Perth WA 6849 "RECORDED 4:20 PM 10 Mar 2006 |
Application to Amend | 686H/056 | Lodged 4:20:00 PM on 10 Mar 2006 amending the address for Colin Kingsley Fitzgerald to read " c/- Western Tenement Services, PO Box 8335, Perth Business Centre, Perth WA 6849 "RECORDED 4:20 PM 10 Mar 2006 |
Application to Amend | 687H/056 | Lodged 4:20:00 PM on 10 Mar 2006 amending the address for Jacomyntje Johanna Fitzgerald to read " c/- Western Tenement Services, PO Box 8335, Perth Business Centre, Perth WA 6849 "RECORDED 4:20 PM 10 Mar 2006 |
Extension of Time | 247786 | Lodged 4:06 PM on 12 Sep 2006 to extend time to lodge a statutory declaration in support of Application 39H/067 for exemption from expenditure condition to 19 September 2006Approved on 14 Sep 2006 |
Extension of Time | 303015 | Lodged 10:38 AM on 30 Oct 2008 to extend time to lodge a statutory declaration in support of Application 300910 for exemption from expenditure condition to 20 November 2008Approved on 30 Oct 2008 |
Forfeiture | 384675 | Initiated:03/11/2011 for non-compliance with reporting requirementsRECORDED:11:20:29 04 November 2011Notice Issued:Regulation 50 Notice sent 03/11/2011 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:05/12/2011FINALISED:Order by Minister on 16 February 2012 that M 70/1141 be Penalty Imposed |
Fine | 391570 | Fine in respect to:Forfeiture Process 384675Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$180.00Notification date:16/02/2012Due date:23/03/2012Pursuant to:Section 97(5)RECORDED:16 February 2012PAYMENT RECEIVED:17 February 2012Receipt Number:06-106195Amount:$180.00Remaining balance:$0.00FINALISED:17 February 2012 |
Caveat | 479291 | Lodged:09:30 21 December 2015Caveat Type:Consent CaveatCaveator:OZKAOLIN PTY LTDShares Caveated:50/100 shares FITZGERALD, Colin Kingsley
50/100 shares FITZGERALD, Jacomyntje Johanna AdriannaRECORDED:09:30 21 December 2015WITHDRAWN:13:41:07 08 October 2019 |
Caveat | 481407 | Lodged:15:50 08 February 2016Caveat Type:Consent CaveatCaveator:FARASAN PTY LTD AS TRUSTEE FOR THE DRAGE SANDERS FAMILY TRUSTShares Caveated:50/100 shares FITZGERALD, Colin Kingsley
50/100 shares FITZGERALD, Jacomyntje Johanna AdriannaRECORDED:15:50 08 February 2016Re: Transfer 564380 - Consent of Warden for Transfer to be registered and caveat to remain in full force and effect made 21/10/2019. |
Application to Amend | 486600 | Lodged:14:40 11 May 2016Amending:Address (Including DTC Details)From:FITZGERALD, Colin Kingsley, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD, WA, 6924To:FITZGERALD, Colin Kingsley, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892From:FITZGERALD, Jacomyntje Johanna Adrianna, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD, WA, 6924To:FITZGERALD, Jacomyntje Johanna Adrianna, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892RECORDED:14:40 11 May 2016 |
Withdrawal of Dealing | 564382 | Lodged:13:41:07 08 October 2019In respect to:Caveat 479291RECORDED:13:41:07 08 October 2019 |
Extension of Time | 690143 | Lodged:16:02:41 15 November 2023Type:Stat DecRECORDED:16:02:41 15 November 2023APPROVED:13:57 16 November 2023Time to lodge extended to 15 November 2023 |
Extension / Renewal of Term | 708716 | Lodged:14:31:08 05 July 2024Applied For Period:21 YearsRECORDED:14:31:08 05 July 2024GRANTED:12 July 2024Granted Period:21 YearsTerm Renewed To:07/08/2045 |