Extracted from MTO on 06-Aug-2025 01:21,
last changed 30-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | Survey. | 03-Feb-1989 | |
2 | 1 | Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which is likely to interfere with or damage any Aboriginal site. | 03-Feb-1989 | |
3 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 03-Feb-1989 | |
4 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
4 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 03-Feb-1989 | 11-Aug-2005 |
5 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Feb-1989 | |
6 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface clearing or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
6 | 1 | Unless the written approval of the District Mining Engineer, Department of Mines, is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface clearing or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Feb-1989 | 11-Aug-2005 |
7 | 2 | No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained. | 12-Aug-2005 | |
7 | 1 | No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained. | 03-Feb-1989 | 11-Aug-2005 |
8 | 1 | Pursuant to Section 29 of the Mining Act 1978 and Clause 13A of the Transitional Provisions, Second Schedule of the Act, the grant in respect of all private land other than those the subject of compensation agreements under the transitioned Mineral Claims, being confined to below a depth of thirty metres from the natural surface. | 03-Feb-1989 | |
9 | 1 | No mining on Railway Ballast Pit Reserve 16394, Camping Reserve 23467 and the Murray River without the prior written consent of the Minister for Mines. | 03-Feb-1989 | |
10 | 1 | No mining on any road or road reserve being confined to below a depth of 15 metres from the natural surface. | 03-Feb-1989 | |
11 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 59140) "Worsley Alumina - Boddington Bauxite Mine Mining Proposal (Updated) M70/110, M70/111, M70/112, M70/113 and M70/554" dated 19 May 2016 signed by Alysia Tringrove and retained on Department of Mines and Petroleum File No. EARS-MPMCP-59140 as Doc ID 4256167;
- (MCP Reg ID 59140) "Boddington Bauxite Mine Closure Plan" dated 12 April 2016 signed by Alysia Tringrove and retained on Department of Mines and Petroleum File No. EARS-MPMCP-59140 as Doc ID 4256167
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 09-Jun-2016 | |
12 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 09-Jun-2016 | |
13 | 1 | All topsoil and vegetation being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 09-Jun-2016 | |
14 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 09-Jun-2016 | |
15 | 1 | The lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 09-Jun-2016 | |
16 | 1 | Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles. | 09-Jun-2016 | |
17 | 1 | Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability. | 09-Jun-2016 | |
18 | 1 | On the completion of operations or progressively when possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP. | 09-Jun-2016 | |
19 | 1 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 09-Jun-2016 | |
20 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 09-Jun-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | Survey. | 03-Feb-1989 | |
2 | 1 | Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which is likely to interfere with or damage any Aboriginal site. | 03-Feb-1989 | |
3 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 03-Feb-1989 | |
4 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
4 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 03-Feb-1989 | 11-Aug-2005 |
5 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Feb-1989 | |
6 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface clearing or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
6 | 1 | Unless the written approval of the District Mining Engineer, Department of Mines, is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface clearing or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Feb-1989 | 11-Aug-2005 |
7 | 2 | No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained. | 12-Aug-2005 | |
7 | 1 | No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained. | 03-Feb-1989 | 11-Aug-2005 |
8 | 1 | Pursuant to Section 29 of the Mining Act 1978 and Clause 13A of the Transitional Provisions, Second Schedule of the Act, the grant in respect of all private land other than those the subject of compensation agreements under the transitioned Mineral Claims, being confined to below a depth of thirty metres from the natural surface. | 03-Feb-1989 | |
9 | 1 | No mining on Railway Ballast Pit Reserve 16394, Camping Reserve 23467 and the Murray River without the prior written consent of the Minister for Mines. | 03-Feb-1989 | |
10 | 1 | No mining on any road or road reserve being confined to below a depth of 15 metres from the natural surface. | 03-Feb-1989 | |
11 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 59140) "Worsley Alumina - Boddington Bauxite Mine Mining Proposal (Updated) M70/110, M70/111, M70/112, M70/113 and M70/554" dated 19 May 2016 signed by Alysia Tringrove and retained on Department of Mines and Petroleum File No. EARS-MPMCP-59140 as Doc ID 4256167;
- (MCP Reg ID 59140) "Boddington Bauxite Mine Closure Plan" dated 12 April 2016 signed by Alysia Tringrove and retained on Department of Mines and Petroleum File No. EARS-MPMCP-59140 as Doc ID 4256167
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 09-Jun-2016 | |
12 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 09-Jun-2016 | |
13 | 1 | All topsoil and vegetation being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 09-Jun-2016 | |
14 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 09-Jun-2016 | |
15 | 1 | The lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 09-Jun-2016 | |
16 | 1 | Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles. | 09-Jun-2016 | |
17 | 1 | Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability. | 09-Jun-2016 | |
18 | 1 | On the completion of operations or progressively when possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP. | 09-Jun-2016 | |
19 | 1 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 09-Jun-2016 | |
20 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 09-Jun-2016 | |
Type | Number | Details |
Objection | 58H/84 | Lodged 10:10:00 AM on 10 Feb 1984 by NULLAGA PASTORAL CO. PTY LTDREGISTERED 10:10 AM 10 Feb 1984DISMISSED 16 Sep 1988 |
Objection | 59H/84 | Lodged 10:10:00 AM on 10 Feb 1984 by GLENMORE NOMINEES PTY LTDREGISTERED 10:10 AM 10 Feb 1984DISMISSED 16 Sep 1988 |
Caveat | 877H/890 | Lodged 10:45:00 AM on 23 Nov 1989 by NULLAGA PASTORAL CO. PTY LTDRECORDED 10:45 AM 23 Nov 1989WITHDRAWN 2:25:00 PM 06 Apr 1990 |
Agreement | 175H/890 | Agreement (Compensation) REYNOLDS AUSTRALIA ALUMINA LTD, THE SHELL CO. OF AUSTRALIA LTD, KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, NISSHO IWAI ALUMINA PTY LTD, REYNOLDS AUSTRALIA METALS LTD, BILLITON AUSTRALIA GOLD PTY LTD, BHP GOLD MINES LTD, BHP MINERALS LTD, WORSLEY ALUMINA PTY LTD and NULLAGA PASTORAL CO. PTY LTD Lodged 10:45:00 AM on 23 Nov 1989REGISTERED 10:45 AM 23 Nov 1989 |
Withdrawal of Dealing | 712H/890 | Lodged 2:25:00 PM on 06 Apr 1990 withdrawing Caveat 877H/890REGISTERED 2:25 PM 06 Apr 1990 |
Application to Amend | 166H/912 | Lodged 4:10:00 PM on 15 Oct 1991 amending address to read: "GPO Box 872K, Melbourne, Victoria 3001"REGISTERED 4:10 PM 15 Oct 1991 |
Application to Amend | 168H/912 | Lodged 4:10:00 PM on 15 Oct 1991 amending address to read: "GPO Box J754, Perth, WA 6001"REGISTERED 4:10 PM 15 Oct 1991 |
Application to Amend | 171H/912 | Lodged 4:10:00 PM on 15 Oct 1991 amending address to read: "8th Floor, Griffin Centre, 28 The Esplanade, Perth, WA 6000"REGISTERED 4:10 PM 15 Oct 1991 |
Application to Amend | 174H/912 | Lodged 2:30:00 PM on 18 Oct 1991 amending total number of shares to "200" and the ratio of shares for each holder to: REYNOLDS AUSTRALIA ALUMINA LTD - 80/200ths shares, THE SHELL CO. OF AUSTRALIA LTD - 60/200ths shares, BHP MINERALS LTD - 40/200ths shares, KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD - 20/200ths sharesAmending:Total Shares/Holder Share Ratio ChangeFrom:KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD 10 / 100To:KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD 20 / 200From:BHP MINERALS LTD 20 / 100To:BHP MINERALS LTD 40 / 200From:THE SHELL CO. OF AUSTRALIA LTD 30 / 100To:THE SHELL CO. OF AUSTRALIA LTD 60 / 200From:REYNOLDS AUSTRALIA ALUMINA LTD 40 / 100To:REYNOLDS AUSTRALIA ALUMINA LTD 80 / 200REGISTERED 2:30 PM 18 Oct 1991Lodged:14:30 18 October 1991REGISTERED:14:30 18 October 1991 |
Partial Surrender - Voluntary | 1350H/912 | Lodged 12:10:00 PM on 25 Mar 1992 for that portion coloured "orange" on the plan attached to the partial surrender documentREGISTERED 12:10 PM 25 Mar 1992 |
Surrender - Conditional | 1351H/912 | Lodged:12:10 25 March 1992Partially surrendering : M 70/113
In favour of application for : M 70/731RECORDED:12:10 25 March 1992MADE ABSOLUTE:00:00 26 January 1993 being the commencement of term for M 70/731 |
Agreement | 1H/923SL | Agreement (Sublease) in favour NEWCREST MINING (WA) LTD Lodged 10:30:00 AM on 23 Oct 1992 in respect to 20/100th shares in the name of BHP MINERALS LTDREGISTERED 10:30 AM 23 Oct 1992 |
Agreement | 2H/923SL | Agreement (Sublease) REYNOLDS AUSTRALIA METALS LTD Lodged 10:30:00 AM on 23 Oct 1992 in respect to 40/100 th shares in the name of REYNOLDS AUSTRALIA ALUMINA LTDREGISTERED 10:30 AM 23 Oct 1992 |
Agreement | 3H/923SL | Agreement (Sublease) BILLITON AUSTRALIA GOLD PTY LTD Lodged 10:30:00 AM on 23 Oct 1992 in respect to 30/100th shares in the name of THE SHELL CO. OF AUSTRALIA LTDREGISTERED 10:30 AM 23 Oct 1992 |
Agreement | 98H/923 | Agreement (Deed of Covenant) REYNOLDS AUSTRALIA ALUMINA LTD, BHP MINERALS LTD, NEWCREST MINING (WA) LTD, THE SHELL CO. OF AUSTRALIA LTD and NISSHO IWAI ALUMINA PTY LTD Lodged 3:00:00 PM on 24 Nov 1992REGISTERED 3:00 PM 24 Nov 1992 |
Caveat | 975H/945 | Lodged 4:00:00 PM on 06 Dec 1994 by KUDU AUSTRALIA PTY LTD in respect to 60/200ths shares in the name of THE SHELL CO. OF AUSTRALIA LTDRECORDED 4:00 PM 06 Dec 1994Re Agreement 151H/945 - 14 day notice sent on 04 Jan 1995.
Order under Section 122(3) that Agreement be registered notwithstanding the existence of caveat and under Section 122(1)(c) that such caveat remain in full force and effect upon registration of the agreement and on expiry of the 14 day notice, signed, K.Moore, Warden 11 Jan 1995WITHDRAWN 3:10:00 PM 11 Jun 1996 |
Agreement | 151H/945 | Agreement (Floating Equitable Charge) UNION BANK OF SWITZERLAND and KUDU AUSTRALIA PTY LTD Lodged 3:25:00 PM on 21 Dec 1994REGISTERED 10:00 AM 11 Jan 1995WITHDRAWN 11:00:00 AM 29 Oct 1996 |
Agreement | 202H/956 | Agreement (Deed of Assignment of Sublease 2H/923) in favour of POSGOLD (BODDINGTON) PTY LTD and REYNOLDS AUSTRALIA ALUMINA LTD and being in respect to REYNOLDS AUSTRALIA ALUMINA LTD 40% interest in the lease Lodged 10:20:00 AM on 18 Jan 1996REGISTERED 10:20 AM 18 Jan 1996 |
Withdrawal of Dealing | 433H/956 | Lodged 3:10:00 PM on 11 Jun 1996 withdrawing Caveat 975H/945REGISTERED 3:10 PM 11 Jun 1996 |
Withdrawal of Dealing | 170H/967 | Lodged 11:00:00 AM on 29 Oct 1996 withdrawing Agreement 151H/945REGISTERED 11:00 AM 29 Oct 1996 |
Agreement | 119H/967 | Agreement (Joint Venture) REYNOLDS AUSTRALIA ALUMINA LTD, BHP MINERALS LTD, THE SHELL CO. OF AUSTRALIA LTD and KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 120H/967 | Agreement (Amendment) KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, REYNOLDS BODDINGTON MINES LTD, BHP GOLD MINES LTD, WORSLEY ALUMINA PTY LTD and BILLITON AUSTRALIA GOLD PTY LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 121H/967 | Agreement (Deed of Assignment) BHP GOLD MINES LTD and BHP MINERALS LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 122H/967 | Agreement (Deed of Assignment) REYNOLDS BODDINGTON MINES LTD and REYNOLDS AUSTRALIA ALUMINA LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 123H/967 | Agreement (Deed of Assignment) POSGOLD (BODDINGTON) PTY LTD and POSGOLD (RAM) LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 124H/967 | Agreement (Deed of Assignment) THE SHELL CO. OF AUSTRALIA LTD and BILLITON AUSTRALIA GOLD PTY LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 125H/967 | Agreement (Deed of Assignment) POSGOLD (BODDINGTON) PTY LTD and KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 126H/967 | Agreement (Deed of Assignment) KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD and ACACIA RESOURCES LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 127H/967 | Agreement (Deed of Assignment) NEWCREST MINING (WA) LTD and KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 128H/967 | Agreement (Cross-Operation) KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, NISSHO IWAI ALUMINA PTY LTD, REYNOLDS AUSTRALIA ALUMINA LTD, REYNOLDS BODDINGTON MINES LTD, BHP GOLD MINES LTD, THE SHELL CO. OF AUSTRALIA LTD and BILLITON AUSTRALIA GOLD PTY LTD Lodged 10:30:00 AM on 03 Feb 1997REGISTERED 10:30 AM 03 Feb 1997 |
Agreement | 14H/034 | Agreement (RESTATED BODDINGTON GOLD MINE CROSS OPERATION AGREEMENT) KOBE ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, NISSHO IWAI ALUMINA PTY LTD, NEWMONT BODDINGTON PTY LTD, NEWCREST OPERATIONS LTD, BILLITON ALUMINIUM (WORSLEY) PTY LTD, BILLITON ALUMINIUM (RAA) PTY LTD, WORSLEY ALUMINA PTY LTD, BGM MANAGEMENT COMPANY PTY LTD and ANGLOGOLD AUSTRALIA LTD Lodged 4:15:00 PM on 04 Aug 2003REGISTERED 4:15 PM 04 Aug 2003 |
Licence Instrument | 288481 | Lodged:09:30 14 April 2008ISSUED:00:00 11 July 2018 |
Application to Amend | 291597 | Lodged 2:40 PM on 20 May 2008 amending the address for Billiton Aluminium (RAA) Pty Ltd, Billiton Aluminium (Worsley) Pty Ltd, Japan Alumina Associates (Australia) Pty Ltd & Sojitz Alumina Pty Ltd to read " C/- Land Administration, Level 1: 388 Hay St SUBIACO WA 6008 "RECORDED 2:40 PM 20 May 2008 |
Application to Amend | 292525 | Lodged 9:30 AM on 06 June 2008 amending the address for Billiton Aluminium (RAA) Pty Ltd, Billiton Aluminium (Worsley) Pty Ltd, Japan Alumina Associates (Australia) Pty Ltd & Sojitz Alumina Pty Ltd to read " C/- Land Administration, PO Box 1652 SUBIACO WA 6904"RECORDED 9:30 AM 06 Jun 2008 |
Application to Amend | 313696 | From:BILLITON ALUMINIUM (RAA) PTY LTDAmending:NameTo:BHP BILLITON ALUMINIUM (RAA) PTY LTDRECORDED:11:55 18 February 2009 |
Application to Amend | 314007 | Lodged:11:55 18 February 2009Amending:NameFrom:BILLITON ALUMINIUM (WORSLEY) PTY LTDTo:BHP BILLITON ALUMINIUM (WORSLEY) PTY LTDRECORDED:11:55 18 February 2009 |
Extension / Renewal of Term | 336526 | Lodged:11:35 11 December 2009Applied For Period:21 YearsRECORDED:11:35 11 December 2009Granted Period:21 YearsTerm Renewed To:02/02/2031GRANTED:14 December 2009 |
Application to Amend | 359444 | Lodged:15:35 15 November 2010Amending:AddressFrom:JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, C/- LAND ADMINISTRATION, PO BOX 1652, SUBIACO, WA, 6904To:JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, C/- MANAGER, BODDINTON BAUXITE MINE, PO BOX 50, BODDINGTON, WA, 6390RECORDED:15:35 15 November 2010 |
Application to Amend | 359446 | Lodged:15:35 15 November 2010Amending:AddressFrom:BHP BILLITON ALUMINIUM (WORSLEY) PTY LTD, C/- LAND ADMINISTRATION, PO BOX 1652, SUBIACO, WA, 6094To:BHP BILLITON ALUMINIUM (WORSLEY) PTY LTD, C/- MANAGER, BODDINGTON BAUXITE MINE, PO BOX 50, BODDINGTON, WA, 6390RECORDED:15:35 15 November 2010 |
Application to Amend | 359447 | Lodged:15:35 15 November 2010Amending:AddressFrom:BHP BILLITON ALUMINIUM (RAA) PTY LTD, C/- LAND ADMINISTRATION, PO BOX 1652, SUBIACO, WA, 6904To:BHP BILLITON ALUMINIUM (RAA) PTY LTD, C/- MANAGER, BODDINTON BAUXITE MINE, PO BOX 50, BODDINGTON, WA, 6390RECORDED:15:35 15 November 2010 |
Application to Amend | 359448 | Lodged:15:35 15 November 2010Amending:AddressFrom:SOJITZ ALUMINA PTY LTD, C/- LAND ADMINISTRATION, PO BOX 1652, SUBIACO, WA, 6904To:SOJITZ ALUMINA PTY LTD, C/-MANAGER, BODDINGTON BAUXITE MINE, PO BOX 50, BODDINGTON, WA, 6390RECORDED:15:35 15 November 2010 |
Application to Amend | 477589 | Lodged:10:50 19 November 2015Amending:NameFrom:BHP BILLITON ALUMINIUM (WORSLEY) PTY LTDTo:SOUTH32 ALUMINIUM (WORSLEY) PTY LTDFrom:BHP BILLITON ALUMINIUM (RAA) PTY LTDTo:SOUTH32 ALUMINIUM (RAA) PTY LTDRECORDED:10:50 19 November 2015 |
Application to Amend | 477591 | Lodged:10:50 19 November 2015Amending:Address (Including DTC Details)From:SOUTH32 ALUMINIUM (WORSLEY) PTY LTD, C/- MANAGER, BODDINGTON BAUXITE MINE, PO BOX 50, BODDINGTON, WA, 6390To:SOUTH32 ALUMINIUM (WORSLEY) PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831From:JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, C/- MANAGER - BODDINGTON BAUXITE MINE, PO BOX 50, BODDINGTON, WA, 6390To:JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831From:SOJITZ ALUMINA PTY LTD, C/- MANAGER - BODDINGTON BAUXITE MINE, PO BOX 50, BODDINGTON, WA, 6390To:SOJITZ ALUMINA PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831From:SOUTH32 ALUMINIUM (RAA) PTY LTD, C/- MANAGER, BODDINTON BAUXITE MINE, PO BOX 50, BODDINGTON, WA, 6390To:SOUTH32 ALUMINIUM (RAA) PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831RECORDED:10:50 19 November 2015 |
Application to Amend | 497371 | Lodged:15:36:38 22 November 2016Amending:Address (Including DTC Details)From:SOJITZ ALUMINA PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831To:SOJITZ ALUMINA PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx000RECORDED:15:36:38 22 November 2016 |
Application to Amend | 497608 | Lodged:09:18:42 24 November 2016Amending:Address (Including DTC Details)From:SOUTH32 ALUMINIUM (WORSLEY) PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831To:SOUTH32 ALUMINIUM (WORSLEY) PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx000RECORDED:09:18:42 24 November 2016 |
Application to Amend | 497610 | Lodged:09:37:01 24 November 2016Amending:Address (Including DTC Details)From:JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831To:JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx000RECORDED:09:37:01 24 November 2016 |
Application to Amend | 497612 | Lodged:09:57:48 24 November 2016Amending:Address (Including DTC Details)From:SOUTH32 ALUMINIUM (RAA) PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831To:SOUTH32 ALUMINIUM (RAA) PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx000RECORDED:09:57:48 24 November 2016 |
Extension of Time | 581037 | Lodged:13:24:59 29 June 2020Type:Exemption from ExpenditureRECORDED:13:24:59 29 June 2020APPROVED:15:10 13 May 2021 |
Application to Amend | 628638 | Lodged:09:33:16 22 July 2021Amending:Address (Including DTC Details)From:Principal Place of Business : JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, SAME AS CORRESPONDENCE and DTC :JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx000To:Principal Place of Business : JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831 and DTC :JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxxx999From:Principal Place of Business : SOJITZ ALUMINA PTY LTD, SAME AS CORRESPONDENCE and DTC :SOJITZ ALUMINA PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx000To:Principal Place of Business : SOJITZ ALUMINA PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxx999 and DTC :SOJITZ ALUMINA PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx999From:Principal Place of Business : SOUTH32 ALUMINIUM (WORSLEY) PTY LTD, SAME AS CORRESPONDENCE and DTC :SOUTH32 ALUMINIUM (WORSLEY) PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx000To:Principal Place of Business : SOUTH32 ALUMINIUM (WORSLEY) PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxx999 and DTC :SOUTH32 ALUMINIUM (WORSLEY) PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx999From:Principal Place of Business : SOUTH32 ALUMINIUM (RAA) PTY LTD, SAME AS CORRESPONDENCE and DTC :SOUTH32 ALUMINIUM (RAA) PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx000To:Principal Place of Business : SOUTH32 ALUMINIUM (RAA) PTY LTD, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxx999 and DTC :SOUTH32 ALUMINIUM (RAA) PTY LTD, CELIA SULLIVAN, C/- SOUTH32 LIMITED, LAND & TENURE TEAM, PO BOX Z5184 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxxxxxx@south32.net, xxxxxxxx999RECORDED:09:33:16 22 July 2021 |