1 | 1 | Survey. | 09-Dec-2004 | |
2 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 09-Dec-2004 | |
3 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 09-Dec-2004 | |
4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Dec-2004 | |
5 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Dec-2004 | |
6 | 2 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 12-Aug-2005 | |
6 | 1 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the State Mining Engineer for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 09-Dec-2004 | 11-Aug-2005 |
7 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 09-Dec-2004 | |
Cond # | Ver | Text | Start | End |
1 | 1 | Survey. | 09-Dec-2004 | |
2 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 09-Dec-2004 | |
3 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 09-Dec-2004 | |
4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Dec-2004 | |
5 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Dec-2004 | |
6 | 2 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 12-Aug-2005 | |
6 | 1 | The lessee submitting a plan of proposed operations and measures to safeguard the environment to the State Mining Engineer for his assessment and written approval prior to commencing any developmental or productive mining or construction activity. | 09-Dec-2004 | 11-Aug-2005 |
7 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 09-Dec-2004 | |
Type | Number | Details |
Application to Amend | KR33/034 | Lodged 11:10:00 AM on 18 Mar 2004 amending the name of the applicantsREJECTED 11:10 AM 18 Mar 2004 |
Application to Amend | KR33/034 | Relodged 9:30:00 AM on 14 Apr 2004 amending one of the applicants from The Martin Trust to Joseph David GLUCINA.REGISTERED 9:30 AM 14 Apr 2004 |
Application to Amend | 817H/067 | Lodged 12:55 PM on 29 Jan 2007 amending address of Anthony Warren Slater to: ' PO Box 890 Innaloo WA 6018".RECORDED 12:55 PM 29 Jan 2007 |
Application to Amend | 331052 | Lodged:15:55 25 September 2009Amending:AddressFrom:SLATER, Anthony Warren, C/-, PO BOX 890, INNALOO, WA, 6018To:SLATER, Anthony Warren, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638 PERTH BUSINESS CENTRE, PERTH, WA, 6849RECORDED:15:55 25 September 2009 |
Application to Amend | 355237 | Lodged:16:05 10 September 2010Amending:AddressFrom:SLATER, Anthony Warren, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:SLATER, Anthony Warren, PO BOX 890, INNALOO, WA, 6018RECORDED:16:05 10 September 2010 |
Application to Amend | 412293 | Lodged:14:55 30 November 2012Amending:AddressFrom:SLATER, Anthony Warren, C/-, PO BOX 890, INNALOO, WA, 6018To:SLATER, Anthony Warren, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008RECORDED:14:55 30 November 2012 |
Application to Amend | 435028 | Lodged:13:15:19 13 November 2013Amending:AddressFrom:GLUCINA, Joseph David, C/-, 63 MILLS ROAD WEST, GOSNELLS, WA, 6110To:GLUCINA, Joseph David, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008RECORDED:13:15:19 13 November 2013 |
Application to Amend | 476396 | Lodged:09:43:55 26 October 2015Amending:AddressFrom:YARRI MINING PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:YARRI MINING PTY LTD, SUITE G5, 49 MELVILLE PDE, SOUTH PERTH, WA, 6151RECORDED:09:43:55 26 October 2015 |
Application to Amend | 509757 | Lodged:15:45:38 04 July 2017Amending:Address (Including DTC Details)From:YARRI MINING PTY LTD, SUITE G5, 49 MELVILLE PDE, SOUTH PERTH, WA, 6151To:YARRI MINING PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxx866RECORDED:15:45:38 04 July 2017 |
Extension of Time | 524532 | Lodged:11:34:51 27 February 2018Type:Stat DecRECORDED:11:34:51 27 February 2018APPROVED:15:06:06 27 February 2018Time extended to 27 March 2018 |
Forfeiture | 565987 | Initiated:04/11/2019 for non-compliance with survey provisionsRECORDED:12:32:07 04 November 2019Notice Issued:Regulation 50 Notice sent 04/11/2019 for non-compliance with survey provisions pursuant to Sec 80.Compliance Date:09/12/2019FINALISED:Order by Minister on 13 January 2020 that M 04/407 be No Penalty Imposed |
Caveat | 566357 | Lodged:15:48 08 November 2019Caveat Type:Absolute CaveatCaveator:ASHBURTON MINERAL RESOURCES PTY LTDShares Caveated:100/100 shares YARRI MINING PTY LTDRECORDED:15:48 08 November 2019WITHDRAWN:10:48:12 04 February 2021 |
Withdrawal of Dealing | 595311 | Lodged:10:48:12 04 February 2021In respect to:Caveat 566357RECORDED:10:48:12 04 February 2021 |
Application to Amend | 699130 | Lodged:12:18:33 19 March 2024Amending:Address (Including DTC Details)From:Principal Place of Business : YARRI MINING PTY LTD, SAME AS CORRESPONDENCE and DTC :YARRI MINING PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxx866To:Principal Place of Business : YARRI MINING PTY LTD, PO BOX 1525, SOUTH PERTH, WA, 6951, xxxxxxxxxxx@gmail.com, xxxxxxxx062 and DTC :YARRI MINING PTY LTD, YARRI MINING PTY LTD, PO BOX 1525, SOUTH PERTH, WA, 6951, xxxxxxxxxxx@gmail.com, xxxxxxxx062RECORDED:12:18:33 19 March 2024 |