Extracted from MTO on 19-Jun-2026 01:09,
last changed 19-Jun-2026.
| # | Ver | Text | Start | End |
| 1 | 1 | Survey. | 22-Feb-2011 | |
| 2 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 22-Feb-2011 | |
| 3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 22-Feb-2011 | |
| 4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Feb-2011 | |
| 5 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Feb-2011 | |
| 6 | 1 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Director, Environment, DMP for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 22-Feb-2011 | |
| 7 | 1 | Mining on any road, road verge or road reserve being confined to below a depth of 15 metres from the natural surface. | 22-Feb-2011 | |
| 8 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- "Programme of Work on M52/1048 for Auvex Managenese Ltd" (Reg ID 36725) dated 23 Augut 2012 signed by Christopher Bryans and retained on Department of Mines and Petroleum File No. EARS-POW-36725
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 26-Apr-2013 | 16-Oct-2013 |
| 9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 26-Apr-2013 | 16-Oct-2013 |
| 10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 26-Apr-2013 | 16-Oct-2013 |
| 11 | 2 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 48337) "Horseshoe Range Manganese Deposits Gascoyne, W.A. Revised Submission May 2014" dated January 2015 signed by Ryan Sander and retained on Department of Mines and Petroleum File No. EARS-MPMCP-48337;
- (MCP Reg ID 48337) "Auvex Horseshoe Pty Ltd, Horseshoe Manganese Project Mining Lease 52/1048 and Miscellaneous Licence 52/128 Mine Closure Plan" dated 17 September 2014 signed by Stephen Woods and retained on Department of Mines and Petroleum File No. EARS-MPMCP-48337;
- (MP Reg ID 64849) "Modified Infrastructure Layout and Pit 1 Location Mining Proposal M52/1048 and L52/128" dated 9 April 2017 signed by Yuzheng Xie and retained on Department of Mines and Petroleum File No. EARS-MP-64849 as Doc ID 4944794
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 27-Apr-2017 | |
| 11 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- (MP Reg ID 48337) "Horseshoe Range Manganese Deposits Gascoyne, W.A. Revised Submission May 2014" dated January 2015 signed by Ryan Sander and retained on Department of Mines and Petroleum File No. EARS-MPMCP-48337;
- (MCP Reg ID 48337) "Auvex Horseshoe Pty Ltd, Horseshoe Manganese Project Mining Lease 52/1048 and Miscellaneous Licence 52/128 Mine Closure Plan" dated 17 September 2014 signed by Stephen Woods and retained on Department of Mines and Petroleum File No. EARS-MPMCP-48337
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 24-Mar-2015 | 26-Apr-2017 |
| 12 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Executive Director, Environment Division, DMP for his assessment and until his written approval to proceed has been obtained. | 24-Mar-2015 | |
| 13 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 24-Mar-2015 | |
| 14 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 24-Mar-2015 | |
| 15 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Executive Director, Environment Division, DMP. | 24-Mar-2015 | |
| 16 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 24-Mar-2015 | |
| 17 | 1 | The lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 24-Mar-2015 | |
| 18 | 1 | Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles. | 24-Mar-2015 | |
| 19 | 1 | Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability. | 24-Mar-2015 | |
| 20 | 1 | On the completion of operations or progressively when possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP. | 24-Mar-2015 | |
| 21 | 1 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report is to be submitted each year in: | 24-Mar-2015 | |
| 22 | 1 | All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, DMP. | 24-Mar-2015 | |
| 23 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans, June 2011" available on DMP's website: | 24-Mar-2015 | |
| Cond # | Ver | Text | Start | End |
| 1 | 1 | Survey. | 22-Feb-2011 | |
| 2 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 22-Feb-2011 | |
| 3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 22-Feb-2011 | |
| 4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Feb-2011 | |
| 5 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Feb-2011 | |
| 6 | 1 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Director, Environment, DMP for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 22-Feb-2011 | |
| 7 | 1 | Mining on any road, road verge or road reserve being confined to below a depth of 15 metres from the natural surface. | 22-Feb-2011 | |
| 8 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- "Programme of Work on M52/1048 for Auvex Managenese Ltd" (Reg ID 36725) dated 23 Augut 2012 signed by Christopher Bryans and retained on Department of Mines and Petroleum File No. EARS-POW-36725
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 26-Apr-2013 | 16-Oct-2013 |
| 9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 26-Apr-2013 | 16-Oct-2013 |
| 10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 26-Apr-2013 | 16-Oct-2013 |
| 11 | 2 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 48337) "Horseshoe Range Manganese Deposits Gascoyne, W.A. Revised Submission May 2014" dated January 2015 signed by Ryan Sander and retained on Department of Mines and Petroleum File No. EARS-MPMCP-48337;
- (MCP Reg ID 48337) "Auvex Horseshoe Pty Ltd, Horseshoe Manganese Project Mining Lease 52/1048 and Miscellaneous Licence 52/128 Mine Closure Plan" dated 17 September 2014 signed by Stephen Woods and retained on Department of Mines and Petroleum File No. EARS-MPMCP-48337;
- (MP Reg ID 64849) "Modified Infrastructure Layout and Pit 1 Location Mining Proposal M52/1048 and L52/128" dated 9 April 2017 signed by Yuzheng Xie and retained on Department of Mines and Petroleum File No. EARS-MP-64849 as Doc ID 4944794
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 27-Apr-2017 | |
| 11 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- (MP Reg ID 48337) "Horseshoe Range Manganese Deposits Gascoyne, W.A. Revised Submission May 2014" dated January 2015 signed by Ryan Sander and retained on Department of Mines and Petroleum File No. EARS-MPMCP-48337;
- (MCP Reg ID 48337) "Auvex Horseshoe Pty Ltd, Horseshoe Manganese Project Mining Lease 52/1048 and Miscellaneous Licence 52/128 Mine Closure Plan" dated 17 September 2014 signed by Stephen Woods and retained on Department of Mines and Petroleum File No. EARS-MPMCP-48337
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 24-Mar-2015 | 26-Apr-2017 |
| 12 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Executive Director, Environment Division, DMP for his assessment and until his written approval to proceed has been obtained. | 24-Mar-2015 | |
| 13 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 24-Mar-2015 | |
| 14 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 24-Mar-2015 | |
| 15 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Executive Director, Environment Division, DMP. | 24-Mar-2015 | |
| 16 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 24-Mar-2015 | |
| 17 | 1 | The lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 24-Mar-2015 | |
| 18 | 1 | Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles. | 24-Mar-2015 | |
| 19 | 1 | Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability. | 24-Mar-2015 | |
| 20 | 1 | On the completion of operations or progressively when possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP. | 24-Mar-2015 | |
| 21 | 1 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report is to be submitted each year in: | 24-Mar-2015 | |
| 22 | 1 | All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, DMP. | 24-Mar-2015 | |
| 23 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans, June 2011" available on DMP's website: | 24-Mar-2015 | |
| Type | Number | Details |
| Application to Amend | 375495 | Lodged:15:50 29 June 2011Amending:AddressFrom:Residential : AUVEX HORSESHOE PTY LTD, SAME AS CORRESPONDENCE and Correspondance :AUVEX HORSESHOE PTY LTDLEVEL 4, THE KIRIN CENTRE, 15 OGILVIE ROAD, MT PLEASANT, WA, 6153To:Residential : AUVEX HORSESHOE PTY LTD, ADDRESS NOT PROVIDED and Correspondance :AUVEX HORSESHOE PTY LTDC/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849RECORDED:15:50 29 June 2011 |
| Caveat | 387269 | Lodged:15:10 13 December 2011Caveat Type:Absolute CaveatCaveator:NARACOOTA RESOURCES LIMITEDShares Caveated:100/100 shares AUVEX HORSESHOE PTY LTDRECORDED:15:10 13 December 2011WITHDRAWN:16:06 21 January 2014 |
| Application to Amend | 421909 | Lodged:10:55 29 April 2013Amending:AddressFrom:AUVEX HORSESHOE PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:AUVEX HORSESHOE PTY LTD, LEVEL 4 KIRIN CENTRE, 15 OGILVIE ROAD, MOUNT PLEASANT, WA, 6153RECORDED:10:55 29 April 2013 |
| Withdrawal of Dealing | 439075 | Lodged:16:06 21 January 2014In respect to:Caveat 387269RECORDED:16:06 21 January 2014 |
| Application to Amend | 446355 | Lodged:10:55 14 May 2014Amending:AddressFrom:Residential : AUVEX HORSESHOE PTY LTD, ADDRESS NOT PROVIDED and Correspondence :AUVEX HORSESHOE PTY LTD, LEVEL 4, THE KIRIN CENTRE, 15 OGILVIE ROAD, MT PLEASANT, WA, 6153To:Residential : AUVEX HORSESHOE PTY LTD, GROUND FLOOR, 10 ORD ST, WEST PERTH, WA, 6005 and Correspondence :AUVEX HORSESHOE PTY LTD, PO BOX 268, WEST PERTH, WA, 6872RECORDED:10:55 14 May 2014 |
| Forfeiture | 448569 | Initiated:10/06/2014 for non-compliance with reporting requirementsRECORDED:13:00:15 11 June 2014Notice Issued:Regulation 50 Notice sent 10/06/2014 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:11/07/2014FINALISED:Order by Minister on 02 December 2014 that M 52/1048 be Penalty Imposed |
| Fine | 458541 | Fine in respect to:Forfeiture Process 448569Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$90.00Notification date:03/12/2014Due date:06/01/2015Pursuant to:Section 97(5)RECORDED:02 December 2014PAYMENT RECEIVED:08 December 2014FINALISED:08 December 2014Receipt Number:06-141223Amount:$90.00Remaining balance:$0.00 |
| Application to Amend | 468889 | Lodged:15:55 09 June 2015Amending:NameFrom:AUVEX HORSESHOE PTY LTDTo:HORSESHOE MANGANESE PTY LTDRECORDED:15:55 09 June 2015 |
| Application to Amend | 527249 | Lodged:10:38:42 06 April 2018Amending:Address (Including DTC Details)From:HORSESHOE MANGANESE PTY LTD, PO BOX 268, WEST PERTH, WA, 6872To:HORSESHOE MANGANESE PTY LTD, MANAGER, PO BOX 268, WEST PERTH, WA, 6872, xxxxxx@goldvalley.com.au, xxxxxxx267RECORDED:10:38:42 06 April 2018 |
| Extension of Time | 528539 | Lodged:15:40:35 20 April 2018Type:Form 5RECORDED:15:40:35 20 April 2018REFUSED:14:23:54 24 April 2018 |
| Forfeiture | 536709 | Initiated:24/08/2018 for non-compliance with royalty provisionsRECORDED:07:21:59 24 August 2018Notice Issued:Regulation 50 Notice sent 24/08/2018 for non-compliance with royalty provisions pursuant to Sec 82(1)(a).Compliance Date:28/09/2018FINALISED:Order by Minister on 15 October 2018 that M 52/1048 be Penalty Imposed |
| Fine | 540557 | Fine in respect to:Forfeiture Process 536709Fine reason:Non-compliance with Royalties obligationsPenalty amount:$3,432.33Notification date:15/10/2018Due date:19/11/2018Pursuant to:Section 97(5)RECORDED:15 October 2018PAYMENT RECEIVED:22 October 2018FINALISED:22 October 2018Receipt Number:EFTAmount:$3,432.33Remaining balance:$0.00 |
| Forfeiture | 542531 | Initiated:13/11/2018 for non-compliance with royalty provisionsRECORDED:10:47:48 12 November 2018Notice Issued:Regulation 50 Notice sent 13/11/2018 for non-compliance with royalty provisions pursuant to Sec 82(1)(a).Compliance Date:18/12/2018FINALISED:Order by Minister on 04 December 2018 that M 52/1048 be Penalty Imposed |
| Fine | 543810 | Fine in respect to:Forfeiture Process 542531Fine reason:Non-compliance with Royalties obligationsPenalty amount:$433.09Notification date:04/12/2018Due date:08/01/2019Pursuant to:Section 97(5)RECORDED:04 December 2018PAYMENT RECEIVED:17 December 2018FINALISED:18 December 2018Receipt Number:10080160Amount:$433.09Remaining balance:$0.00 |
| Extension of Time | 574771 | Lodged:15:17:22 24 March 2020Type:RentRECORDED:15:17:22 24 March 2020Time extended to pay annual rent until 29 May 2020APPROVED:13:37:30 03 April 2020 |
| Caveat | 577511 | Lodged:12:24:47 08 May 2020Caveat Type:Absolute CaveatCaveator:ESPLORATORE PTY LTDShares Caveated:100/100 shares HORSESHOE MANGANESE PTY LTDRECORDED:12:24:47 08 May 2020WITHDRAWN:16:17:51 17 March 2025 |
| Application to Amend | 580099 | Lodged:15:38:33 16 June 2020Amending:Address (Including DTC Details)From:Principal Place of Business : HORSESHOE MANGANESE PTY LTD, GROUND FLOOR, 10 ORD ST, WEST PERTH, WA, 6005 and DTC :HORSESHOE MANGANESE PTY LTD, MANAGER, PO BOX 268, WEST PERTH, WA, 6872, xxxxxx@goldvalley.com.au, xxxxxxx267To:Principal Place of Business : HORSESHOE MANGANESE PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :HORSESHOE MANGANESE PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:15:38:33 16 June 2020 |
| Forfeiture | 588589 | Initiated:21/10/2020 for non-compliance with royalty provisionsRECORDED:09:01:27 21 October 2020Notice Issued:Regulation 50 Notice sent 21/10/2020 for non-compliance with royalty provisions pursuant to Sec 82(1)(a).1 April 2018 to 30 June 2019Compliance Date:30/10/2020FINALISED:Order by Minister on 11 March 2021 that M 52/1048 be Penalty Imposed |
| Fine | 617503 | Fine in respect to:Forfeiture Process 588589Fine reason:Non-compliance with Royalties obligationsPenalty amount:$2,359.89Notification date:11/03/2021Due date:14/04/2021Pursuant to:Section 97(5)RECORDED:11 March 2021PAYMENT RECEIVED:18 March 2021FINALISED:19 March 2021Receipt Number:10188875Amount:$2,359.89Remaining balance:$0.00 |
| Withdrawal of Dealing | 728588 | Lodged:16:17:51 17 March 2025In respect to:Caveat 577511RECORDED:16:17:51 17 March 2025 |