Extracted from MTO on 20-Jun-2026 01:32,
last changed 17-Jun-2026.
| # | Ver | Text | Start | End |
| 1 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 27-Oct-2017 | |
| 2 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 27-Oct-2017 | |
| 3 | 1 | The rights of ingress to and egress from Miscellaneous Licence 09/69 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 27-Oct-2017 | |
| 4 | 1 | To properly maintain the installations as directed by the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS). | 27-Oct-2017 | |
| 5 | 1 | All topsoil that may be removed ahead of pipelaying operations to be stockpiled for replacement in accordance with the directions of the Environmental Officer, DMIRS. | 27-Oct-2017 | |
| 6 | 1 | Ingress and egress of pastoralists and tenement holders to be preserved by the construction of vehicular access crossings over any pipeline constructed pursuant to this licence. | 27-Oct-2017 | |
| 7 | 1 | The licensee shall keep clear such area around any powerline located within the licence area of any dry or other growth which has the potential to be a fire risk. | 27-Oct-2017 | |
| 8 | 1 | The electrical installation shall meet the requirements of relevant on-site conditions and be carried out to the satisfaction of the Special Inspector of Mines - Electrical, DMIRS. | 27-Oct-2017 | |
| 9 | 1 | The aerodrome to be constructed using proper materials to suit the purpose for which it is to be used. | 27-Oct-2017 | |
| 10 | 1 | Wherever any part of a road intersects an existing fence, the holder shall where necessary construct a gate or livestock grid having such dimensions and be constructed of such materials and be of such standard as agreed with the pastoralist or as determined by the Environmental Officer, DMIRS. | 27-Oct-2017 | |
| 11 | 1 | The road to be constructed using proper materials to suit the purpose for which it is being constructed, and further that it be constructed in a workman like manner and further that it be constructed to the satisfaction of the Environmental Officer, DMIRS. | 27-Oct-2017 | |
| 12 | 1 | The holder shall maintain the road from time to time as shall be required to ensure that it is safe for the purpose that it is constructed. | 27-Oct-2017 | |
| 13 | 1 | The area of the miscellaneous licence to be reduced as soon as practicable after construction, to a minimum for the safe maintenance and operation of the licence purposes. | 27-Oct-2017 | |
| 14 | 1 | All mining operations to be managed to meet the environmental outcomes, as measured by the performance criteria, stated in table 22 of the Mining Proposal (Reg ID 72489) "Mining Proposal Revised Minor or Preliminary Works, Access Road and Accommodation" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-72489 as Doc ID 5660176. | 26-Apr-2018 | 02-Dec-2020 |
| 15 | 1 | Management of mine closure to be undertaken in accordance with the Mine Closure Plan (RegID 72489) "Yangibana Rare Earths Project Preliminary Mine Closure Plan" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File Number EARS-MPMCP-72489 as Doc ID 5660193. | 26-Apr-2018 | 02-Dec-2020 |
| 16 | 1 | The Licensee to ensure adequate environmental monitoring and analysis is undertaken to allow demonstrate the performance criteria stated in table 22 of the Mining Proposal (Reg ID 72489) "Mining Proposal Revised Minor or Preliminary Works, Access Road and Accommodation" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-72489 as Doc ID 5660176. | 26-Apr-2018 | 02-Dec-2020 |
| 17 | 1 | The Licensee will report any unplanned incident that will cause, or is likely to cause, injury to the land, including any relevant breach of environmental outcome or performance criteria in the approved mining proposal, to the Executive Director, Resources and Environmental Compliance, DMIRS, within 24 hours of the Licensee becoming aware of the occurrence of the incident.
| 26-Apr-2018 | 02-Dec-2020 |
| 18 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 26-Apr-2018 | |
| 19 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 26-Apr-2018 | |
| 20 | 2 | All rubbish and waste will be appropriately managed and disposed. | 14-Apr-2025 | |
| 20 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 26-Apr-2018 | 13-Apr-2025 |
| 21 | 2 | The Licensee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations. | 14-Apr-2025 | |
| 21 | 1 | The Licensee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 26-Apr-2018 | 13-Apr-2025 |
| 22 | 1 | Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles. | 26-Apr-2018 | |
| 23 | 1 | The Licensee submitting to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, DMIRS, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 26-Apr-2018 | 14-Jun-2018 |
| 24 | 1 | All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, DMIRS. | 26-Apr-2018 | |
| 25 | 4 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Energy, Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 14-Apr-2025 | |
| 25 | 3 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 15-Jan-2024 | 13-Apr-2025 |
| 25 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 02-Dec-2020 | 14-Jan-2024 |
| 25 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMIRS. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMIRS's website:
| 26-Apr-2018 | 01-Dec-2020 |
| 26 | 1 | The Licensee submitting to the Executive Director, Resource and Environmental Compliance Division, DMIRS, an Annual Environmental Report (AER) outlining the project operations during the previous 12 months, and the results of monitoring undertaken to demonstrate the level of achievementof the performance criteria from the approved Mining Proposal and the completion criteria from the approved Mine Closure Plan. The AER to be submitted each year in:
| 14-Jun-2018 | 14-Apr-2025 |
| 27 | 3 | All mining operations approved by a Mining Proposal submitted on or after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s. | 30-Nov-2021 | |
| 27 | 2 | All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026. | 02-Dec-2020 | 29-Nov-2021 |
| 27 | 1 | All mining operations to be managed to meet the environmental outcomes, as measured by the performance criteria, stated in table table 22 of the Mining Proposal (Reg ID 73946) "Yangibana Rare Earths Mining Proposal Minor and Preliminary Works: Stage 1 and Stage 2 Rev 4" dated 28 June 2018 signed by Hannes Zandberg, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 5856403 | 13-Jul-2018 | 01-Dec-2020 |
| 28 | 3 | Management of mine closure to be undertaken in accordance with the latest, relevant approved Mine Closure Plan. | 30-Nov-2021 | |
| 28 | 2 | Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 83200) "Yangibana Rare Earths Project Mine Closure Plan Revision 8" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7704683. | 02-Dec-2020 | 29-Nov-2021 |
| 28 | 1 | Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 73946) "Yangibana Rare Earths Project Preliminary Mine Closure Plan Rev 5" dated 28 June 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 5856409 | 13-Jul-2018 | 01-Dec-2020 |
| 29 | 2 | The Licensee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026. | 02-Dec-2020 | 14-Apr-2025 |
| 29 | 1 | The Lessee to ensure adequate environmental monitoring and analysis is undertaken to allow demonstrate the performance criteria stated in table 22 of the Mining Proposal (Reg ID 73946) "Yangibana Rare Earths Mining Proposal Minor and Preliminary Works: Stage 1 and Stage 2 Rev 4" dated 28 June 2018 signed by Hannes Zandberg, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 5856403 | 13-Jul-2018 | 01-Dec-2020 |
| 30 | 2 | All ground disturbance approved by a Mining Proposal submitted on or after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s. | 30-Nov-2021 | |
| 30 | 1 | All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 17 October 2019 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 6920069. | 02-Dec-2020 | 29-Nov-2021 |
| 31 | 2 | No alteration or expansion of mining operations beyond the activities described within the Activity, and Key Mine Activity tables of the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. | 30-Nov-2021 | |
| 31 | 1 | No alteration or expansion of mining operations beyond the activities detailed in Table 2 and Table 3 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026. | 02-Dec-2020 | 29-Nov-2021 |
| 32 | 2 | Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident. | 30-Nov-2021 | |
| 32 | 1 | Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident. | 02-Dec-2020 | 29-Nov-2021 |
| 33 | 2 | Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted on or after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach. | 30-Nov-2021 | |
| 33 | 1 | Report any breach of environmental outcome or performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach. | 02-Dec-2020 | 29-Nov-2021 |
| 34 | 1 | All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety. | 02-Dec-2020 | |
| 35 | 1 | The Licensee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted on or after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s. | 30-Nov-2021 | |
| 36 | 1 | An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 14-Apr-2025 | |
| Cond # | Ver | Text | Start | End |
| 1 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 27-Oct-2017 | |
| 2 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 27-Oct-2017 | |
| 3 | 1 | The rights of ingress to and egress from Miscellaneous Licence 09/69 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 27-Oct-2017 | |
| 4 | 1 | To properly maintain the installations as directed by the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS). | 27-Oct-2017 | |
| 5 | 1 | All topsoil that may be removed ahead of pipelaying operations to be stockpiled for replacement in accordance with the directions of the Environmental Officer, DMIRS. | 27-Oct-2017 | |
| 6 | 1 | Ingress and egress of pastoralists and tenement holders to be preserved by the construction of vehicular access crossings over any pipeline constructed pursuant to this licence. | 27-Oct-2017 | |
| 7 | 1 | The licensee shall keep clear such area around any powerline located within the licence area of any dry or other growth which has the potential to be a fire risk. | 27-Oct-2017 | |
| 8 | 1 | The electrical installation shall meet the requirements of relevant on-site conditions and be carried out to the satisfaction of the Special Inspector of Mines - Electrical, DMIRS. | 27-Oct-2017 | |
| 9 | 1 | The aerodrome to be constructed using proper materials to suit the purpose for which it is to be used. | 27-Oct-2017 | |
| 10 | 1 | Wherever any part of a road intersects an existing fence, the holder shall where necessary construct a gate or livestock grid having such dimensions and be constructed of such materials and be of such standard as agreed with the pastoralist or as determined by the Environmental Officer, DMIRS. | 27-Oct-2017 | |
| 11 | 1 | The road to be constructed using proper materials to suit the purpose for which it is being constructed, and further that it be constructed in a workman like manner and further that it be constructed to the satisfaction of the Environmental Officer, DMIRS. | 27-Oct-2017 | |
| 12 | 1 | The holder shall maintain the road from time to time as shall be required to ensure that it is safe for the purpose that it is constructed. | 27-Oct-2017 | |
| 13 | 1 | The area of the miscellaneous licence to be reduced as soon as practicable after construction, to a minimum for the safe maintenance and operation of the licence purposes. | 27-Oct-2017 | |
| 14 | 1 | All mining operations to be managed to meet the environmental outcomes, as measured by the performance criteria, stated in table 22 of the Mining Proposal (Reg ID 72489) "Mining Proposal Revised Minor or Preliminary Works, Access Road and Accommodation" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-72489 as Doc ID 5660176. | 26-Apr-2018 | 02-Dec-2020 |
| 15 | 1 | Management of mine closure to be undertaken in accordance with the Mine Closure Plan (RegID 72489) "Yangibana Rare Earths Project Preliminary Mine Closure Plan" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File Number EARS-MPMCP-72489 as Doc ID 5660193. | 26-Apr-2018 | 02-Dec-2020 |
| 16 | 1 | The Licensee to ensure adequate environmental monitoring and analysis is undertaken to allow demonstrate the performance criteria stated in table 22 of the Mining Proposal (Reg ID 72489) "Mining Proposal Revised Minor or Preliminary Works, Access Road and Accommodation" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-72489 as Doc ID 5660176. | 26-Apr-2018 | 02-Dec-2020 |
| 17 | 1 | The Licensee will report any unplanned incident that will cause, or is likely to cause, injury to the land, including any relevant breach of environmental outcome or performance criteria in the approved mining proposal, to the Executive Director, Resources and Environmental Compliance, DMIRS, within 24 hours of the Licensee becoming aware of the occurrence of the incident.
| 26-Apr-2018 | 02-Dec-2020 |
| 18 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 26-Apr-2018 | |
| 19 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 26-Apr-2018 | |
| 20 | 2 | All rubbish and waste will be appropriately managed and disposed. | 14-Apr-2025 | |
| 20 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 26-Apr-2018 | 13-Apr-2025 |
| 21 | 2 | The Licensee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations. | 14-Apr-2025 | |
| 21 | 1 | The Licensee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities. | 26-Apr-2018 | 13-Apr-2025 |
| 22 | 1 | Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles. | 26-Apr-2018 | |
| 23 | 1 | The Licensee submitting to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, DMIRS, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 26-Apr-2018 | 14-Jun-2018 |
| 24 | 1 | All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, DMIRS. | 26-Apr-2018 | |
| 25 | 4 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Energy, Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 14-Apr-2025 | |
| 25 | 3 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 15-Jan-2024 | 13-Apr-2025 |
| 25 | 2 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
| 02-Dec-2020 | 14-Jan-2024 |
| 25 | 1 | A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMIRS. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMIRS's website:
| 26-Apr-2018 | 01-Dec-2020 |
| 26 | 1 | The Licensee submitting to the Executive Director, Resource and Environmental Compliance Division, DMIRS, an Annual Environmental Report (AER) outlining the project operations during the previous 12 months, and the results of monitoring undertaken to demonstrate the level of achievementof the performance criteria from the approved Mining Proposal and the completion criteria from the approved Mine Closure Plan. The AER to be submitted each year in:
| 14-Jun-2018 | 14-Apr-2025 |
| 27 | 3 | All mining operations approved by a Mining Proposal submitted on or after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s. | 30-Nov-2021 | |
| 27 | 2 | All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026. | 02-Dec-2020 | 29-Nov-2021 |
| 27 | 1 | All mining operations to be managed to meet the environmental outcomes, as measured by the performance criteria, stated in table table 22 of the Mining Proposal (Reg ID 73946) "Yangibana Rare Earths Mining Proposal Minor and Preliminary Works: Stage 1 and Stage 2 Rev 4" dated 28 June 2018 signed by Hannes Zandberg, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 5856403 | 13-Jul-2018 | 01-Dec-2020 |
| 28 | 3 | Management of mine closure to be undertaken in accordance with the latest, relevant approved Mine Closure Plan. | 30-Nov-2021 | |
| 28 | 2 | Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 83200) "Yangibana Rare Earths Project Mine Closure Plan Revision 8" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7704683. | 02-Dec-2020 | 29-Nov-2021 |
| 28 | 1 | Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 73946) "Yangibana Rare Earths Project Preliminary Mine Closure Plan Rev 5" dated 28 June 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 5856409 | 13-Jul-2018 | 01-Dec-2020 |
| 29 | 2 | The Licensee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026. | 02-Dec-2020 | 14-Apr-2025 |
| 29 | 1 | The Lessee to ensure adequate environmental monitoring and analysis is undertaken to allow demonstrate the performance criteria stated in table 22 of the Mining Proposal (Reg ID 73946) "Yangibana Rare Earths Mining Proposal Minor and Preliminary Works: Stage 1 and Stage 2 Rev 4" dated 28 June 2018 signed by Hannes Zandberg, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 5856403 | 13-Jul-2018 | 01-Dec-2020 |
| 30 | 2 | All ground disturbance approved by a Mining Proposal submitted on or after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s. | 30-Nov-2021 | |
| 30 | 1 | All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 17 October 2019 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 6920069. | 02-Dec-2020 | 29-Nov-2021 |
| 31 | 2 | No alteration or expansion of mining operations beyond the activities described within the Activity, and Key Mine Activity tables of the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. | 30-Nov-2021 | |
| 31 | 1 | No alteration or expansion of mining operations beyond the activities detailed in Table 2 and Table 3 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026. | 02-Dec-2020 | 29-Nov-2021 |
| 32 | 2 | Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident. | 30-Nov-2021 | |
| 32 | 1 | Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident. | 02-Dec-2020 | 29-Nov-2021 |
| 33 | 2 | Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted on or after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach. | 30-Nov-2021 | |
| 33 | 1 | Report any breach of environmental outcome or performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach. | 02-Dec-2020 | 29-Nov-2021 |
| 34 | 1 | All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety. | 02-Dec-2020 | |
| 35 | 1 | The Licensee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted on or after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s. | 30-Nov-2021 | |
| 36 | 1 | An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
| 14-Apr-2025 | |