Tenement: M09-159

View on Landtracker Maps (logon required)

Extracted from MTO on 20-Jun-2026 01:26, last changed 20-Jun-2026.

Tenement Summary

Identifier:M 09/159Type:Mining Lease
Status:LiveDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:1,479.50000 HA
Purposes:Term:21 Years
Markout:21-Dec-2014 11:45Received:23-Dec-2014 10:28
Commence:01-Jul-2015 Expiry:30-Jun-2036

Holders

Company NameSharesTotal Shares
YANGIBANA JUBILEE PTY LTD40100
WYLOO GASCOYNE PTY LTD60100

Applicants on Receival

Company NameSharesTotal Shares
GASCOYNE METALS PTY LTD70100
GTI RESOURCES LTD30100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 67Conversion 459743FinalisedE 09/1043Dead
Section 67Conversion 459743FinalisedE 09/1706Live
Section 67Conversion 452777RecordedE 09/1043Dead

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847001-Jun-2016 1,479.50000 HA

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.01-Jul-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.01-Jul-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.01-Jul-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.01-Jul-2015
51The Lessee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.01-Jul-2015
61The Lessee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Lease; or
  • registration of a transfer introducing a new Lessee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
01-Jul-2015
71The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Executive Director, Environment Division, DMP for his assessment and written approval prior to commencing any developmental or productive mining or construction activity.01-Jul-2015
81The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.02-Dec-2020
91Topsoil and vegetation to be removed ahead of mining operations and appropriately stockpiled for later respreading or immediately respread as rehabilitation progresses.02-Dec-2020
101All rubbish and waste will be appropriately managed and disposed.02-Dec-2020
111The Lessee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations.02-Dec-2020
121Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles.02-Dec-2020
131Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.02-Dec-2020
141All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.02-Dec-2020
151All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety.02-Dec-2020
161An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • March
02-Dec-2020
173A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Energy, Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2027
14-Apr-2025
172A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2024
15-Jan-2024 13-Apr-2025
171A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2023
02-Dec-2020 14-Jan-2024
182All mining operations approved by a Mining Proposal submitted on or after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
181All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
192All ground disturbance approved by a Mining Proposal submitted on or after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s.30-Nov-2021
191All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 17 October 2019 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 6920069.02-Dec-2020 29-Nov-2021
202No alteration or expansion of mining operations beyond the activities described within the Activity, and Key Mine Activity tables of the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety.30-Nov-2021
201No alteration or expansion of mining operations beyond the activities detailed in Table 2 and Table 3 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
212The Lessee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted on or after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
211The Lessee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
222Management of mine closure to be undertaken in accordance with the latest, relevant approved Mine Closure Plan.30-Nov-2021
221Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 83200) "Yangibana Rare Earths Project Mine Closure Plan Revision 8a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807024.02-Dec-2020 29-Nov-2021
232Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.30-Nov-2021
231Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.02-Dec-2020 29-Nov-2021
242Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted on or after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.30-Nov-2021
241Report any breach of environmental outcome or performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.02-Dec-2020 29-Nov-2021

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.01-Jul-2015
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.01-Jul-2015
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.01-Jul-2015
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.01-Jul-2015
51The Lessee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.01-Jul-2015
61The Lessee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Lease; or
  • registration of a transfer introducing a new Lessee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
01-Jul-2015
71The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Executive Director, Environment Division, DMP for his assessment and written approval prior to commencing any developmental or productive mining or construction activity.01-Jul-2015
81The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.02-Dec-2020
91Topsoil and vegetation to be removed ahead of mining operations and appropriately stockpiled for later respreading or immediately respread as rehabilitation progresses.02-Dec-2020
101All rubbish and waste will be appropriately managed and disposed.02-Dec-2020
111The Lessee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations.02-Dec-2020
121Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles.02-Dec-2020
131Placement of waste material must be such that the final footprint after rehabilitation will not be impacted upon by pit wall subsidence or be within the zone of pit instability to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.02-Dec-2020
141All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.02-Dec-2020
151All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety.02-Dec-2020
161An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • March
02-Dec-2020
173A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Energy, Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2027
14-Apr-2025
172A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2024
15-Jan-2024 13-Apr-2025
171A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2023
02-Dec-2020 14-Jan-2024
182All mining operations approved by a Mining Proposal submitted on or after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
181All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
192All ground disturbance approved by a Mining Proposal submitted on or after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s.30-Nov-2021
191All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 17 October 2019 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 6920069.02-Dec-2020 29-Nov-2021
202No alteration or expansion of mining operations beyond the activities described within the Activity, and Key Mine Activity tables of the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety.30-Nov-2021
201No alteration or expansion of mining operations beyond the activities detailed in Table 2 and Table 3 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
212The Lessee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted on or after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
211The Lessee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
222Management of mine closure to be undertaken in accordance with the latest, relevant approved Mine Closure Plan.30-Nov-2021
221Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 83200) "Yangibana Rare Earths Project Mine Closure Plan Revision 8a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807024.02-Dec-2020 29-Nov-2021
232Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.30-Nov-2021
231Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.02-Dec-2020 29-Nov-2021
242Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted on or after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.30-Nov-2021
241Report any breach of environmental outcome or performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.02-Dec-2020 29-Nov-2021

Dealings

TypeNumberDetails
Caveat380961Primary Tenements:Lodged against E 09/1043 is now effective against this tenement.Pursuant To:S122CCaveat Type:Consent CaveatCaveat Number:380961,Caveator:ARTEMIS RESOURCES LTDShares Caveated:60/100 shares GASCOYNE METALS PTY LTDRECORDED:00:00 01 July 2015WITHDRAWN:13:17:19 12 September 2019
Application to Amend461577Lodged:13:37:16 03 February 2015Amending:AreaFrom:1,466.00000 HATo:1,469.82810 HARECORDED:13:37:16 03 February 2015
Transfer460296Lodged:15:40 22 April 2015Related Transfer(s):460301Primary Tenement:E 09/1043, E 09/1706Holder details updated pursuant to:S67From:GTI RESOURCES LTD 30/100 sharesTo:MOJITO RESOURCES LIMITED 30/100 sharesREGISTERED:15:40 22 April 2015
Application to Amend493247Lodged:15:15 01 September 2016Amending:Address (Including DTC Details)From:Principal Place of Business : MOJITO RESOURCES LIMITED, C/- GILBERT & TOBIN, 1202 HAY STREET, WEST PERTH, WA, 6005 and DTC :MOJITO RESOURCES LIMITED, C/- GILBERT & TOBIN, PO BOX 454, WEST PERTH, WA, 6872To:Principal Place of Business : MOJITO RESOURCES LIMITED, SAME AS CORRESPONDENCE and DTC :MOJITO RESOURCES LIMITED, C/- RARE EARTH MINERALS PLC, SUITE 3B, PRINCES HOUSE, 38 JERMYN STREET, LONDON, SW1Y 6DN, ENGLANDRECORDED:15:15 01 September 2016
Application to Amend526837Lodged:14:50:57 29 March 2018Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE METALS PTY LTD, SAME AS CORRESPONDENCE and DTC :GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :GASCOYNE METALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:14:50:57 29 March 2018
Withdrawal of Dealing562880Lodged:13:17:19 12 September 2019In respect to:Caveat 380961RECORDED:13:17:19 12 September 2019
Extension of Time631282Lodged:14:46:14 26 August 2021Type:Form 5RECORDED:14:46:14 26 August 2021APPROVED:09:37:35 27 August 2021Time to lodge extended to 13 September 2021
Application to Amend673176Lodged:15:24:05 12 April 2023Amending:Address (Including DTC Details)From:Principal Place of Business : YANGIBANA PTY LTD, LEVEL 3, 5 MILL STREET, PERTH, WA, 6000 and DTC :YANGIBANA PTY LTD, YANGIBANA PTY LTD, LEVEL 3, 5 MILL STREET, PERTH, WA, 6000To:Principal Place of Business : YANGIBANA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400 and DTC :YANGIBANA PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400RECORDED:15:24:05 12 April 2023
Application to Amend734926Lodged:15:17:42 03 June 2025Amending:NameFrom:YANGIBANA PTY LTDTo:YANGIBANA JUBILEE PTY LTDRECORDED:15:17:42 03 June 2025

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202705-Jun-2026 11112782$43,364.001,479.50000 HA31-May-2016 $44,548.00-$1,184.00
Rental202618-Jul-2025 10868063$43,364.001,479.50000 HA31-May-2016 $43,364.00$0.00
Rental202529-Jul-2024 10628485$3,848.001,479.50000 HA31-May-2016 $42,328.00$0.00
Rental202501-Jul-2024 10607013$38,480.00
Rental202420-Dec-2023 (REFUND) FIL-43119$38,480.001,479.50000 HA31-May-2016 $38,480.00$0.00
Rental202424-Jul-2023 10387205$38,480.00
Rental202411-Jul-2023 10382212$38,480.00
Rental202312-Jul-2022 10275076$35,520.001,479.50000 HA31-May-2016 $35,520.00$0.00
Rental202228-Jul-2021 10209835$32,560.001,479.50000 HA31-May-2016 $32,560.00$0.00
Rental202128-Jul-2020 10155904$29,600.001,479.50000 HA31-May-2016 $29,600.00$0.00
Rental202005-Sep-2019 10113486$1,628.001,479.50000 HA31-May-2016 $29,304.00$0.00
Rental202002-Jul-2019 10103441$27,676.00
Rental201931-Jul-2018 9587467623$27,676.001,479.50000 HA31-May-2016 $27,676.00$0.00
Rental201822-Nov-2017 78779945808$176.001,479.50000 HA31-May-2016 $26,048.00$0.00
Rental201811-Jul-2017 8498771719$25,872.00
Rental201722-Nov-2017 78779945808$170.501,479.50000 HA31-May-2016 $25,234.00$0.00
Rental201721-Jun-2016 MT-210010639206-DD$25,063.50
Rental201622-Nov-2017 78779945808$161.001,479.50000 HA31-May-2016 $23,828.00$0.00
Rental201620-Jan-2015 06-142236PERTH$64.40
Rental201623-Dec-2014 435713597975$23,602.60

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$148,000.00false
2025$148,000.0022-Aug-2025 $159,874.00$23,449.00$0.00$0.00$106,825.00$29,600.00$0.00false
2024$148,000.0022-Aug-2024 $217,195.00$96,092.00$0.00$0.00$91,503.00$29,600.00$0.00false
2023$148,000.0025-Aug-2023 $209,819.00$96,092.00$0.00$0.00$84,127.00$29,600.00$0.00false
2022$148,000.0025-Aug-2022 $201,294.00$127,045.00$0.00$0.00$59,449.00$14,800.00$0.00false
2021$148,000.0030-Aug-2021 $72,005.0063139627-Aug-2021 $148,000.00Granted08-Oct-2021 $7,105.00$0.00$0.00$50,100.00$14,800.00$0.00false
2020$148,000.0028-Aug-2020 $27,595.0058505528-Aug-2020 $148,000.00Granted11-Jan-2021 $6,044.00$0.00$0.00$21,270.00$281.00$0.00false
2019$148,000.0029-Aug-2019 $209,880.00$161,480.00$0.00$0.00$45,900.00$2,500.00$0.00false
2018$148,000.0029-Aug-2018 $177,902.00$100,946.00$0.00$3,214.00$44,142.00$29,600.00$0.00false
2017$148,000.0023-Aug-2017 $2,730,309.35$2,217,972.09$0.00$40,648.53$16,637.17$455,051.56$0.00false
2016$147,084.0025-Aug-2016 $1,243,303.59$966,422.80$0.00$5,173.81$64,489.72$207,217.26$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
04-Feb-2015 Tenement ApplicationRTN Procedure : Native Title Cleared - Other ReasonRTN Procedure2015-02-252015-06-251,469.83 HA235147S1161332E165km SW'ly of Paraburdoo14GeraldtonYamatji Marlpa Aboriginal Corporation