Tenement: M20/33

View on Landtracker Maps (logon required)

Extracted from MTO on 21-May-2025 00:49, last changed 21-May-2025.

Tenement Summary

Identifier:M 20/33-IType:Mining Lease
Status:LiveDistrict:CUE
Lodged:MT. MAGNETArea:141.65000 HA
Purposes:Term:21 Years (Renewed)
Markout:24-Jul-1985 15:00Received:24-Jul-1985 15:50
Commence:18-Mar-1986 Expiry:17-Mar-2028

Holders

Company NameSharesTotal Shares
BURNELL, Ryan Edward100100

Applicants on Receival

Company NameSharesTotal Shares
GUISE, Anthony John9696

Shires

Shire NameShire NumberStartArea
CUE SHIRE238024-Jul-1985 141.65000 HA

Conditions

#VerTextStartEnd
11Survey.18-Mar-1986
21Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which is likely to interfere with or damage any Aboriginal site.18-Mar-1986
32No developmental or productive mining being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained.12-Aug-2005
31No developmental or productive mining being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained.18-Mar-1986 11-Aug-2005
41All topsoil being removed ahead of mining operations and stockpiled for replacement in accordance with the directions of the District Mining Engineer.18-Mar-1986
51Mining on any road or road reserve being confined to below a depth of 15 metres from the natural surface.18-Mar-1986
61The complete excision of Prospecting Licence 20/608 with the rights of ingress to and egress from the ground comprised therein being at all times preserved to the licensee thereof.18-Mar-1986 16-Mar-1987
73The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
  • "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
  • "NOI Low Impact Mining Operation - Nemesis Costeans (MP 5513)" dated 18 October 2006
Retained on Department of Industry and Resources File no. E0296/200601
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
18-Jun-2007
72The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
  • "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
retained on Department of Minerals and Energy File No. 4141/00.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
18-May-2002 17-Jun-2007
71The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
  • "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
  • "Low Impact Mining Operations - Bottle Dump" (L Baker) dated 25 April 2000 (NOI 3356).
retained on Department of Minerals and Energy File No. 4141/00.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
04-Aug-2000 17-May-2002
81The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.04-Aug-2000
91All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses.04-Aug-2000
102At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Director, Environment DoIR18-Jun-2007
101At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer.04-Aug-2000 17-Jun-2007
111All rubbish and scrap being progressively disposed of in a suitable manner.04-Aug-2000
122At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the Director, Environment, DoIR18-Jun-2007
121At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the State Mining Engineer.04-Aug-2000 17-Jun-2007
132Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Director, Environment, DoIR for his assessment and until his written approval to proceed has been obtained.12-Aug-2005
131Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained.04-Aug-2000 11-Aug-2005
141The lessee arranging lodgement of a Bond in favour of the Minister for Mines for due compliance with the environmental conditions of the lease, in the sum of:
  • $10,000
04-Aug-2000 20-May-2013
153The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • May
29-Aug-2013
152The lessee submitting to the Director, Environment, DoIR, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • May
18-Jun-2007 29-Aug-2013
151The lessee submitting to the State Mining Engineer, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • May
04-Aug-2000 17-Jun-2007
161All costeans and other disturbances to the surface of the land including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.18-Jun-2007
171All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.17-May-2018
181Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.17-May-2018

Endorsements

Cond #VerTextStartEnd
11Survey.18-Mar-1986
21Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which is likely to interfere with or damage any Aboriginal site.18-Mar-1986
32No developmental or productive mining being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained.12-Aug-2005
31No developmental or productive mining being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained.18-Mar-1986 11-Aug-2005
41All topsoil being removed ahead of mining operations and stockpiled for replacement in accordance with the directions of the District Mining Engineer.18-Mar-1986
51Mining on any road or road reserve being confined to below a depth of 15 metres from the natural surface.18-Mar-1986
61The complete excision of Prospecting Licence 20/608 with the rights of ingress to and egress from the ground comprised therein being at all times preserved to the licensee thereof.18-Mar-1986 16-Mar-1987
73The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
  • "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
  • "NOI Low Impact Mining Operation - Nemesis Costeans (MP 5513)" dated 18 October 2006
Retained on Department of Industry and Resources File no. E0296/200601
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
18-Jun-2007
72The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
  • "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
retained on Department of Minerals and Energy File No. 4141/00.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
18-May-2002 17-Jun-2007
71The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
  • "NOI Low Impact Mining Operation - Nemesis Project" (Higham) dated 19 March 2000, and
  • "Low Impact Mining Operations - Bottle Dump" (L Baker) dated 25 April 2000 (NOI 3356).
retained on Department of Minerals and Energy File No. 4141/00.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail.
04-Aug-2000 17-May-2002
81The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.04-Aug-2000
91All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses.04-Aug-2000
102At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Director, Environment DoIR18-Jun-2007
101At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer.04-Aug-2000 17-Jun-2007
111All rubbish and scrap being progressively disposed of in a suitable manner.04-Aug-2000
122At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the Director, Environment, DoIR18-Jun-2007
121At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the State Mining Engineer.04-Aug-2000 17-Jun-2007
132Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the Director, Environment, DoIR for his assessment and until his written approval to proceed has been obtained.12-Aug-2005
131Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a programme to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained.04-Aug-2000 11-Aug-2005
141The lessee arranging lodgement of a Bond in favour of the Minister for Mines for due compliance with the environmental conditions of the lease, in the sum of:
  • $10,000
04-Aug-2000 20-May-2013
153The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • May
29-Aug-2013
152The lessee submitting to the Director, Environment, DoIR, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • May
18-Jun-2007 29-Aug-2013
151The lessee submitting to the State Mining Engineer, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:
  • May
04-Aug-2000 17-Jun-2007
161All costeans and other disturbances to the surface of the land including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.18-Jun-2007
171All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.17-May-2018
181Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.17-May-2018

Dealings

TypeNumberDetails
PlaintMM01/889Lodged 9:00 AM on 23 Aug 1988 (for forfeiture) by Richard John HARENRECORDED 9:00 AM 23 Aug 1988WITHDRAWN by leave of Warden 25 Oct 1988
Agreement600H/889Agreement (Sale or Sale and Purchase) Lodged 3:00:00 PM on 10 Mar 1989REGISTERED 3:00 PM 10 Mar 1989
Caveat2760H/889Lodged 3:00 PM on 10 May 1989 by METANA MINERALS NLRECORDED 3:00 PM 10 May 1989WITHDRAWN 3:25:00 PM 07 Apr 1992
Withdrawal of Dealing855H/912Lodged 3:25:00 PM on 07 Apr 1992 withdrawing Caveat 2760H/889REGISTERED 3:25 PM 07 Apr 1992
PlaintMM1/989Lodged 11:14:00 AM on 02 Jul 1998 (for forfeiture) by Bruce Ashley TURNERRECORDED 11:14 AM 02 Jul 1998WITHDRAWN 17 Nov 1998
Application to Amend529H/990Lodged on 29 Jun 2000 amending total number of shares to "100"REGISTERED 29 Jun 2000
BondPE5561Lodged on 30 Jun 2000 For $10,000.00 (Personal Surety)RECORDED 30 Jun 2000RETIRED 16 Mar 2005
Bond Requirement312116Requirement Date:04/08/2000Amount:$10,000.00RECORDED:08:05 04 August 2000FINALISED:11:12:55 20 May 2013
Fine200882Penalty of $100 imposed Pursuant to Section 97(5) Date Due 01 Sep 2004 Date Paid: 01 Sep 2004RECORDED 02 Aug 2004Penalty amount:$100.00Notification date:02/08/2004Due date:01/09/2004Pursuant to:Section 97(5)RECORDED:02 August 2004PAYMENT RECEIVED:01 September 2004Receipt Number:2230Amount:$100.00Receipt Number:2137Amount:$100.00
Caveat185H/045Lodged 2:10:00 PM on 09 Nov 2004 by Gregory Raymond KENNEY in respect to 99/100ths shares in the name of Darrell Redvers HIGHAMRECORDED 2:10 PM 09 Nov 2004Affected Dealing:Transfer 35447714 day notice sent:03 September 2010LAPSED:00:00 17 September 2010
Bond209623Lodged on 14 Jan 2005 For $10,000.00 (Security)RECORDED 14 Jan 2005RETIRED:21 September 2010
Caveat392H/045Lodged 11:00:00 AM on 04 Apr 2005 by SANDAMARA NOMINEES PTY LTDRECORDED 11:00 AM 04 Apr 2005WITHDRAWN:16:00 25 January 2010
Fine223350Penalty of $200 imposed pursuant to Section 97(5) Date Due: 06 Oct 2005 Date Paid: 23 Sept 2005RECORDED 06 Sep 2005Penalty amount:$200.00Notification date:06/09/2005Due date:06/10/2005Pursuant to:Section 97(5)RECORDED:06 September 2005PAYMENT RECEIVED:23 September 2005FINALISED:23 September 2005Receipt Number:15975Amount:$200.00
Caveat977H/067Lodged 3:15:00 PM on 05 Jan 2007 pursuant to Section 122A(1)(a) by MID-WEST GOLD OPERATIONS PTY LTD in respect to 100/100ths shares in the name of Darrell Redvers HIGHAMREJECTED 3:15 PM 05 Jan 2007
Extension / Renewal of TermMM22/067Lodged 1:15:00 PM on 16 Mar 2007 applied for a period of 21 YearsRECORDED 1:15 PM 16 Mar 2007GRANTED 29 Mar 2007 for a further period of 21 Years
Caveat269878Lodged 3:37 PM on 11 Jul 2007 pursuant to Section 122A(1)(a) by Roger Boyd SPENCER in respect to 100/100ths shares in the name of Darrell Redvers HIGHAMRECORDED 3:37 PM 11 Jul 2007WITHDRAWN:13:10 15 February 2010
Forfeiture321643Initiated:26/05/2009 for non-payment of rentRECORDED:10:25:19 26 May 2009Notice Issued:Regulation 50 Notice sent 26/05/2009 for non-payment of rent pursuant to Reg 109.WITHDRAWN:26 May 2009 (On another forfeiture list)
Forfeiture321672Initiated:26/05/2009 for non-payment of rentRECORDED:14:21:04 26 May 2009Notice Issued:Regulation 50 Notice sent 26/05/2009 for non-payment of rent pursuant to Reg 109.Compliance Date:26/06/2009FINALISED:Order by Minister on 27 July 2009 that Penalty Imposed
Fine326578Fine in respect to:Forfeiture Process 321672Fine reason:Non-compliance with rent obligationsPenalty amount:$195.00Notification date:29/07/2009Due date:31/08/2009Pursuant to:Section 97(5)RECORDED:29 July 2009PAYMENT RECEIVED:18 August 2009Receipt Number:68563Amount:$195.00Remaining balance:$0.00FINALISED:18 August 2009
Withdrawal of Dealing339449Lodged:16:00 25 January 2010In respect to:Caveat 392H/045 (212602)RECORDED:16:00 25 January 2010
Withdrawal of Dealing340819Lodged:13:10 15 February 2010In respect to:Caveat 269878RECORDED:13:10 15 February 2010
Bond355846Lodged:15:00 20 September 2010Bond Type:SecurityBond Amount:$10,000.00RECORDED:20 September 2010RETIRED:20 May 2013
Application to Amend357822Lodged:12:50 20 October 2010Amending:AddressFrom:STONEVALE ENTERPRISES PTY LTD, 9 YAMPI WAY, WILLETON, WA, 6155, AUSTRALIATo:STONEVALE ENTERPRISES PTY LTD, PO BOX 369, INGLEWOOD, WA, 6932, AUSTRALIARECORDED:12:50 20 October 2010
Application to Amend378058Lodged:13:25 29 July 2011Amending:AddressFrom:STONEVALE ENTERPRISES PTY LTD, PO BOX 369, INGLEWOOD, WA, 6932To:STONEVALE ENTERPRISES PTY LTD, 3/10 CARBON COURT, OSBORNE PARK, WA, 6017RECORDED:13:25 29 July 2011
Iron Ore Inclusion417452Lodged:11:50 20 February 2013RECORDED:11:50 20 February 2013AUTHORISED:11:50 20 February 2013
Application to Amend423038Lodged:15:30 10 May 2013Amending:AddressFrom:Residential : STONEVALE ENTERPRISES PTY LTD, SAME AS CORRESPONDENCE and Correspondence :STONEVALE ENTERPRISES PTY LTD, 3/10 CARBON COURT, OSBORNE PARK, WA, 6017To:Residential : STONEVALE ENTERPRISES PTY LTD, ADDRESS NOT PROVIDED and Correspondence :STONEVALE ENTERPRISES PTY LTD, PO BOX 1093, NEDLANDS, WA, 6909RECORDED:15:30 10 May 2013
Application to Amend438813Lodged:09:30 17 January 2014Amending:AddressFrom:STONEVALE ENTERPRISES PTY LTD, PO BOX 1093, NEDLANDS, WA, 6909To:STONEVALE ENTERPRISES PTY LTD, PO BOX 559, NORTH PERTH, WA, 6960RECORDED:09:30 17 January 2014
Forfeiture554287Initiated:23/05/2019 for non-compliance with rent requirementsRECORDED:15:51:19 21 May 2019Notice Issued:Regulation 50 Notice sent 23/05/2019 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:27/06/2019FINALISED:Order by Minister on 03 July 2019 that M 20/33-I be Penalty Imposed
Fine557770Fine in respect to:Forfeiture Process 554287Fine reason:Non-compliance with rent obligationsPenalty amount:$260.00Notification date:03/07/2019Due date:07/08/2019Pursuant to:Section 97(5)RECORDED:03 July 2019PAYMENT RECEIVED:10 July 2019FINALISED:11 July 2019Receipt Number:10104730Amount:$260.00Remaining balance:$0.00
Application to Amend578825Lodged:11:44:22 27 May 2020Amending:Address (Including DTC Details)From:VICTORY GOLDFIELDS PTY LTD, LEVEL 5, 35 HAVELOCK STREET, WEST PERTH, WA, 6005To:VICTORY GOLDFIELDS PTY LTD, C/- VICTORY GOLDFIELDS PTY LTD, PO BOX 557, SOUTH PERTH, WA, 6951, xxxxxxxxx@victorygold.com.auRECORDED:11:44:22 27 May 2020
Application to Amend628171Lodged:08:30 15 July 2021Amending:NameFrom:VICTORY GOLDFIELDS PTY LTDTo:VICTORY CUE PTY LTDRECORDED:08:30 15 July 2021
Application to Amend631531Lodged:11:34:54 31 August 2021Amending:Address (Including DTC Details)From:Principal Place of Business : VICTORY CUE PTY LTD, LEVEL 5, 35 HAVELOCK STREET, WEST PERTH, WA, 6005 and DTC :VICTORY CUE PTY LTD, C/- VICTORY GOLDFIELDS PTY LTD, PO BOX 557, SOUTH PERTH, WA, 6951, xxxxxxxxx@victorygold.com.auTo:Principal Place of Business : VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656 and DTC :VICTORY CUE PTY LTD, VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656RECORDED:11:34:54 31 August 2021
Application to Amend648811Lodged:09:28:36 10 May 2022Amending:Address (Including DTC Details)From:Principal Place of Business : VICTORY CUE PTY LTD, SUITE 1, 295 ROKEBY ROAD, SUBIACO, WA, 6008 and DTC :VICTORY CUE PTY LTD, VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656To:Principal Place of Business : VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656 and DTC :VICTORY CUE PTY LTD, C/- VCUE, SUITE 1, 295 ROKEBY ROAD, SUBIACO, WA, 6008, xxxx@victorygold.com.au, xxxxxxx743RECORDED:09:28:36 10 May 2022
Application to Amend648812Lodged:09:28:36 10 May 2022Amending:Address (Including DTC Details)From:VICTORY CUE PTY LTD, LEVEL 25, 108 ST GEORGES TCE, PERTH, WA, 6000, xxxxxxxxxxxxx@victorygold.com.au, xxxxx656To:VICTORY CUE PTY LTD, SUITE 1, 295 ROKEBY ROAD, SUBIACO, WA, 6008RECORDED:09:28:36 10 May 2022
Application to Amend680761Lodged:14:18:59 11 July 2023Amending:Address (Including DTC Details)From:VICTORY CUE PTY LTD, C/- VCUE, SUITE 1, 295 ROKEBY ROAD, SUBIACO, WA, 6008, xxxx@victorygold.com.au, xxxxxxx743To:VICTORY CUE PTY LTD, C/- VCUE, PO BOX 1112, KALAMUNDA, WA, 6926, xxxxxxx@datumpeg.com.au, xxxxxxx769RECORDED:14:18:59 11 July 2023
Application to Amend683100Lodged:14:25 07 August 2023From:BURNELL, Ryan EdwardAmending:NameTo:BURNELL, RyanREJECTED:14:25 07 August 2023
Application to Amend683463Lodged:13:55 11 August 2023Amending:Address (Including DTC Details)From:BURNELL, Ryan Edward, RYAN BURNELL, PO BOX 225, NORTH PERTH, WA, 6906, xxxxxxxxxxx@gmail.com, xxxxxxx842To:BURNELL, Ryan Edward, RYAN EDWARD BURNELL, PO BOX 225, NORTH PERTH, WA, 6906, xxxxxxxxxxx@gmail.com, xxxxxxx842RECORDED:13:55 11 August 2023
Forfeiture705009Initiated:28/05/2024 for non-compliance with rent requirementsRECORDED:10:30 28 May 2024FINALISED:Order by Minister on 01 October 2024 that M 20/33-I be Penalty ImposedNotice Issued:Regulation 50 Notice sent 28/05/2024 for non-compliance with rent requirements pursuant to Reg 109/Sec 82(1)- late payment of rent.Compliance Date:02/07/2024
Fine716101Fine in respect to:Forfeiture Process 705009Fine reason:Non-compliance with rent obligationsPenalty amount:$184.00Notification date:03/10/2024Due date:07/11/2024Pursuant to:Section 97(5)RECORDED:03 October 2024PAYMENT RECEIVED:07 October 2024FINALISED:09 October 2024Receipt Number:10680126Amount:$184.00Remaining balance:$0.00Receipt Number:10695573Amount:$184.00Remaining balance:-$184.00

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202616-Apr-2025 52839323593$4,061.20141.65000 HA12-Nov-1986 $4,061.20$0.00
Rental202524-Apr-2024 06-188288PERTH$3,692.00141.65000 HA12-Nov-1986 $3,692.00$0.00
Rental202423-Mar-2023 10340902$3,408.00141.65000 HA12-Nov-1986 $3,408.00$0.00
Rental202301-Apr-2022 10252007$3,124.00141.65000 HA12-Nov-1986 $3,124.00$0.00
Rental202201-Apr-2021 10190676$2,840.00141.65000 HA12-Nov-1986 $2,840.00$0.00
Rental202119-Apr-2020 10141261$2,811.60141.65000 HA12-Nov-1986 $2,811.60$0.00
Rental202013-Jun-2019 06-170843PERTH$2,655.40141.65000 HA12-Nov-1986 $2,655.40$0.00
Rental201915-Mar-2018 EFT$2,499.20141.65000 HA12-Nov-1986 $2,499.20$0.00
Rental201830-Mar-2017 72384167795$2,421.10141.65000 HA12-Nov-1986 $2,421.10$0.00
Rental201714-Mar-2016 06-152485PERTH$2,343.00141.65000 HA12-Nov-1986 $2,343.00$0.00
Rental201605-Mar-2015 06-143380PERTH$2,286.20141.65000 HA12-Nov-1986 $2,286.20$0.00
Rental201502-Apr-2014 06-134265PERTH$2,229.40141.65000 HA12-Nov-1986 $2,229.40$0.00
Rental201407-May-2013 MT-210010107054-EF$2,186.80141.65000 HA12-Nov-1986 $2,186.80$0.00
Rental201312-Apr-2012 06-108441PERTH$2,130.00141.65000 HA12-Nov-1986 $2,130.00$0.00
Rental201223-Mar-2011 91481PERTH$2,264.90141.65000 HA12-Nov-1986 $2,264.90$0.00
Rental201114-Apr-2010 77840PERTH$2,218.04141.65000 HA12-Nov-1986 $2,218.04$0.00
Rental201023-Jun-2009 66188PERTH$2,124.32141.65000 HA12-Nov-1986 $2,124.32$0.00
Rental200918-Apr-2008 8906MT. MAGNET$2,061.84141.65000 HA12-Nov-1986 $2,061.84$0.00
Rental200816-Mar-2007 6438MT. MAGNET$1,968.12141.65000 HA12-Nov-1986 $1,968.12$0.00
Rental200713-Apr-2006 4211MT. MAGNET$1,905.65141.65000 HA12-Nov-1986 $1,905.64$0.01
Rental200608-Aug-2005 14192PERTH$1,858.78141.65000 HA12-Nov-1986 $1,858.78$0.00
Rental200505-May-2004 71616PERTH$1,811.92141.65000 HA12-Nov-1986 $1,811.92$0.00
Rental200408-Apr-2003 59111PERTH$1,749.44141.65000 HA12-Nov-1986 $1,749.44$0.00
Rental200323-Apr-2002 47874PERTH$1,704.00141.65000 HA12-Nov-1986 $1,704.00$0.00
Rental200219-Apr-2001 35729PERTH$1,608.86141.65000 HA12-Nov-1986 $1,608.86$0.00
Rental200126-Jul-2000 25579PERTH$104.19141.65000 HA12-Nov-1986 $1,566.79$0.00
Rental200122-Mar-2000 21215PERTH$1,462.60
Rental200015-Apr-1999 10231PERTH$1,462.60141.65000 HA12-Nov-1986 $1,462.60$0.00
Rental199926-Mar-1998 176270PERTH$1,420.00141.65000 HA12-Nov-1986 $1,420.00$0.00
Rental199824-Mar-1997 159074PERTH$1,420.00141.65000 HA12-Nov-1986 $1,420.00$0.00
Rental199712-Mar-1996 140456PERTH$1,420.00141.65000 HA12-Nov-1986 $1,420.00$0.00
Rental199603-Apr-1995 123932PERTH$1,320.60141.65000 HA12-Nov-1986 $1,320.60$0.00
Rental199523-Mar-1994 105342PERTH$1,320.60141.65000 HA12-Nov-1986 $1,320.60$0.00
Rental199423-Mar-1993 87558PERTH$1,320.60141.65000 HA12-Nov-1986 $1,320.60$0.00
Rental199302-Apr-1992 72575PERTH$1,320.60141.65000 HA12-Nov-1986 $1,320.60$0.00
Rental199227-Mar-1991 55911PERTH$1,235.40141.65000 HA12-Nov-1986 $1,235.40$0.00
Rental199106-Apr-2017 06-159702PERTH$172.09141.65000 HA12-Nov-1986 $1,150.20$1.99
Rental199130-Mar-1990 1PERTH$980.10
Rental199005-Sep-1989 1PERTH$1,150.20141.65000 HA12-Nov-1986 $1,150.20$0.00
Rental198911-Mar-1988 1MT. MAGNET$1,093.40141.65000 HA12-Nov-1986 $1,093.40$0.00
Rental198814-Jul-1988 1MT. MAGNET$404.00141.65000 HA12-Nov-1986 $994.00$130.00
Rental198810-Apr-1987 1PERTH$720.00
Rental198724-Jul-1985 1MT. MAGNET$720.00141.65000 HA12-Nov-1986 $852.00-$132.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$14,200.00false
2025$14,200.00false
2024$14,200.0015-May-2024 $18,128.00$0.00$0.00$0.00$0.00$0.00$18,128.00false
2023$14,200.0016-May-2023 $18,131.00$10,257.00$0.00$0.00$7,474.00$400.00$0.00false
2022$14,200.0016-May-2022 $203,923.00$196,083.00$0.00$0.00$7,060.00$780.00$0.00false
2021$14,200.0014-May-2021 $17,118.00$0.00$0.00$0.00$0.00$0.00$17,118.00false
2020$14,200.0018-May-2020 $18,253.00$0.00$0.00$0.00$0.00$0.00$18,253.00false
2019$14,200.0012-Mar-2019 $71,055.00$0.00$0.00$0.00$0.00$0.00$71,055.00false
2018$14,200.0008-Mar-2018 $17,230.00$0.00$0.00$0.00$0.00$0.00$17,230.00false
2017$14,200.0010-Apr-2017 $15,868.00$0.00$0.00$0.00$0.00$0.00$15,868.00false
2016$14,200.0009-Mar-2016 $22,958.00$0.00$0.00$0.00$0.00$0.00$22,958.00false
2015$14,200.0026-Feb-2015 $17,983.00$0.00$0.00$0.00$0.00$0.00$17,983.00false
2014$14,200.0002-Apr-2014 $16,113.00$0.00$0.00$0.00$0.00$0.00$16,113.00false
2013$14,200.0028-Apr-2013 $17,756.00$0.00$0.00$0.00$0.00$0.00$17,756.00false
2012$14,200.0020-Mar-2012 $19,076.00$0.00$0.00$0.00$0.00$0.00$19,076.00false
2011$14,200.0020-Apr-2011 $15,444.00$0.00$0.00$0.00$0.00$0.00$15,444.00false
2010$14,200.0028-Apr-2010 $18,293.00$0.00$0.00$0.00$0.00$0.00$18,293.00false
2009$14,200.0014-May-2009 $21,824.00$0.00$0.00$0.00$0.00$0.00$21,824.00false
2008$14,200.0007-May-2008 $16,230.00$0.00$0.00$0.00$0.00$0.00$16,230.00false
2007$14,200.0016-May-2007 $15,337.00$0.00$0.00$0.00$0.00$0.00$15,337.00false
2006$14,200.0015-May-2006 $15,032.00$0.00$0.00$0.00$0.00$0.00$15,032.00false
2005$14,200.0025-May-2005 $14,588.00$0.00$0.00$0.00$0.00$0.00$14,588.00false
2004$14,200.0026-May-2004 $17,276.00$0.00$0.00$0.00$0.00$0.00$17,276.00false
2003$14,200.0019-May-2003 $17,609.00$12,900.00$0.00$0.00$2,609.00$2,100.00$0.00false
2002$14,200.0003-May-2002 $14,950.00$12,400.00$0.00$0.00$2,310.00$240.00$0.00false
2001$14,200.0004-May-2001 $25,669.00$0.00$0.00$0.00$0.00$0.00$0.00false
2000$14,200.0022-Mar-2000 $16,020.00$0.00$0.00$0.00$0.00$0.00$0.00false
1999$14,200.0014-Apr-1999 $25,400.00$0.00$0.00$0.00$0.00$0.00$0.00false
1998$14,200.0026-Mar-1998 $27,120.00$0.00$0.00$0.00$0.00$0.00$0.00false
1997$14,200.0020-Mar-1997 $34,800.00$0.00$0.00$0.00$0.00$0.00$0.00false
1996$14,200.0017-May-1996 $22,200.00$0.00$0.00$0.00$0.00$0.00$0.00false
1995$14,200.0003-Apr-1995 $21,047.00$0.00$0.00$0.00$0.00$0.00$0.00false
1994$14,200.0010-May-1994 $17,561.00$0.00$0.00$0.00$0.00$0.00$0.00false
1993$14,200.0023-Mar-1993 $22,570.00$0.00$0.00$0.00$0.00$0.00$0.00false
1992$14,200.0026-May-1992 $18,525.00$0.00$0.00$0.00$0.00$0.00$0.00false
1991$14,200.0022-Mar-1991 $9,258.008493322-Mar-1991 $4,942.00Granted10-May-1991 $0.00$0.00$0.00$0.00$0.00$0.00false
1990$14,200.0024-Apr-1990 $30,287.00$0.00$0.00$0.00$0.00$0.00$0.00false
1989$14,200.0027-Apr-1989 $20,406.00$0.00$0.00$0.00$0.00$0.00$0.00false
1988$14,200.0009-Sep-1988 $18,906.00$0.00$0.00$0.00$0.00$0.00$0.00false
1987$12,700.0024-Apr-1987 $13,700.00$0.00$0.00$0.00$0.00$0.00$0.00false

Bond

Bond NumberNameSuretyAmountBond DateStatusStatus DateTypeCeasedOther Affected Tenements
355846Bond - Security$10,000.00 (Inital)20-Sep-2010 Retired20-May-2013 Securitytrue
209623Bond - Security$10,000.00 (Inital)14-Jan-2005 Retired21-Sep-2010 Securitytrue
312116Bond Requirement$10,000.0004-Aug-2000 Finalised20-May-2013 true
PE5561Bond - Personal Surety$10,000.00 (Inital)30-Jun-2000 Retired16-Mar-2005 Personal Suretytrue

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
Tenement Application