Produced by LandTrack Systems
Disclaimer: While all due care is taken with the accuracy of this data, LandTrack Systems accepts no liability for any loss or damages incurred by incorrect or missing information on this site. Data is sourced from state mines department website, and remains subject to their respective disclaimers and copyright notices as well. The data is provided subject to the correct function of the department websites and the availability of up-to-date data at the time of preparing the report.
Extracted from MTO on 09-May-2025 01:19, last changed 06-May-2025.
Identifier: | M 36/300 | Type: | Mining Lease |
---|---|---|---|
Status: | Live | District: | LAWLERS |
Lodged: | LEONORA | Area: | 238.00000 HA |
Purposes: | Term: | 21 Years (Renewed) | |
Markout: | 01-Feb-1994 17:20 | Received: | 02-Feb-1994 08:34 |
Commence: | 19-Sep-1994 | Expiry: | 18-Sep-2036 |
Company Name | Shares | Total Shares |
---|---|---|
HARRIS, Gay | 50 | 100 |
HARRIS, Nicholas Paul | 50 | 100 |
Company Name | Shares | Total Shares |
---|---|---|
JOHN, David Gough | 100 | 100 |
Relationship Type | Dealing | Dealing Status | Tenement | Tenement Status |
---|---|---|---|---|
Section 49 | P 36/1254 | Dead | ||
Section 49 | P 36/1261 | Dead | ||
Section 49 | P 36/1258 | Dead | ||
Section 49 | P 36/1257 | Dead | ||
Section 49 | P 36/1255 | Dead |
Shire Name | Shire Number | Start | Area |
---|---|---|---|
LEONORA SHIRE | 5040 | 01-Feb-1994 | 238.00000 HA |
# | Ver | Text | Start | End |
---|---|---|---|---|
1 | 1 | Survey. | 19-Sep-1994 | |
2 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 19-Sep-1994 | |
3 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
3 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 19-Sep-1994 | 11-Aug-2005 |
4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Sep-1994 | |
5 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
5 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Sep-1994 | 11-Aug-2005 |
6 | 1 | The lessee within three months of grant submitting a plan of the ongoing mining operations and measures to safeguard the environment to the State Mining Engineer for his assessment and written approval. | 19-Sep-1994 | 21-Mar-1995 |
7 | 1 | The lessee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:
| 19-Sep-1994 | |
8 | 1 | The rights of ingress to and egress from Miscellaneous Licence 36/59 at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 19-Sep-1994 | |
9 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92, 8323/92 and 2004/95;
Where a difference exists between the above documents and the following conditions, then the following conditions shall prevail. | 13-Jul-2021 | |
9 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92, 8323/92 and 2004/95;
Where a difference exists between the above documents and the following conditions, then the following conditions shall prevail. | 07-Sep-2016 | 12-Jul-2021 |
9 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92, 8323/92 and 2004/95;
| 28-Apr-2016 | 06-Sep-2016 |
9 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92, 8323/92 and 2004/95. Where a difference exists between the above documents and the following conditions, then the following conditions shall prevail. | 22-Mar-1995 | 27-Apr-2016 |
9 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92. Where a difference exists between the above documents and the following conditions, then the following conditions shall prevail. | 19-Sep-1994 | 21-Mar-1995 |
10 | 1 | The development and operations of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 19-Sep-1994 | |
11 | 1 | Where practicable all topsoil being removed ahead of all mining operations from site such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 19-Sep-1994 | |
12 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer. | 19-Sep-1994 | |
13 | 1 | All rubbish and scrap being progressively disposed of in a suitable manner. | 19-Sep-1994 | |
14 | 1 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil where available and rehabilitated to the satisfaction of the State Mining Engineer. | 19-Sep-1994 | |
15 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document is not to commence until a plan of operations and a program to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained. | 19-Sep-1994 | |
16 | 2 | The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines for due compliance with the environmental conditions of the lease in the sum of:
| 24-Feb-1998 | 01-Jul-2013 |
16 | 1 | The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines for due compliance with the environmental conditions of the lease in the sum of:
| 22-Mar-1995 | 23-Feb-1998 |
17 | 2 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
| 02-Sep-2013 | |
17 | 1 | The lessee submitting to the State Mining Engineer, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report to be submitted each year in:
| 22-Mar-1995 | 02-Sep-2013 |
18 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 20-Apr-2012 | 28-Apr-2016 |
19 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 13-Jul-2021 | |
19 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 28-Apr-2016 | 12-Jul-2021 |
20 | 1 | All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety. | 13-Jul-2021 | |
21 | 1 | All excavations will be backfilled and/or closed to ensure they are stable and safe to the satisfaction of the Executive Director, Resource and Environmental Compliance Division, DMIRS. | 13-Jul-2021 | |
22 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of the operation. | 13-Jul-2021 | |
23 | 1 | All chemicals and hydrocarbons will be removed from site prior to or at the termination of the operation. | 13-Jul-2021 | |
24 | 1 | Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time. | 05-Sep-2023 |
Cond # | Ver | Text | Start | End |
---|---|---|---|---|
1 | 1 | Survey. | 19-Sep-1994 | |
2 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 19-Sep-1994 | |
3 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
3 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 19-Sep-1994 | 11-Aug-2005 |
4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Sep-1994 | |
5 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
5 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Sep-1994 | 11-Aug-2005 |
6 | 1 | The lessee within three months of grant submitting a plan of the ongoing mining operations and measures to safeguard the environment to the State Mining Engineer for his assessment and written approval. | 19-Sep-1994 | 21-Mar-1995 |
7 | 1 | The lessee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:
| 19-Sep-1994 | |
8 | 1 | The rights of ingress to and egress from Miscellaneous Licence 36/59 at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 19-Sep-1994 | |
9 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92, 8323/92 and 2004/95;
Where a difference exists between the above documents and the following conditions, then the following conditions shall prevail. | 13-Jul-2021 | |
9 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92, 8323/92 and 2004/95;
Where a difference exists between the above documents and the following conditions, then the following conditions shall prevail. | 07-Sep-2016 | 12-Jul-2021 |
9 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92, 8323/92 and 2004/95;
| 28-Apr-2016 | 06-Sep-2016 |
9 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92, 8323/92 and 2004/95. Where a difference exists between the above documents and the following conditions, then the following conditions shall prevail. | 22-Mar-1995 | 27-Apr-2016 |
9 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
and retained on Department of Minerals and Energy File No. 7927/92. Where a difference exists between the above documents and the following conditions, then the following conditions shall prevail. | 19-Sep-1994 | 21-Mar-1995 |
10 | 1 | The development and operations of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 19-Sep-1994 | |
11 | 1 | Where practicable all topsoil being removed ahead of all mining operations from site such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 19-Sep-1994 | |
12 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer. | 19-Sep-1994 | |
13 | 1 | All rubbish and scrap being progressively disposed of in a suitable manner. | 19-Sep-1994 | |
14 | 1 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil where available and rehabilitated to the satisfaction of the State Mining Engineer. | 19-Sep-1994 | |
15 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document is not to commence until a plan of operations and a program to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained. | 19-Sep-1994 | |
16 | 2 | The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines for due compliance with the environmental conditions of the lease in the sum of:
| 24-Feb-1998 | 01-Jul-2013 |
16 | 1 | The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines for due compliance with the environmental conditions of the lease in the sum of:
| 22-Mar-1995 | 23-Feb-1998 |
17 | 2 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
| 02-Sep-2013 | |
17 | 1 | The lessee submitting to the State Mining Engineer, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report to be submitted each year in:
| 22-Mar-1995 | 02-Sep-2013 |
18 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 20-Apr-2012 | 28-Apr-2016 |
19 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 13-Jul-2021 | |
19 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
| 28-Apr-2016 | 12-Jul-2021 |
20 | 1 | All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety. | 13-Jul-2021 | |
21 | 1 | All excavations will be backfilled and/or closed to ensure they are stable and safe to the satisfaction of the Executive Director, Resource and Environmental Compliance Division, DMIRS. | 13-Jul-2021 | |
22 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of the operation. | 13-Jul-2021 | |
23 | 1 | All chemicals and hydrocarbons will be removed from site prior to or at the termination of the operation. | 13-Jul-2021 | |
24 | 1 | Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time. | 05-Sep-2023 |
Type | Number | Details |
---|---|---|
Bond | PE2123 | Lodged on 29 Nov 1994 For $5,000.00 (Personal Surety)RECORDED 29 Nov 1994RETIRED 20 Aug 1999 |
Bond | PE5000 | Lodged on 03 Aug 1999 For $7,000.00RECORDED 03 Aug 1999Lodged:00:00 03 August 1999Bond Type:Unconditional Performance BondBond Amount:$7,000.00RECORDED:03 August 1999RETIRED - MRF:12 January 2015 |
Bond Requirement | 317347 | Requirement Date:24/02/1998Amount:$7,000.00RECORDED:14:12:06 24 February 1998FINALISED:09:00:13 12 January 2015 |
Forfeiture | 412987 | Initiated:11/12/2012 for non-compliance with reporting requirements( Form 5 )RECORDED:09:50:07 11 December 2012Notice Issued:Regulation 50 Notice sent 11/12/2012 for non-compliance with expenditure requirements pursuant to Reg 32/Sec 82(1)- non lodgement of Form 5.Compliance Date:21/01/2013FINALISED:Order by Minister on 06 March 2013 that M 36/300 be Penalty Imposed |
Fine | 418309 | Fine in respect to:Forfeiture Process 412987Fine reason:Non-compliance with expenditure obligationsPenalty amount:$420.00Notification date:14/03/2013Due date:17/04/2013Pursuant to:Section 97(5)RECORDED:06 March 2013PAYMENT RECEIVED:26 March 2013FINALISED:26 March 2013Receipt Number:01-017060Amount:$420.00Remaining balance:$0.00 |
Application for Forfeiture | 435207 | Lodged:13:50 15 November 2013Applicant:PERVAN, LeninRespondent:JOHN, David GoughRECORDED:13:50 15 November 2013Application for Forfeiture 435207 be withdrawn and no order as to costs.Warden's Determination:Withdrawn 17/07/2015 00:00:00 |
Application to Amend | 443100 | Lodged:15:36 27 March 2014Amending:AddressFrom:JOHN, David Gough, PO BOX 19, LEINSTER, WA, 6437To:JOHN, David Gough, C/- AZUL RESOURCES, PO BOX 1214, ALBANY, WA, 6331RECORDED:15:36 27 March 2014 |
Devolution | 455963 | Lodged:16:15 09 October 2014From:JOHN, David Gough 100/100 sharesTo:GAMBLE, Ronald Derek 100/100 sharesPursuant to:Administration of the Estate of the Late David Gough John of Goanna Patch whom did on 16/02/2014 Granted to Ronald Derek Gamble, Pursuant to Orders of the Court Made 02/09/2014 & 10/09/2014. As Per Request All Correspondence to be sent to McMahmon Mining Title Services Pty Ltd, PO BOX 592 MAYLANDS WA 6931REGISTERED:16:15 09 October 2014 |
Extension of Time | 458447 | Lodged:09:55 01 December 2014Type:Exemption from ExpenditureRECORDED:09:55 01 December 2014APPROVED:10:52:35 19 December 2014 |
Objection | 459733 | Lodged:14:45 23 December 2014Objectors:PERVAN, LeninObjection Type:Exemption From ExpenditureRECORDED:14:45 23 December 2014WITHDRAWN:11:50:57 20 October 2015Wardens Decision Made on:00:00 17 July 2015Wardens Decision Status:FinalisedWardens Decision Text:Application for Objection 459733 withdrawn and no order as to costs. |
Extension / Renewal of Term | 472192 | Lodged:14:50 31 July 2015Applied For Period:21 YearsRECORDED:14:50 31 July 2015GRANTED:26 August 2015Granted Period:21 YearsTerm Renewed To:18/09/2036 |
Application to Amend | 472807 | Lodged:15:20 13 August 2015Amending:AddressFrom:HARRIS, Gay, MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:HARRIS, Gay, 77B GWALIA STREET, LEONORA, WA, 6438RECORDED:15:20 13 August 2015 |
Forfeiture | 518250 | Initiated:14/11/2017 for non-compliance with rent requirementsRECORDED:14:24:21 13 November 2017Notice Issued:Regulation 50 Notice sent 14/11/2017 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:19/12/2017FINALISED:Order by Minister on 13 March 2018 that M 36/300 be No Penalty Imposed |
Application to Amend | 532707 | Lodged:11:00 13 June 2018Amending:Address (Including DTC Details)From:Principal Residence : HARRIS, Gay, SAME AS CORRESPONDENCE and DTC :HARRIS, Gay, 77B GWALIA STREET, LEONORA, WA, 6438To:Principal Residence : HARRIS, Gay, 26 CONLIFFE PLACE, SOUTH KALGOORLIE, WA, 6430 and DTC :HARRIS, Gay, 26 CONLIFFE PLACE, SOUTH KALGOORLIE, WA, 6430RECORDED:11:00 13 June 2018 |
Forfeiture | 544974 | Initiated:20/12/2018 for non-compliance with reporting requirements( Form 5 )RECORDED:13:32:45 18 December 2018Notice Issued:Regulation 50 Notice sent 20/12/2018 for non-compliance with expenditure requirements pursuant to Reg 32/Sec 82(1)- non lodgement of Form 5.Compliance Date:24/01/2019FINALISED:Order by Minister on 22 February 2019 that M 36/300 be Penalty Imposed |
Extension of Time | 545580 | Lodged:11:25 07 January 2019Type:Form 5RECORDED:11:25 07 January 2019REFUSED:16:41:47 12 February 2019 |
Fine | 548139 | Fine in respect to:Forfeiture Process 544974Fine reason:Non-compliance with expenditure obligationsPenalty amount:$480.00Notification date:22/02/2019Due date:29/03/2019Pursuant to:Section 97(5)RECORDED:22 February 2019PAYMENT RECEIVED:08 March 2019FINALISED:08 March 2019Receipt Number:01-033486Amount:$480.00Remaining balance:$0.00 |
Forfeiture | 592293 | Initiated:14/12/2020 for non-compliance with reporting requirements( Form 5 )RECORDED:10:13:25 14 December 2020Notice Issued:Regulation 50 Notice sent 14/12/2020 for non-compliance with expenditure requirements pursuant to Reg 32/Sec 82(1)- non lodgement of Form 5.Compliance Date:18/01/2021FINALISED:Order by Minister on 05 March 2021 that M 36/300 be Penalty Imposed |
Fine | 617201 | Fine in respect to:Forfeiture Process 592293Fine reason:Non-compliance with expenditure obligationsPenalty amount:$600.00Notification date:08/03/2021Due date:13/04/2021Pursuant to:Section 97(5)RECORDED:08 March 2021PAYMENT RECEIVED:12 March 2021FINALISED:12 March 2021Receipt Number:06-179256Amount:$600.00Remaining balance:$0.00 |
Type | Year | Receipt Date | Receipt No. | MR Lodged | Amount | Rental Area | Effective Date | Amt Due | Discrepancy |
---|---|---|---|---|---|---|---|---|---|
Rental | 2025 | 02-Sep-2024 | 06-188880 | PERTH | $6,806.80 | 238.00000 HA | 25-May-1995 | $6,806.80 | $0.00 |
Rental | 2024 | 31-Aug-2023 | 01-041165 | KALGOORLIE | $6,188.00 | 238.00000 HA | 25-May-1995 | $6,188.00 | $0.00 |
Rental | 2023 | 26-Aug-2022 | 01-039805 | KALGOORLIE | $5,712.00 | 238.00000 HA | 25-May-1995 | $5,712.00 | $0.00 |
Rental | 2022 | 13-Aug-2021 | 16050821953 | $5,236.00 | 238.00000 HA | 25-May-1995 | $5,236.00 | $0.00 | |
Rental | 2021 | 19-Aug-2020 | 56239638906 | $870.00 | 238.00000 HA | 25-May-1995 | $4,760.00 | $0.00 | |
Rental | 2021 | 19-Aug-2020 | 56239608389 | $3,890.00 | |||||
Rental | 2020 | 23-Sep-2019 | 01-035256 | KALGOORLIE | $4,712.40 | 238.00000 HA | 25-May-1995 | $4,712.40 | $0.00 |
Rental | 2019 | 28-Sep-2018 | Rental Payment M 36-300 | $4,450.60 | 238.00000 HA | 25-May-1995 | $4,450.60 | $0.00 | |
Rental | 2018 | 24-Nov-2017 | 01-021405 | LEONORA | $4,188.80 | 238.00000 HA | 25-May-1995 | $4,188.80 | $0.00 |
Rental | 2017 | 24-Aug-2016 | MT-210010718608-EF | $4,057.90 | 238.00000 HA | 25-May-1995 | $4,057.90 | $0.00 | |
Rental | 2016 | 31-Jul-2015 | 06-147504 | PERTH | $3,927.00 | 238.00000 HA | 25-May-1995 | $3,927.00 | $0.00 |
Rental | 2015 | 21-Oct-2014 | MT-210010210134-EF | $3,831.80 | 238.00000 HA | 25-May-1995 | $3,831.80 | $0.00 | |
Rental | 2014 | 21-Aug-2013 | 017611 | LEONORA | $3,736.60 | 238.00000 HA | 25-May-1995 | $3,736.60 | $0.00 |
Rental | 2013 | 14-Sep-2012 | 01-016568 | LEONORA | $3,665.20 | 238.00000 HA | 25-May-1995 | $3,665.20 | $0.00 |
Rental | 2012 | 21-Sep-2011 | 15310 | LEONORA | $3,570.00 | 238.00000 HA | 25-May-1995 | $3,570.00 | $0.00 |
Rental | 2011 | 13-Sep-2010 | 13533 | LEONORA | $3,796.10 | 238.00000 HA | 25-May-1995 | $3,796.10 | $0.00 |
Rental | 2010 | 29-Sep-2009 | 70342 | PERTH | $3,717.56 | 238.00000 HA | 25-May-1995 | $3,717.56 | $0.00 |
Rental | 2009 | 15-Jul-2008 | 8446 | LEONORA | $3,560.48 | 238.00000 HA | 25-May-1995 | $3,560.48 | $0.00 |
Rental | 2008 | 09-Jul-2007 | 6514 | LEONORA | $3,455.76 | 238.00000 HA | 25-May-1995 | $3,455.76 | $0.00 |
Rental | 2007 | 06-Jul-2006 | 4291 | LEONORA | $3,298.68 | 238.00000 HA | 25-May-1995 | $3,298.68 | $0.00 |
Rental | 2006 | 16-Aug-2005 | 2477 | LEONORA | $3,193.96 | 238.00000 HA | 25-May-1995 | $3,193.96 | $0.00 |
Rental | 2005 | 15-Jul-2004 | 119 | LEONORA | $3,115.42 | 238.00000 HA | 25-May-1995 | $3,115.42 | $0.00 |
Rental | 2004 | 30-Jun-2003 | 5694 | LEONORA | $3,036.88 | 238.00000 HA | 25-May-1995 | $3,036.88 | $0.00 |
Rental | 2003 | 18-Jul-2002 | 4290 | LEONORA | $76.16 | 238.00000 HA | 25-May-1995 | $2,932.16 | $0.00 |
Rental | 2003 | 11-Jul-2002 | 4244 | LEONORA | $2,856.00 | ||||
Rental | 2002 | 22-Nov-2001 | 43082 | PERTH | $159.46 | 238.00000 HA | 25-May-1995 | $2,856.00 | $0.00 |
Rental | 2002 | 12-Jul-2001 | 2825 | LEONORA | $2,696.54 | ||||
Rental | 2001 | 11-Nov-2016 | (REFUND) 102 | PERTH | $60.05 | 238.00000 HA | 25-May-1995 | $2,696.54 | $0.00 |
Rental | 2001 | 05-Jul-2000 | 102 | LEONORA | $2,756.59 | ||||
Rental | 2000 | 15-Aug-2000 | 26579 | PERTH | $53.58 | 238.00000 HA | 25-May-1995 | $2,504.98 | $0.00 |
Rental | 2000 | 06-Jul-1999 | 43538 | LEONORA | $2,451.40 | ||||
Rental | 1999 | 17-Jul-1998 | 39902 | LEONORA | $2,451.40 | 238.00000 HA | 25-May-1995 | $2,451.40 | $0.00 |
Rental | 1998 | 21-Jul-1997 | 35673 | LEONORA | $2,380.00 | 238.00000 HA | 25-May-1995 | $2,380.00 | $0.00 |
Rental | 1997 | 28-Oct-1996 | 32363 | LEONORA | $120.90 | 238.00000 HA | 25-May-1995 | $2,380.00 | $0.00 |
Rental | 1997 | 19-Aug-1996 | 31440 | LEONORA | $2,259.10 | ||||
Rental | 1996 | 29-Aug-1995 | 26540 | LEONORA | $2,500.90 | 238.00000 HA | 25-May-1995 | $2,380.00 | $120.90 |
Rental | 1995 | 02-Feb-1994 | 19242 | LEONORA | $2,092.50 | 238.00000 HA | 25-May-1995 | $2,213.40 | -$120.90 |
Year | Form 5 Type | Min Expd | Exp Lodged Date | Total Expd | Exemp No | Exemp Lodged | Exemp Amt | Exemp Status | Outcome Date | Exploration Activities | Mining Activities | Aboriginal Survey | Rent | Administration | Prospecting | Strike Through |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2025 | $23,800.00 | false | ||||||||||||||
2024 | $23,800.00 | 26-Sep-2024 | $38,056.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $38,056.00 | false | ||||||
2023 | $23,800.00 | 17-Aug-2023 | $40,612.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $40,612.00 | false | ||||||
2022 | $23,800.00 | 26-Aug-2022 | $40,012.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $40,012.00 | false | ||||||
2021 | $23,800.00 | 28-Jul-2021 | $39,912.11 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $39,912.11 | false | ||||||
2020 | $23,800.00 | 23-Dec-2020 | $34,260.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $34,260.00 | false | ||||||
2019 | $23,800.00 | 25-Sep-2019 | $29,953.66 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $29,953.66 | false | ||||||
2018 | $23,800.00 | 07-Jan-2019 | $29,050.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $29,050.00 | false | ||||||
2017 | $23,800.00 | 29-Aug-2017 | $65,135.50 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $65,135.50 | false | ||||||
2016 | $23,800.00 | 11-Oct-2016 | $82,957.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $82,957.00 | false | ||||||
2015 | $17,850.00 | 31-Aug-2015 | $40,880.58 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $40,880.58 | false | ||||||
2014 | $3,967.00 | 14-Nov-2014 | $6,252.00 | $0.00 | $0.00 | $0.00 | $6,252.00 | $0.00 | $0.00 | false | ||||||
2013 | $23,800.00 | 01-Nov-2013 | $37,595.00 | 456025 | 10-Oct-2014 | $23,800.00 | Granted | 10-Nov-2015 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $37,595.00 | false | |
2012 | $23,800.00 | 02-Jan-2013 | $32,308.20 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $32,308.20 | false | ||||||
2011 | $23,800.00 | 14-Nov-2011 | $38,998.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $38,998.00 | false | ||||||
2010 | $23,800.00 | 08-Nov-2010 | $31,830.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $31,830.00 | false | ||||||
2009 | $23,800.00 | 17-Nov-2009 | $36,434.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $36,434.00 | false | ||||||
2008 | $23,800.00 | 17-Nov-2008 | $40,484.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $40,484.00 | false | ||||||
2007 | $23,800.00 | 12-Nov-2007 | $41,230.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $41,230.00 | false | ||||||
2006 | $23,800.00 | 10-Nov-2006 | $29,590.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $29,590.00 | false | ||||||
2005 | $23,800.00 | 10-Nov-2005 | $36,270.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $36,270.00 | false | ||||||
2004 | $23,800.00 | 11-Nov-2004 | $33,100.00 | $0.00 | $29,100.00 | $0.00 | $4,000.00 | $0.00 | $0.00 | false | ||||||
2003 | $23,800.00 | 04-Nov-2003 | $39,123.00 | $0.00 | $34,767.00 | $0.00 | $4,356.00 | $0.00 | $0.00 | false | ||||||
2002 | $23,800.00 | 29-Oct-2002 | $40,594.00 | $0.00 | $36,494.00 | $0.00 | $4,100.00 | $0.00 | $0.00 | false | ||||||
2001 | $23,800.00 | 16-Nov-2001 | $38,642.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | false | ||||||
2000 | $23,800.00 | 13-Nov-2000 | $41,349.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | false | ||||||
1999 | $23,800.00 | 17-Nov-1999 | $32,053.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | false | ||||||
1998 | $23,800.00 | 23-Nov-1998 | $27,800.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | false | ||||||
1997 | $23,800.00 | 14-Nov-1997 | $32,550.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | false | ||||||
1996 | $23,800.00 | 25-Oct-1996 | $31,050.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | false | ||||||
1995 | $22,900.00 | 03-Nov-1995 | $66,050.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | false |
Bond Number | Name | Surety | Amount | Bond Date | Status | Status Date | Type | Ceased | Other Affected Tenements |
---|---|---|---|---|---|---|---|---|---|
317347 | Bond Requirement | $7,000.00 | 06-Apr-2009 | Finalised | 12-Jan-2015 | true | |||
PE5000 | Bond - Unconditional Performance Bond | NATIONAL AUSTRALIA BANK LIMITED | $7,000.00 (Inital) | 03-Aug-1999 | Retired - MRF | 12-Jan-2015 | Unconditional Performance Bond | true | |
PE2123 | Bond - Personal Surety | $5,000.00 (Inital) | 29-Nov-1994 | Retired | 20-Aug-1999 | Personal Surety | true |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
---|---|---|---|---|---|---|---|---|---|
Tenement Application |