1 | 1 | Survey. | 18-Mar-1986 | |
2 | 1 | Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which is likely to interfere with or damage any Aboriginal site. | 18-Mar-1986 | |
3 | 2 | No developmental or productive mining being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained. | 12-Aug-2005 | |
3 | 1 | No developmental or productive mining being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained. | 18-Mar-1986 | 11-Aug-2005 |
4 | 1 | All topsoil being removed ahead of mining operations and stockpiled for replacement in accordance with the directions of the District Mining Engineer. | 18-Mar-1986 | |
5 | 1 | Mining on any road or road reserve being confined to below a depth of 15 metres from the natural surface. | 18-Mar-1986 | |
6 | 1 | The complete excision of Prospecting Licence 20/608 with the rights of ingress to and egress from the ground comprised therein being at all times preserved to the licensee thereof. | 18-Mar-1986 | 16-Mar-1987 |
7 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:- "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
- "NOI Low Impact Mining Operation - Nemesis Costeans (MP 5513)" dated 18 October 2006
Retained on Department of Industry and Resources File no. E0296/200601 Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 18-Jun-2007 | |
7 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:- "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
retained on Department of Minerals and Energy File No. 4141/00. Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 18-May-2002 | 17-Jun-2007 |
7 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:- "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
- "Low Impact Mining Operations - Bottle Dump" (L Baker) dated 25 April 2000 (NOI 3356).
retained on Department of Minerals and Energy File No. 4141/00. Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Aug-2000 | 17-May-2002 |
8 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 04-Aug-2000 | |
9 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 04-Aug-2000 | |
10 | 2 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Director, Environment DoIR | 18-Jun-2007 | |
10 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer. | 04-Aug-2000 | 17-Jun-2007 |
11 | 1 | All rubbish and scrap being progressively disposed of in a suitable manner. | 04-Aug-2000 | |
12 | 2 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the Director, Environment, DoIR | 18-Jun-2007 | |
12 | 1 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the State Mining Engineer. | 04-Aug-2000 | 17-Jun-2007 |
13 | 2 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Director, Environment, DoIR for his assessment and until his written approval to proceed has been obtained. | 12-Aug-2005 | |
13 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained. | 04-Aug-2000 | 11-Aug-2005 |
14 | 1 | The lessee arranging lodgement of a Bond in favour of the Minister for Mines for due compliance with the environmental conditions of the lease, in the sum of: | 04-Aug-2000 | 20-May-2013 |
15 | 3 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 29-Aug-2013 | |
15 | 2 | The lessee submitting to the Director, Environment, DoIR, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 18-Jun-2007 | 29-Aug-2013 |
15 | 1 | The lessee submitting to the State Mining Engineer, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 04-Aug-2000 | 17-Jun-2007 |
16 | 1 | All costeans and other disturbances to the surface of the land including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 18-Jun-2007 | |
17 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 17-May-2018 | |
18 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 17-May-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | Survey. | 18-Mar-1986 | |
2 | 1 | Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which is likely to interfere with or damage any Aboriginal site. | 18-Mar-1986 | |
3 | 2 | No developmental or productive mining being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained. | 12-Aug-2005 | |
3 | 1 | No developmental or productive mining being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained. | 18-Mar-1986 | 11-Aug-2005 |
4 | 1 | All topsoil being removed ahead of mining operations and stockpiled for replacement in accordance with the directions of the District Mining Engineer. | 18-Mar-1986 | |
5 | 1 | Mining on any road or road reserve being confined to below a depth of 15 metres from the natural surface. | 18-Mar-1986 | |
6 | 1 | The complete excision of Prospecting Licence 20/608 with the rights of ingress to and egress from the ground comprised therein being at all times preserved to the licensee thereof. | 18-Mar-1986 | 16-Mar-1987 |
7 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:- "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
- "NOI Low Impact Mining Operation - Nemesis Costeans (MP 5513)" dated 18 October 2006
Retained on Department of Industry and Resources File no. E0296/200601 Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 18-Jun-2007 | |
7 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:- "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
retained on Department of Minerals and Energy File No. 4141/00. Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 18-May-2002 | 17-Jun-2007 |
7 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:- "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
- "Low Impact Mining Operations - Bottle Dump" (L Baker) dated 25 April 2000 (NOI 3356).
retained on Department of Minerals and Energy File No. 4141/00. Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 04-Aug-2000 | 17-May-2002 |
8 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 04-Aug-2000 | |
9 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 04-Aug-2000 | |
10 | 2 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Director, Environment DoIR | 18-Jun-2007 | |
10 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer. | 04-Aug-2000 | 17-Jun-2007 |
11 | 1 | All rubbish and scrap being progressively disposed of in a suitable manner. | 04-Aug-2000 | |
12 | 2 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the Director, Environment, DoIR | 18-Jun-2007 | |
12 | 1 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the State Mining Engineer. | 04-Aug-2000 | 17-Jun-2007 |
13 | 2 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Director, Environment, DoIR for his assessment and until his written approval to proceed has been obtained. | 12-Aug-2005 | |
13 | 1 | Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained. | 04-Aug-2000 | 11-Aug-2005 |
14 | 1 | The lessee arranging lodgement of a Bond in favour of the Minister for Mines for due compliance with the environmental conditions of the lease, in the sum of: | 04-Aug-2000 | 20-May-2013 |
15 | 3 | The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 29-Aug-2013 | |
15 | 2 | The lessee submitting to the Director, Environment, DoIR, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 18-Jun-2007 | 29-Aug-2013 |
15 | 1 | The lessee submitting to the State Mining Engineer, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in: | 04-Aug-2000 | 17-Jun-2007 |
16 | 1 | All costeans and other disturbances to the surface of the land including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 18-Jun-2007 | |
17 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 17-May-2018 | |
18 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 17-May-2018 | |
Type | Number | Details |
Plaint | MM01/889 | Lodged 9:00 AM on 23 Aug 1988 (for forfeiture) by Richard John HARENRECORDED 9:00 AM 23 Aug 1988WITHDRAWN by leave of Warden 25 Oct 1988 |
Agreement | 600H/889 | Agreement (Sale or Sale and Purchase) Lodged 3:00:00 PM on 10 Mar 1989REGISTERED 3:00 PM 10 Mar 1989 |
Caveat | 2760H/889 | Lodged 3:00 PM on 10 May 1989 by METANA MINERALS NLRECORDED 3:00 PM 10 May 1989WITHDRAWN 3:25:00 PM 07 Apr 1992 |
Withdrawal of Dealing | 855H/912 | Lodged 3:25:00 PM on 07 Apr 1992 withdrawing Caveat 2760H/889REGISTERED 3:25 PM 07 Apr 1992 |
Plaint | MM1/989 | Lodged 11:14:00 AM on 02 Jul 1998 (for forfeiture) by Bruce Ashley TURNERRECORDED 11:14 AM 02 Jul 1998WITHDRAWN 17 Nov 1998 |
Application to Amend | 529H/990 | Lodged on 29 Jun 2000 amending total number of shares to "100"REGISTERED 29 Jun 2000 |
Bond | PE5561 | Lodged on 30 Jun 2000 For $10,000.00 (Personal Surety)RECORDED 30 Jun 2000RETIRED 16 Mar 2005 |
Bond Requirement | 312116 | Requirement Date:04/08/2000Amount:$10,000.00RECORDED:08:05 04 August 2000FINALISED:11:12:55 20 May 2013 |
Fine | 200882 | Penalty of $100 imposed Pursuant to Section 97(5)
Date Due 01 Sep 2004 Date Paid: 01 Sep 2004RECORDED 02 Aug 2004Penalty amount:$100.00Notification date:02/08/2004Due date:01/09/2004Pursuant to:Section 97(5)RECORDED:02 August 2004PAYMENT RECEIVED:01 September 2004Receipt Number:2230Amount:$100.00Receipt Number:2137Amount:$100.00 |
Caveat | 185H/045 | Lodged 2:10:00 PM on 09 Nov 2004 by Gregory Raymond KENNEY in respect to 99/100ths shares in the name of Darrell Redvers HIGHAMRECORDED 2:10 PM 09 Nov 2004Affected Dealing:Transfer 35447714 day notice sent:03 September 2010LAPSED:00:00 17 September 2010 |
Bond | 209623 | Lodged on 14 Jan 2005 For $10,000.00 (Security)RECORDED 14 Jan 2005RETIRED:21 September 2010 |
Caveat | 392H/045 | Lodged 11:00:00 AM on 04 Apr 2005 by SANDAMARA NOMINEES PTY LTDRECORDED 11:00 AM 04 Apr 2005WITHDRAWN:16:00 25 January 2010 |
Fine | 223350 | Penalty of $200 imposed pursuant to Section 97(5)
Date Due: 06 Oct 2005 Date Paid: 23 Sept 2005RECORDED 06 Sep 2005Penalty amount:$200.00Notification date:06/09/2005Due date:06/10/2005Pursuant to:Section 97(5)RECORDED:06 September 2005PAYMENT RECEIVED:23 September 2005FINALISED:23 September 2005Receipt Number:15975Amount:$200.00 |
Caveat | 977H/067 | Lodged 3:15:00 PM on 05 Jan 2007 pursuant to Section 122A(1)(a) by MID-WEST GOLD OPERATIONS PTY LTD in respect to 100/100ths shares in the name of Darrell Redvers HIGHAMREJECTED 3:15 PM 05 Jan 2007 |
Extension / Renewal of Term | MM22/067 | Lodged 1:15:00 PM on 16 Mar 2007 applied for a period of 21 YearsRECORDED 1:15 PM 16 Mar 2007GRANTED 29 Mar 2007 for a further period of 21 Years |
Caveat | 269878 | Lodged 3:37 PM on 11 Jul 2007 pursuant to Section 122A(1)(a) by Roger Boyd SPENCER in respect to 100/100ths shares in the name of Darrell Redvers HIGHAMRECORDED 3:37 PM 11 Jul 2007WITHDRAWN:13:10 15 February 2010 |
Forfeiture | 321643 | Initiated:26/05/2009 for non-payment of rentRECORDED:10:25:19 26 May 2009Notice Issued:Regulation 50 Notice sent 26/05/2009 for non-payment of rent pursuant to Reg 109.WITHDRAWN:26 May 2009 (On another forfeiture list) |
Forfeiture | 321672 | Initiated:26/05/2009 for non-payment of rentRECORDED:14:21:04 26 May 2009Notice Issued:Regulation 50 Notice sent 26/05/2009 for non-payment of rent pursuant to Reg 109.Compliance Date:26/06/2009FINALISED:Order by Minister on 27 July 2009 that Penalty Imposed |
Fine | 326578 | Fine in respect to:Forfeiture Process 321672Fine reason:Non-compliance with rent obligationsPenalty amount:$195.00Notification date:29/07/2009Due date:31/08/2009Pursuant to:Section 97(5)RECORDED:29 July 2009PAYMENT RECEIVED:18 August 2009Receipt Number:68563Amount:$195.00Remaining balance:$0.00FINALISED:18 August 2009 |
Withdrawal of Dealing | 339449 | Lodged:16:00 25 January 2010In respect to:Caveat 392H/045 (212602)RECORDED:16:00 25 January 2010 |
Withdrawal of Dealing | 340819 | Lodged:13:10 15 February 2010In respect to:Caveat 269878RECORDED:13:10 15 February 2010 |
Bond | 355846 | Lodged:15:00 20 September 2010Bond Type:SecurityBond Amount:$10,000.00RECORDED:20 September 2010RETIRED:20 May 2013 |
Application to Amend | 357822 | Lodged:12:50 20 October 2010Amending:AddressFrom:STONEVALE ENTERPRISES PTY LTD, 9 YAMPI WAY, WILLETON, WA, 6155, AUSTRALIATo:STONEVALE ENTERPRISES PTY LTD, PO BOX 369, INGLEWOOD, WA, 6932, AUSTRALIARECORDED:12:50 20 October 2010 |
Application to Amend | 378058 | Lodged:13:25 29 July 2011Amending:AddressFrom:STONEVALE ENTERPRISES PTY LTD, PO BOX 369, INGLEWOOD, WA, 6932To:STONEVALE ENTERPRISES PTY LTD, 3/10 CARBON COURT, OSBORNE PARK, WA, 6017RECORDED:13:25 29 July 2011 |
Iron Ore Inclusion | 417452 | Lodged:11:50 20 February 2013RECORDED:11:50 20 February 2013AUTHORISED:11:50 20 February 2013 |
Application to Amend | 423038 | Lodged:15:30 10 May 2013Amending:AddressFrom:Residential : STONEVALE ENTERPRISES PTY LTD, SAME AS CORRESPONDENCE and Correspondence :STONEVALE ENTERPRISES PTY LTD, 3/10 CARBON COURT, OSBORNE PARK, WA, 6017To:Residential : STONEVALE ENTERPRISES PTY LTD, ADDRESS NOT PROVIDED and Correspondence :STONEVALE ENTERPRISES PTY LTD, PO BOX 1093, NEDLANDS, WA, 6909RECORDED:15:30 10 May 2013 |
Application to Amend | 438813 | Lodged:09:30 17 January 2014Amending:AddressFrom:STONEVALE ENTERPRISES PTY LTD, PO BOX 1093, NEDLANDS, WA, 6909To:STONEVALE ENTERPRISES PTY LTD, PO BOX 559, NORTH PERTH, WA, 6960RECORDED:09:30 17 January 2014 |
Forfeiture | 554287 | Initiated:23/05/2019 for non-compliance with rent requirementsRECORDED:15:51:19 21 May 2019Notice Issued:Regulation 50 Notice sent 23/05/2019 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:27/06/2019FINALISED:Order by Minister on 03 July 2019 that M 20/33-I be Penalty Imposed |
Fine | 557770 | Fine in respect to:Forfeiture Process 554287Fine reason:Non-compliance with rent obligationsPenalty amount:$260.00Notification date:03/07/2019Due date:07/08/2019Pursuant to:Section 97(5)RECORDED:03 July 2019PAYMENT RECEIVED:10 July 2019FINALISED:11 July 2019Receipt Number:10104730Amount:$260.00Remaining balance:$0.00 |
Application to Amend | 578825 | Lodged:11:44:22 27 May 2020Amending:Address (Including DTC Details)From:VICTORY GOLDFIELDS PTY LTD, LEVEL 5, 35 HAVELOCK STREET, WEST PERTH, WA, 6005To:VICTORY GOLDFIELDS PTY LTD, C/- VICTORY GOLDFIELDS PTY LTD, PO BOX 557, SOUTH PERTH, WA, 6951, xxxxxxxxx@victorygold.com.auRECORDED:11:44:22 27 May 2020 |
Application to Amend | 628171 | Lodged:08:30 15 July 2021Amending:NameFrom:VICTORY GOLDFIELDS PTY LTDTo:VICTORY CUE PTY LTDRECORDED:08:30 15 July 2021 |
Application to Amend | 631531 | Lodged:11:34:54 31 August 2021Amending:Address (Including DTC Details)From:Principal Place of Business : VICTORY CUE PTY LTD, LEVEL 5, 35 HAVELOCK STREET, WEST PERTH, WA, 6005 and DTC :VICTORY CUE PTY LTD, C/- VICTORY GOLDFIELDS PTY LTD, PO BOX 557, SOUTH PERTH, WA, 6951, xxxxxxxxx@victorygold.com.auTo:Principal Place of Business : VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656 and DTC :VICTORY CUE PTY LTD, VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656RECORDED:11:34:54 31 August 2021 |
Application to Amend | 648811 | Lodged:09:28:36 10 May 2022Amending:Address (Including DTC Details)From:Principal Place of Business : VICTORY CUE PTY LTD, SUITE 1, 295 ROKEBY ROAD, SUBIACO, WA, 6008 and DTC :VICTORY CUE PTY LTD, VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656To:Principal Place of Business : VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656 and DTC :VICTORY CUE PTY LTD, C/- VCUE, SUITE 1, 295 ROKEBY ROAD, SUBIACO, WA, 6008, xxxx@victorygold.com.au, xxxxxxx743RECORDED:09:28:36 10 May 2022 |
Application to Amend | 648812 | Lodged:09:28:36 10 May 2022Amending:Address (Including DTC Details)From:VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656To:VICTORY CUE PTY LTD, SUITE 1, 295 ROKEBY ROAD, SUBIACO, WA, 6008RECORDED:09:28:36 10 May 2022 |
Application to Amend | 680761 | Lodged:14:18:59 11 July 2023Amending:Address (Including DTC Details)From:VICTORY CUE PTY LTD, C/- VCUE, SUITE 1, 295 ROKEBY ROAD, SUBIACO, WA, 6008, xxxx@victorygold.com.au, xxxxxxx743To:VICTORY CUE PTY LTD, C/- VCUE, PO BOX 1112, KALAMUNDA, WA, 6926, xxxxxxx@datumpeg.com.au, xxxxxxx769RECORDED:14:18:59 11 July 2023 |
Application to Amend | 683100 | Lodged:14:25 07 August 2023From:BURNELL, Ryan EdwardAmending:NameTo:BURNELL, RyanREJECTED:14:25 07 August 2023 |
Application to Amend | 683463 | Lodged:13:55 11 August 2023Amending:Address (Including DTC Details)From:BURNELL, Ryan Edward, RYAN BURNELL, PO BOX 225, NORTH PERTH, WA, 6906, xxxxxxxxxxx@gmail.com, xxxxxxx842To:BURNELL, Ryan Edward, RYAN EDWARD BURNELL, PO BOX 225, NORTH PERTH, WA, 6906, xxxxxxxxxxx@gmail.com, xxxxxxx842RECORDED:13:55 11 August 2023 |
Forfeiture | 705009 | Initiated:28/05/2024 for non-compliance with rent requirementsRECORDED:10:30 28 May 2024FINALISED:Order by Minister on 01 October 2024 that M 20/33-I be Penalty ImposedNotice Issued:Regulation 50 Notice sent 28/05/2024 for non-compliance with rent requirements pursuant to Reg 109/Sec 82(1)- late payment of rent.Compliance Date:02/07/2024 |
Fine | 716101 | Fine in respect to:Forfeiture Process 705009Fine reason:Non-compliance with rent obligationsPenalty amount:$184.00Notification date:03/10/2024Due date:07/11/2024Pursuant to:Section 97(5)RECORDED:03 October 2024PAYMENT RECEIVED:07 October 2024FINALISED:09 October 2024Receipt Number:10680126Amount:$184.00Remaining balance:$0.00Receipt Number:10695573Amount:$184.00Remaining balance:-$184.00 |