Tenement: L09-80

View on Landtracker Maps (logon required)

Extracted from MTO on 20-Jun-2026 01:32, last changed 17-Jun-2026.

Tenement Summary

Identifier:L 09/80Type:Miscellaneous Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:90.13350 HA
Purposes:a bore, a bore field, a communications facility, a meteorological station, a minesite accommodation facility, a minesite administration facility, a pipeline, a power generation and transmission facility, a road, an aerodromeTerm:21 Years
Markout:Received:15-Aug-2016 15:02
Commence:27-Oct-2017 Expiry:26-Oct-2038

Holders

Company NameSharesTotal Shares
YANGIBANA JUBILEE PTY LTD40100
WYLOO GASCOYNE PTY LTD60100

Applicants on Receival

Company NameSharesTotal Shares
GASCOYNE METALS PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847015-Aug-2016 90.13350 HA

Conditions

#VerTextStartEnd
11The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.27-Oct-2017
21The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
27-Oct-2017
31The rights of ingress to and egress from Miscellaneous Licence 09/69 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.27-Oct-2017
41To properly maintain the installations as directed by the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS).27-Oct-2017
51All topsoil that may be removed ahead of pipelaying operations to be stockpiled for replacement in accordance with the directions of the Environmental Officer, DMIRS.27-Oct-2017
61Ingress and egress of pastoralists and tenement holders to be preserved by the construction of vehicular access crossings over any pipeline constructed pursuant to this licence.27-Oct-2017
71The licensee shall keep clear such area around any powerline located within the licence area of any dry or other growth which has the potential to be a fire risk.27-Oct-2017
81The electrical installation shall meet the requirements of relevant on-site conditions and be carried out to the satisfaction of the Special Inspector of Mines - Electrical, DMIRS.27-Oct-2017
91The aerodrome to be constructed using proper materials to suit the purpose for which it is to be used.27-Oct-2017
101Wherever any part of a road intersects an existing fence, the holder shall where necessary construct a gate or livestock grid having such dimensions and be constructed of such materials and be of such standard as agreed with the pastoralist or as determined by the Environmental Officer, DMIRS.27-Oct-2017
111The road to be constructed using proper materials to suit the purpose for which it is being constructed, and further that it be constructed in a workman like manner and further that it be constructed to the satisfaction of the Environmental Officer, DMIRS.27-Oct-2017
121The holder shall maintain the road from time to time as shall be required to ensure that it is safe for the purpose that it is constructed.27-Oct-2017
131The area of the miscellaneous licence to be reduced as soon as practicable after construction, to a minimum for the safe maintenance and operation of the licence purposes.27-Oct-2017
141All mining operations to be managed to meet the environmental outcomes, as measured by the performance criteria, stated in table 22 of the Mining Proposal (Reg ID 72489) "Mining Proposal Revised Minor or Preliminary Works, Access Road and Accommodation" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-72489 as Doc ID 5660176.26-Apr-2018 02-Dec-2020
151Management of mine closure to be undertaken in accordance with the Mine Closure Plan (RegID 72489) "Yangibana Rare Earths Project Preliminary Mine Closure Plan" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File Number EARS-MPMCP-72489 as Doc ID 5660193.26-Apr-2018 02-Dec-2020
161

The Licensee to ensure adequate environmental monitoring and analysis is undertaken to allow demonstrate the performance criteria stated in table 22 of the Mining Proposal (Reg ID 72489) "Mining Proposal Revised Minor or Preliminary Works, Access Road and Accommodation" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-72489 as Doc ID 5660176.

26-Apr-2018 02-Dec-2020
171The Licensee will report any unplanned incident that will cause, or is likely to cause, injury to the land, including any relevant breach of environmental outcome or performance criteria in the approved mining proposal, to the Executive Director, Resources and Environmental Compliance, DMIRS, within 24 hours of the Licensee becoming aware of the occurrence of the incident.
 
26-Apr-2018 02-Dec-2020
181The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.26-Apr-2018
191All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.26-Apr-2018
202All rubbish and waste will be appropriately managed and disposed.14-Apr-2025
201All rubbish and scrap is to be progressively disposed of in a suitable manner.26-Apr-2018 13-Apr-2025
212The Licensee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations.14-Apr-2025
211The Licensee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities.26-Apr-2018 13-Apr-2025
221Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles.26-Apr-2018
231The Licensee submitting to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, DMIRS, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • March
26-Apr-2018 14-Jun-2018
241All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, DMIRS.26-Apr-2018
254A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Energy, Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2027
14-Apr-2025
253A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2024
15-Jan-2024 13-Apr-2025
252A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2023
02-Dec-2020 14-Jan-2024
251A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMIRS. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMIRS's website:
  • 2021
26-Apr-2018 01-Dec-2020
261The Licensee submitting to the Executive Director, Resource and Environmental Compliance Division, DMIRS, an Annual Environmental Report (AER) outlining the project operations during the previous 12 months, and the results of monitoring undertaken to demonstrate the level of achievementof the performance criteria from the approved Mining Proposal and the completion criteria from the approved Mine Closure Plan. The AER to be submitted each year in:
  • March
14-Jun-2018 14-Apr-2025
273All mining operations approved by a Mining Proposal submitted on or after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
272All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
271All mining operations to be managed to meet the environmental outcomes, as measured by the performance criteria, stated in table table 22 of the Mining Proposal (Reg ID 73946) "Yangibana Rare Earths Mining Proposal Minor and Preliminary Works: Stage 1 and Stage 2 Rev 4" dated 28 June 2018 signed by Hannes Zandberg, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 585640313-Jul-2018 01-Dec-2020
283Management of mine closure to be undertaken in accordance with the latest, relevant approved Mine Closure Plan.30-Nov-2021
282Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 83200) "Yangibana Rare Earths Project Mine Closure Plan Revision 8" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7704683.02-Dec-2020 29-Nov-2021
281Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 73946) "Yangibana Rare Earths Project Preliminary Mine Closure Plan Rev 5" dated 28 June 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 585640913-Jul-2018 01-Dec-2020
292The Licensee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 14-Apr-2025
291The Lessee to ensure adequate environmental monitoring and analysis is undertaken to allow demonstrate the performance criteria stated in table 22 of the Mining Proposal (Reg ID 73946) "Yangibana Rare Earths Mining Proposal Minor and Preliminary Works: Stage 1 and Stage 2 Rev 4" dated 28 June 2018 signed by Hannes Zandberg, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 585640313-Jul-2018 01-Dec-2020
302All ground disturbance approved by a Mining Proposal submitted on or after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s.30-Nov-2021
301All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 17 October 2019 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 6920069.02-Dec-2020 29-Nov-2021
312No alteration or expansion of mining operations beyond the activities described within the Activity, and Key Mine Activity tables of the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety.30-Nov-2021
311No alteration or expansion of mining operations beyond the activities detailed in Table 2 and Table 3 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
322Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.30-Nov-2021
321Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.02-Dec-2020 29-Nov-2021
332Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted on or after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.30-Nov-2021
331Report any breach of environmental outcome or performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.02-Dec-2020 29-Nov-2021
341All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.02-Dec-2020
351The Licensee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted on or after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
361An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • March
14-Apr-2025

Endorsements

Cond #VerTextStartEnd
11The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.27-Oct-2017
21The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
27-Oct-2017
31The rights of ingress to and egress from Miscellaneous Licence 09/69 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.27-Oct-2017
41To properly maintain the installations as directed by the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS).27-Oct-2017
51All topsoil that may be removed ahead of pipelaying operations to be stockpiled for replacement in accordance with the directions of the Environmental Officer, DMIRS.27-Oct-2017
61Ingress and egress of pastoralists and tenement holders to be preserved by the construction of vehicular access crossings over any pipeline constructed pursuant to this licence.27-Oct-2017
71The licensee shall keep clear such area around any powerline located within the licence area of any dry or other growth which has the potential to be a fire risk.27-Oct-2017
81The electrical installation shall meet the requirements of relevant on-site conditions and be carried out to the satisfaction of the Special Inspector of Mines - Electrical, DMIRS.27-Oct-2017
91The aerodrome to be constructed using proper materials to suit the purpose for which it is to be used.27-Oct-2017
101Wherever any part of a road intersects an existing fence, the holder shall where necessary construct a gate or livestock grid having such dimensions and be constructed of such materials and be of such standard as agreed with the pastoralist or as determined by the Environmental Officer, DMIRS.27-Oct-2017
111The road to be constructed using proper materials to suit the purpose for which it is being constructed, and further that it be constructed in a workman like manner and further that it be constructed to the satisfaction of the Environmental Officer, DMIRS.27-Oct-2017
121The holder shall maintain the road from time to time as shall be required to ensure that it is safe for the purpose that it is constructed.27-Oct-2017
131The area of the miscellaneous licence to be reduced as soon as practicable after construction, to a minimum for the safe maintenance and operation of the licence purposes.27-Oct-2017
141All mining operations to be managed to meet the environmental outcomes, as measured by the performance criteria, stated in table 22 of the Mining Proposal (Reg ID 72489) "Mining Proposal Revised Minor or Preliminary Works, Access Road and Accommodation" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-72489 as Doc ID 5660176.26-Apr-2018 02-Dec-2020
151Management of mine closure to be undertaken in accordance with the Mine Closure Plan (RegID 72489) "Yangibana Rare Earths Project Preliminary Mine Closure Plan" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File Number EARS-MPMCP-72489 as Doc ID 5660193.26-Apr-2018 02-Dec-2020
161

The Licensee to ensure adequate environmental monitoring and analysis is undertaken to allow demonstrate the performance criteria stated in table 22 of the Mining Proposal (Reg ID 72489) "Mining Proposal Revised Minor or Preliminary Works, Access Road and Accommodation" dated 26 March 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-72489 as Doc ID 5660176.

26-Apr-2018 02-Dec-2020
171The Licensee will report any unplanned incident that will cause, or is likely to cause, injury to the land, including any relevant breach of environmental outcome or performance criteria in the approved mining proposal, to the Executive Director, Resources and Environmental Compliance, DMIRS, within 24 hours of the Licensee becoming aware of the occurrence of the incident.
 
26-Apr-2018 02-Dec-2020
181The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.26-Apr-2018
191All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses.26-Apr-2018
202All rubbish and waste will be appropriately managed and disposed.14-Apr-2025
201All rubbish and scrap is to be progressively disposed of in a suitable manner.26-Apr-2018 13-Apr-2025
212The Licensee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations.14-Apr-2025
211The Licensee taking all reasonable measures to prevent or minimise the generation of dust from all materials handling operations, stockpiles, open areas and transport activities.26-Apr-2018 13-Apr-2025
221Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles.26-Apr-2018
231The Licensee submitting to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, DMIRS, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • March
26-Apr-2018 14-Jun-2018
241All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, DMIRS.26-Apr-2018
254A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Energy, Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2027
14-Apr-2025
253A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2024
15-Jan-2024 13-Apr-2025
252A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2023
02-Dec-2020 14-Jan-2024
251A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMIRS. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMIRS's website:
  • 2021
26-Apr-2018 01-Dec-2020
261The Licensee submitting to the Executive Director, Resource and Environmental Compliance Division, DMIRS, an Annual Environmental Report (AER) outlining the project operations during the previous 12 months, and the results of monitoring undertaken to demonstrate the level of achievementof the performance criteria from the approved Mining Proposal and the completion criteria from the approved Mine Closure Plan. The AER to be submitted each year in:
  • March
14-Jun-2018 14-Apr-2025
273All mining operations approved by a Mining Proposal submitted on or after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
272All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
271All mining operations to be managed to meet the environmental outcomes, as measured by the performance criteria, stated in table table 22 of the Mining Proposal (Reg ID 73946) "Yangibana Rare Earths Mining Proposal Minor and Preliminary Works: Stage 1 and Stage 2 Rev 4" dated 28 June 2018 signed by Hannes Zandberg, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 585640313-Jul-2018 01-Dec-2020
283Management of mine closure to be undertaken in accordance with the latest, relevant approved Mine Closure Plan.30-Nov-2021
282Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 83200) "Yangibana Rare Earths Project Mine Closure Plan Revision 8" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7704683.02-Dec-2020 29-Nov-2021
281Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 73946) "Yangibana Rare Earths Project Preliminary Mine Closure Plan Rev 5" dated 28 June 2018 signed by Hannes Zandberg and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 585640913-Jul-2018 01-Dec-2020
292The Licensee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 14-Apr-2025
291The Lessee to ensure adequate environmental monitoring and analysis is undertaken to allow demonstrate the performance criteria stated in table 22 of the Mining Proposal (Reg ID 73946) "Yangibana Rare Earths Mining Proposal Minor and Preliminary Works: Stage 1 and Stage 2 Rev 4" dated 28 June 2018 signed by Hannes Zandberg, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-73946 as Doc ID 585640313-Jul-2018 01-Dec-2020
302All ground disturbance approved by a Mining Proposal submitted on or after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s.30-Nov-2021
301All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 17 October 2019 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 6920069.02-Dec-2020 29-Nov-2021
312No alteration or expansion of mining operations beyond the activities described within the Activity, and Key Mine Activity tables of the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety.30-Nov-2021
311No alteration or expansion of mining operations beyond the activities detailed in Table 2 and Table 3 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
322Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.30-Nov-2021
321Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.02-Dec-2020 29-Nov-2021
332Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted on or after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.30-Nov-2021
331Report any breach of environmental outcome or performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.02-Dec-2020 29-Nov-2021
341All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.02-Dec-2020
351The Licensee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted on or after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
361An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Energy, Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • March
14-Apr-2025

Dealings

TypeNumberDetails
Objection494104Lodged:13:24 19 September 2016Objectors:BAGDEN PTY LTDObjection Type:Tenement ApplicationRECORDED:13:24 19 September 2016WITHDRAWN:10:00 09 June 2017
Application to Amend517173Lodged:10:00 28 April 2017Amending:BoundaryTo:Thence: 422593.884mE 7346787.603mN 422515.00mE 7346013.00mN 421250.00mE 7346283.00mN back to datumAmending:DatumFrom:Datum is situated at GDA 94 Zone 50 422185.00mE 7348592.00mNTo:Datum is situated at GDA 94 Zone 50 421534.829.00mE 7346986.353mNAmending:AreaFrom:232.86500 HATo:90.13350 HADescription and Total hectares amended by way of Perth Warden's Order made on the 28 April 2017 as per Minute of Proposed Orders by Consent.RECORDED:10:00 28 April 2017

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202603-Nov-2025 10948394$2,457.0090.13350 HA27-Oct-2017 $2,457.00$0.00
Rental202516-Oct-2024 10686521$2,402.4090.13350 HA27-Oct-2017 $2,402.40$0.00
Rental202431-Oct-2023 10433137$2,184.0090.13350 HA27-Oct-2017 $2,184.00$0.00
Rental202319-Oct-2022 10296568$2,002.0090.13350 HA27-Oct-2017 $2,002.00$0.00
Rental202218-Oct-2021 10225621$1,792.7090.13350 HA27-Oct-2017 $1,792.70$0.00
Rental202120-Oct-2020 10168599$1,628.9090.13350 HA27-Oct-2017 $1,628.90$0.00
Rental202024-Oct-2019 10119783$1,592.5090.13350 HA27-Oct-2017 $1,592.50$0.00
Rental201926-Oct-2018 EFT$1,501.5090.13350 HA27-Oct-2017 $1,501.50$0.00
Rental201816-Nov-2017 (REFUND) 66136913814PERTH$2,144.2090.13350 HA27-Oct-2017 $1,374.10$0.00
Rental201815-Aug-2016 66136913814$3,518.30

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
17-Aug-2016 Tenement ApplicationInfrastructure Procedure : Infrastructure Cleared Native TitleInfrastructure Procedure2016-09-022016-11-02CLEARED - Infrastructure Cleared Native Title2017-10-12232.87 HA23593S116140E157km NE'ly of Gascoyne Junctiona bore a bore field a communications facility a meteorological station a minesite accommodation facility a minesite administration facility a pipeline a power generation and transmission facility a road an aerodromeNT13672016-11-01WC2016/003Objection Withdrawn2017-10-10Combined Thiin-Mah Warriyangka, Tharrkari, Jiwarli(WC2016/003)WC2016/003WAD464/2016falseDetermined14GeraldtonYamatji Marlpa Aboriginal Corporation