Extracted from MTO on 02-Aug-2025 00:26,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 11-Mar-2015 | |
2 | 2 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 18-Oct-2019 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 11-Mar-2015 | 17-Oct-2019 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Mar-2015 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Oct-2019 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Mar-2015 | 17-Oct-2019 |
5 | 1 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Executive Director, Environment Division, DMP for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 11-Mar-2015 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licence 38/150, 39/172 and 39/226 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 11-Mar-2015 | |
7 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No PL108 as shown in TENGRAPH. | 11-Mar-2015 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 11-Mar-2015 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 11-Mar-2015 | |
10 | 1 | The Lessee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 11-Mar-2015 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 11-Mar-2015 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 11-Mar-2015 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 11-Mar-2015 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 11-Mar-2015 | |
15 | 11 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009;
- (MP Reg ID 77242) "Tropicana Gold Mine - Operational Area Boston Shaker Underground" dated 27 November 2018 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-77242 as Doc ID 6182958;
- (MP Reg ID 79131) “Kamikaze Borefield Expansion” dated 7 March 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-79131 as Doc ID 6405300;
- (MP Reg ID 80085) "Tropicana Gold Mine Operational Area Village and Power Station Expansion Mining Proposal" dated 14 May 2019 signed by Mr Norman Galli, Manager Environment, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-80085 as Doc ID 6527099;
- (MP Reg ID 82252) "Havana Open Pit Cutback Mining Proposal" dated 02 September 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-82252 as Doc ID 6813929
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 18-Oct-2019 | |
15 | 10 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009;
- (MP Reg ID 77242) "Tropicana Gold Mine - Operational Area Boston Shaker Underground" dated 27 November 2018 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-77242 as Doc ID 6182958;
- (MP Reg ID 79131) “Kamikaze Borefield Expansion” dated 7 March 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-79131 as Doc ID 6405300;
- (MP Reg ID 80085) "Tropicana Gold Mine Operational Area Village and Power Station Expansion Mining Proposal" dated 14 May 2019 signed by Mr Norman Galli, Manager Environment, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-80085 as Doc ID 6527099
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 11-Jun-2019 | 17-Oct-2019 |
15 | 9 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009;
- (MP Reg ID 77242) "Tropicana Gold Mine - Operational Area Boston Shaker Underground" dated 27 November 2018 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-77242 as Doc ID 6182958;
- (MP Reg ID 79131) “Kamikaze Borefield Expansion” dated 7 March 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-79131 as Doc ID 6405300
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 23-May-2019 | 10-Jun-2019 |
15 | 8 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009;
- (MP Reg ID 79131) "Kamikaze Borefield Expansion" dated 7 March 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-79131 as Doc ID 6405301;
- (MP Reg ID 77242) "Tropicana Gold Mine - Operational Area Boston Shaker Underground" dated 27 November 2018 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-77242 as Doc ID 6182958
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 14-May-2019 | 22-May-2019 |
15 | 7 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 17-Oct-2018 | 13-May-2019 |
15 | 6 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 18-Dec-2017 | 16-Oct-2018 |
15 | 5 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 16-Aug-2017 | 17-Dec-2017 |
15 | 4 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 27-Oct-2016 | 15-Aug-2017 |
15 | 3 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 12-Jan-2016 | 26-Oct-2016 |
15 | 2 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 05-Jan-2016 | 11-Jan-2016 |
15 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 07-Apr-2015 | 04-Jan-2016 |
16 | 2 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Executive Director, Resource and Environmental Compliance, DMIRS for assessment and until the Executive Director's written approval to proceed has been obtained. | 18-Oct-2019 | |
16 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Executive Director, Environment Division, DMP for his assessment and until his written approval to proceed has been obtained. | 07-Apr-2015 | 17-Oct-2019 |
17 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 07-Apr-2015 | |
18 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 07-Apr-2015 | |
19 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Executive Director, Environment Division, DMP. | 07-Apr-2015 | |
20 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 07-Apr-2015 | |
21 | 1 | The lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 07-Apr-2015 | |
22 | 1 | Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles. | 07-Apr-2015 | |
23 | 1 | Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability. | 07-Apr-2015 | |
24 | 2 | On the completion of operations or progressively where possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety. | 18-Oct-2019 | |
24 | 1 | On the completion of operations or progressively when possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP. | 07-Apr-2015 | 17-Oct-2019 |
25 | 1 | An Engineering or Geotechnical specialist shall supervise the construction of the those components which, in the design, are there to ensure embankment stability, of the TSF embankment walls and provide the Department of Mines and Petroleum (DMP) with a copy of the construction document, upon completion of each lift. | 07-Apr-2015 | |
26 | 1 | The construction details of any tailings storage embankment shall be documented by an engineering or geotechnical specialist and confirm that the construction satisfies the design intent. The construction document shall include the records of all construction quality control testing, the basis of any method specification adopted, and any significant modifications to the original design together with the reasons why the modifications were necessary. The construction document shall also present as-built drawings for the embankment earthworks and pipework. A copy of the construction document shall be submitted to DMP for its records. | 07-Apr-2015 | |
27 | 1 | The tailings storage facility shall be checked on a routine daily basis by site personnel during periods of deposition to ensure that the facility is functioning as per the design intent. | 07-Apr-2015 | |
28 | 1 | An Engineering or Geotechnical specialist shall audit and review of the active tailing storage facility on an annual basis . The specilist shall review past performance, validate the design, examine tailings management and review the results of monitoring. Any deficiences noted in the audit and review shall be suitably addressed and improved. The audit and review report shall be submitted to the DMP and should be accompanied by a recent survey pick-up of the facility and updated tailings storage data sheet. | 07-Apr-2015 | |
29 | 1 | At the time of decommissioning of the tailings storage facility and prior to rehabilitation, a further review report by a geotechnical or engineering specialist will be required by the Executive Director, Environment Division, DMP. This report should review the status of the structure and its contained tailings, examine and address the implications of the physical and chemical characteristics of the materials, and present and review the results of all environmental monitoring. The rehabilitation stabilisation works proposed and any on-going remedial requirements should also be addressed. | 07-Apr-2015 | |
30 | 1 | Monitoring within the tailings pond, beach, embankment, underlying and surrounding aquifers shall be undertaken to enable performance to be compared with design assumptions. Monitoring shall be of sufficient density and frequency to ensure that responses to daily climatic and geologic events, daily operational changes or outside influences can be readily identified. | 07-Apr-2015 | |
31 | 2 | An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 18-Oct-2019 | |
31 | 1 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report is to be submitted each year in: | 07-Apr-2015 | 17-Oct-2019 |
32 | 3 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department’s "Guidelines for Preparing Mine Closure Plans":
| 22-Jan-2024 | |
32 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department’s "Guidelines for Preparing Mine Closure Plans":
| 17-Oct-2018 | 21-Jan-2024 |
32 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans, June 2011" available on DMP's website: | 07-Apr-2015 | 16-Oct-2018 |
33 | 2 | All mining operations approved by a Mining Proposal submitted after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s. | 10-Jun-2021 | |
33 | 1 | All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 10.2 of the Mining Proposal (Reg ID 88552) "LEA Waste Landform Extension and Havana South Backfill Mining Proposal" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7723834. | 13-Oct-2020 | 09-Jun-2021 |
34 | 1 | All ground disturbance activities associated with Mining Proposal Reg ID 88552 to be undertaken within the disturbance envelope as represented by the spatial data provided on 22 July 2020 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7564107. | 13-Oct-2020 | 10-Jun-2021 |
35 | 2 | No alteration or expansion of mining operations beyond the activities described within the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. | 10-Jun-2021 | |
35 | 1 | No alteration or expansion of mining operations beyond the activities detailed in Table 5.1 and Tables 5.2 – 5.3 of the Mining Proposal (Reg ID 88552) "LEA Waste Landform Extension and Havana South Backfill Mining Proposal" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7723834. | 13-Oct-2020 | 09-Jun-2021 |
36 | 2 | The Lessee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s. | 10-Jun-2021 | |
36 | 1 | The Lessee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 10.2 of the Mining Proposal (Reg ID 88552) "LEA Waste Landform Extension and Havana South Backfill Mining Proposal" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7723834. | 13-Oct-2020 | 09-Jun-2021 |
37 | 1 | Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident. | 13-Oct-2020 | |
38 | 2 | Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach. | 10-Jun-2021 | |
38 | 1 | Report any breach of environmental outcome or performance criteria stated in Table 10.2 of the Mining Proposal (Reg ID 88552) "LEA Waste Landform Extension and Havana South Backfill Mining Proposal" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7723834, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach. | 13-Oct-2020 | 09-Jun-2021 |
39 | 1 | All ground disturbance approved by a Mining Proposal submitted after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s. | 10-Jun-2021 | |
40 | 1 | Management of mine closure to be undertaken in accordance with the latest, relevant, approved Mine Closure Plan. | 10-Jun-2021 | |
41 | 1 | All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety. | 22-Jan-2024 | |
42 | 1 | All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 22-Jan-2024 | |
43 | 1 | The in-pit tailings facility shall be checked on a regular basis by site personnel during periods of deposition to ensure that appropriate levels of dewatering are occurring concurrently with tailings deposition. | 20-Jan-2025 | |
44 | 1 | Pit wall stability monitoring is to be undertaken on a regular basis and managed in accordance with trigger-action response plans (TARPS). TARPS are to be developed prior to commencing in-pit tailings deposition. | 20-Jan-2025 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 11-Mar-2015 | |
2 | 2 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 18-Oct-2019 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 11-Mar-2015 | 17-Oct-2019 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Mar-2015 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Oct-2019 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Mar-2015 | 17-Oct-2019 |
5 | 1 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Executive Director, Environment Division, DMP for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 11-Mar-2015 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licence 38/150, 39/172 and 39/226 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 11-Mar-2015 | |
7 | 1 | No mining within 25 metres of either side of the Gas/Petroleum pipeline contained within Petroleum Pipeline Licence No PL108 as shown in TENGRAPH. | 11-Mar-2015 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 11-Mar-2015 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Gas/Petroleum pipeline. | 11-Mar-2015 | |
10 | 1 | The Lessee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 11-Mar-2015 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas/Petroleum pipeline without the prior written consent of the Director Petroleum DMP. | 11-Mar-2015 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 11-Mar-2015 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas/Petroleum pipeline. | 11-Mar-2015 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas/Petroleum pipeline. | 11-Mar-2015 | |
15 | 11 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009;
- (MP Reg ID 77242) "Tropicana Gold Mine - Operational Area Boston Shaker Underground" dated 27 November 2018 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-77242 as Doc ID 6182958;
- (MP Reg ID 79131) “Kamikaze Borefield Expansion” dated 7 March 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-79131 as Doc ID 6405300;
- (MP Reg ID 80085) "Tropicana Gold Mine Operational Area Village and Power Station Expansion Mining Proposal" dated 14 May 2019 signed by Mr Norman Galli, Manager Environment, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-80085 as Doc ID 6527099;
- (MP Reg ID 82252) "Havana Open Pit Cutback Mining Proposal" dated 02 September 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-82252 as Doc ID 6813929
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 18-Oct-2019 | |
15 | 10 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009;
- (MP Reg ID 77242) "Tropicana Gold Mine - Operational Area Boston Shaker Underground" dated 27 November 2018 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-77242 as Doc ID 6182958;
- (MP Reg ID 79131) “Kamikaze Borefield Expansion” dated 7 March 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-79131 as Doc ID 6405300;
- (MP Reg ID 80085) "Tropicana Gold Mine Operational Area Village and Power Station Expansion Mining Proposal" dated 14 May 2019 signed by Mr Norman Galli, Manager Environment, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-80085 as Doc ID 6527099
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 11-Jun-2019 | 17-Oct-2019 |
15 | 9 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009;
- (MP Reg ID 77242) "Tropicana Gold Mine - Operational Area Boston Shaker Underground" dated 27 November 2018 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-77242 as Doc ID 6182958;
- (MP Reg ID 79131) “Kamikaze Borefield Expansion” dated 7 March 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-79131 as Doc ID 6405300
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 23-May-2019 | 10-Jun-2019 |
15 | 8 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009;
- (MP Reg ID 79131) "Kamikaze Borefield Expansion" dated 7 March 2019 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-79131 as Doc ID 6405301;
- (MP Reg ID 77242) "Tropicana Gold Mine - Operational Area Boston Shaker Underground" dated 27 November 2018 signed by Richard McLeod, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-77242 as Doc ID 6182958
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 14-May-2019 | 22-May-2019 |
15 | 7 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642;
- (MCP Reg ID 64407) "Mine Closure Plan – Tropicana Gold Mine" dated 28 February 2017 signed by Rosemarie Lane, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MCP-64407 as Doc ID 4843009
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 17-Oct-2018 | 13-May-2019 |
15 | 6 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218;
- (MP Reg ID 70930) "Tropicana Gold Mine Operational Area New 6 MW Ball Mill" dated 30 November 2017 signed by Richard McLeoad and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-70930 as Doc ID 5424642
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 18-Dec-2017 | 16-Oct-2018 |
15 | 5 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832;
- (MP Reg ID 68698) "Tropicana Gold Mine Operational Area Infrastructure Upgrades Mining Proposal" dated 17 July 2017 signed by Mr Richard McLeod - General Manager Tropicana Gold Mine and retained on Department of Mines, Industry Regulations and Safety File No. EARS-MP-68698 as Doc ID 5147218
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 16-Aug-2017 | 17-Dec-2017 |
15 | 4 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995
- MP Reg ID: 60914) "Tropicana Gold Mine: Operational Area Waste Landform Optimisation Mining Proposal" dated 5 October 2016 signed by Duncan Gibbs, and retained on Department of Mines and Petroleum file no. EARS-MP-60914, as Doc ID 4546832.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 27-Oct-2016 | 15-Aug-2017 |
15 | 3 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 12-Jan-2016 | 26-Oct-2016 |
15 | 2 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603;
- (Reg ID 58034) "Tropicana Gold Mine - Operational Area Process Plant Optimisation and Additional Infrastructure" dated 1 December 2015 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MP-58034 as Doc ID 3958995
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 05-Jan-2016 | 11-Jan-2016 |
15 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:- (MP Reg ID 53515) "Tropicana Gold Mine - Consolidated Mining Lease" dated 30 December 2014 signed by Duncan Gibbs - General Manager Tropicana and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351744;
- (MCP Reg ID 53515) "Tropicana Gold Mine - Mine Closure Plan" dated 31 January 2014 signed by Belinda Bastow - Manager Sustainability/Approvals/Compliance and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3351761;
- Re: Tropicana Gold Mine - Consolidated Mining Lease Mining Proposal - Response to additional information request dated 25 February 2015 and retained on Department of Mines and Petroleum File No. EARS-MPMCP-53515 as Doc ID 3438603.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 07-Apr-2015 | 04-Jan-2016 |
16 | 2 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Executive Director, Resource and Environmental Compliance, DMIRS for assessment and until the Executive Director's written approval to proceed has been obtained. | 18-Oct-2019 | |
16 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Executive Director, Environment Division, DMP for his assessment and until his written approval to proceed has been obtained. | 07-Apr-2015 | 17-Oct-2019 |
17 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 07-Apr-2015 | |
18 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 07-Apr-2015 | |
19 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Executive Director, Environment Division, DMP. | 07-Apr-2015 | |
20 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 07-Apr-2015 | |
21 | 1 | The lessee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 07-Apr-2015 | |
22 | 1 | Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles. | 07-Apr-2015 | |
23 | 1 | Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability. | 07-Apr-2015 | |
24 | 2 | On the completion of operations or progressively where possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety. | 18-Oct-2019 | |
24 | 1 | On the completion of operations or progressively when possible, all waste dumps, tailings storage facilities, stockpiles or other mining related landforms must be rehabilitated to form safe, stable, non-polluting structures which are integrated with the surrounding landscape and support self sustaining, functional ecosystems comprising suitable, local provenance species or alternative agreed outcome to the satisfaction of the Executive Director, Environment Division, DMP. | 07-Apr-2015 | 17-Oct-2019 |
25 | 1 | An Engineering or Geotechnical specialist shall supervise the construction of the those components which, in the design, are there to ensure embankment stability, of the TSF embankment walls and provide the Department of Mines and Petroleum (DMP) with a copy of the construction document, upon completion of each lift. | 07-Apr-2015 | |
26 | 1 | The construction details of any tailings storage embankment shall be documented by an engineering or geotechnical specialist and confirm that the construction satisfies the design intent. The construction document shall include the records of all construction quality control testing, the basis of any method specification adopted, and any significant modifications to the original design together with the reasons why the modifications were necessary. The construction document shall also present as-built drawings for the embankment earthworks and pipework. A copy of the construction document shall be submitted to DMP for its records. | 07-Apr-2015 | |
27 | 1 | The tailings storage facility shall be checked on a routine daily basis by site personnel during periods of deposition to ensure that the facility is functioning as per the design intent. | 07-Apr-2015 | |
28 | 1 | An Engineering or Geotechnical specialist shall audit and review of the active tailing storage facility on an annual basis . The specilist shall review past performance, validate the design, examine tailings management and review the results of monitoring. Any deficiences noted in the audit and review shall be suitably addressed and improved. The audit and review report shall be submitted to the DMP and should be accompanied by a recent survey pick-up of the facility and updated tailings storage data sheet. | 07-Apr-2015 | |
29 | 1 | At the time of decommissioning of the tailings storage facility and prior to rehabilitation, a further review report by a geotechnical or engineering specialist will be required by the Executive Director, Environment Division, DMP. This report should review the status of the structure and its contained tailings, examine and address the implications of the physical and chemical characteristics of the materials, and present and review the results of all environmental monitoring. The rehabilitation stabilisation works proposed and any on-going remedial requirements should also be addressed. | 07-Apr-2015 | |
30 | 1 | Monitoring within the tailings pond, beach, embankment, underlying and surrounding aquifers shall be undertaken to enable performance to be compared with design assumptions. Monitoring shall be of sufficient density and frequency to ensure that responses to daily climatic and geologic events, daily operational changes or outside influences can be readily identified. | 07-Apr-2015 | |
31 | 2 | An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 18-Oct-2019 | |
31 | 1 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report is to be submitted each year in: | 07-Apr-2015 | 17-Oct-2019 |
32 | 3 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department’s "Guidelines for Preparing Mine Closure Plans":
| 22-Jan-2024 | |
32 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department’s "Guidelines for Preparing Mine Closure Plans":
| 17-Oct-2018 | 21-Jan-2024 |
32 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans, June 2011" available on DMP's website: | 07-Apr-2015 | 16-Oct-2018 |
33 | 2 | All mining operations approved by a Mining Proposal submitted after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s. | 10-Jun-2021 | |
33 | 1 | All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 10.2 of the Mining Proposal (Reg ID 88552) "LEA Waste Landform Extension and Havana South Backfill Mining Proposal" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7723834. | 13-Oct-2020 | 09-Jun-2021 |
34 | 1 | All ground disturbance activities associated with Mining Proposal Reg ID 88552 to be undertaken within the disturbance envelope as represented by the spatial data provided on 22 July 2020 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7564107. | 13-Oct-2020 | 10-Jun-2021 |
35 | 2 | No alteration or expansion of mining operations beyond the activities described within the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. | 10-Jun-2021 | |
35 | 1 | No alteration or expansion of mining operations beyond the activities detailed in Table 5.1 and Tables 5.2 – 5.3 of the Mining Proposal (Reg ID 88552) "LEA Waste Landform Extension and Havana South Backfill Mining Proposal" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7723834. | 13-Oct-2020 | 09-Jun-2021 |
36 | 2 | The Lessee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s. | 10-Jun-2021 | |
36 | 1 | The Lessee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 10.2 of the Mining Proposal (Reg ID 88552) "LEA Waste Landform Extension and Havana South Backfill Mining Proposal" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7723834. | 13-Oct-2020 | 09-Jun-2021 |
37 | 1 | Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident. | 13-Oct-2020 | |
38 | 2 | Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach. | 10-Jun-2021 | |
38 | 1 | Report any breach of environmental outcome or performance criteria stated in Table 10.2 of the Mining Proposal (Reg ID 88552) "LEA Waste Landform Extension and Havana South Backfill Mining Proposal" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MP-88552 as Doc ID 7723834, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach. | 13-Oct-2020 | 09-Jun-2021 |
39 | 1 | All ground disturbance approved by a Mining Proposal submitted after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s. | 10-Jun-2021 | |
40 | 1 | Management of mine closure to be undertaken in accordance with the latest, relevant, approved Mine Closure Plan. | 10-Jun-2021 | |
41 | 1 | All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety. | 22-Jan-2024 | |
42 | 1 | All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 22-Jan-2024 | |
43 | 1 | The in-pit tailings facility shall be checked on a regular basis by site personnel during periods of deposition to ensure that appropriate levels of dewatering are occurring concurrently with tailings deposition. | 20-Jan-2025 | |
44 | 1 | Pit wall stability monitoring is to be undertaken on a regular basis and managed in accordance with trigger-action response plans (TARPS). TARPS are to be developed prior to commencing in-pit tailings deposition. | 20-Jan-2025 | |
Type | Number | Details |
Application to Amend | 487945 | Lodged:09:31:07 07 June 2016Amending:Address (Including DTC Details)From:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831To:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, WARREN STEWARD, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxxx660RECORDED:09:31:07 07 June 2016 |
Application to Amend | 513171 | Lodged:15:00 24 August 2017Amending:Address (Including DTC Details)From:Principal Place of Business : ANGLOGOLD ASHANTI AUSTRALIA LIMITED, SAME AS CORRESPONDENCE and DTC :ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831To:Principal Place of Business : ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxxxx660 and DTC :ANGLOGOLD ASHANTI AUSTRALIA LIMITED, WARREN STEWARD, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxxxx660RECORDED:15:00 24 August 2017 |
Application to Amend | 571290 | Lodged:14:44:28 31 January 2020Amending:NameFrom:INDEPENDENCE GROUP NLTo:IGO LIMITEDRECORDED:14:44:28 31 January 2020 |
Caveat | 658952 | Lodged:08:40:09 19 September 2022Caveat Type:Consent CaveatCaveator:NATIONAL AUSTRALIA BANK LIMITEDShares Caveated:30/100 shares AFB RESOURCES PTY LTDRECORDED:08:40:09 19 September 2022WITHDRAWN:14:17:56 22 January 2025 |
Application to Amend | 663232 | Lodged:14:04:28 14 November 2022Amending:Address (Including DTC Details)From:Principal Place of Business : AFB RESOURCES PTY LTD, LEVEL 2, 516 HAY STREET, SUBIACO, WA, 6008 and DTC :AFB RESOURCES PTY LTD, LEVEL 2, 516 HAY STREET, SUBIACO, WA, 6008To:Principal Place of Business : AFB RESOURCES PTY LTD, C/- ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@AngloGoldAshanti.com, xxxxxxxxxxx638 and DTC :AFB RESOURCES PTY LTD, C/- ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@AngloGoldAshanti.com, xxxxxxxxxxx638RECORDED:14:04:28 14 November 2022 |
Application to Amend | 699408 | Lodged:11:58:08 21 March 2024Amending:Address (Including DTC Details)From:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831To:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, AGAA, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxxxx660REJECTED:11:58:08 21 March 2024 |
Application to Amend | 699410 | Lodged:12:05:54 21 March 2024Amending:Address (Including DTC Details)From:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831To:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxxxx660REJECTED:12:05:54 21 March 2024 |
Application to Amend | 700019 | Lodged:13:11:08 28 March 2024Amending:Address (Including DTC Details)From:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831To:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, AGAA, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxx660RECORDED:13:11:08 28 March 2024 |
Application to Amend | 700020 | Lodged:13:11:08 28 March 2024Amending:Address (Including DTC Details)From:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831To:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxx660RECORDED:13:11:08 28 March 2024 |
Application to Amend | 700392 | Lodged:12:14:56 04 April 2024Amending:Address (Including DTC Details)From:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, AGAA, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxx660To:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, AGAA_TJV, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxx660RECORDED:12:14:56 04 April 2024 |
Withdrawal of Dealing | 724115 | Lodged:14:17:56 22 January 2025In respect to:Caveat 658952RECORDED:14:17:56 22 January 2025 |
Caveat | 727706 | Lodged:12:40:25 07 March 2025Caveat Type:Consent CaveatCaveator:WESTPAC ADMINISTRATION PTY LIMITEDShares Caveated:30/100 shares AFB RESOURCES PTY LTDRECORDED:12:40:25 07 March 2025 |