Extracted from MTO on 20-Jun-2026 00:39,
last changed 17-Jun-2026.
| # | Ver | Text | Start | End |
| 1 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-May-2016 | |
| 2 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-May-2016 | |
| 3 | 1 | The rights of ingress to and egress from Miscellaneous Licence 09/66 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 06-May-2016 | |
| 4 | 1 | To properly maintain the installations as directed by the Environmental Officer, Department of Mines and Petroleum. | 06-May-2016 | |
| 5 | 1 | All topsoil that may be removed ahead of pipelaying operations to be stockpiled for replacement in accordance with the directions of the Environmental Officer, Department of Mines and Petroleum. | 06-May-2016 | |
| 6 | 1 | Ingress and egress of pastoralists and tenement holders to be preserved by the construction of vehicular access crossings over any pipeline constructed pursuant to this licence. | 06-May-2016 | |
| 7 | 1 | Wherever any part of a road intersects an existing fence, the holder shall where necessary construct a gate or livestock grid having such dimensions and be constructed of such materials and be of such standard as agreed with the pastoralist or as determined by the Environmental Officer, DMP. | 06-May-2016 | |
| 8 | 1 | The road to be constructed using proper materials to suit the purpose for which it is being constructed, and further that it be constructed in a workman like manner and further that it be constructed to the satisfaction of the Environmental Officer, DMP. | 06-May-2016 | |
| 9 | 1 | The holder shall maintain the road from time to time as shall be required to ensure that it is safe for the purpose that it is constructed. | 06-May-2016 | |
| Cond # | Ver | Text | Start | End |
| 1 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-May-2016 | |
| 2 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-May-2016 | |
| 3 | 1 | The rights of ingress to and egress from Miscellaneous Licence 09/66 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 06-May-2016 | |
| 4 | 1 | To properly maintain the installations as directed by the Environmental Officer, Department of Mines and Petroleum. | 06-May-2016 | |
| 5 | 1 | All topsoil that may be removed ahead of pipelaying operations to be stockpiled for replacement in accordance with the directions of the Environmental Officer, Department of Mines and Petroleum. | 06-May-2016 | |
| 6 | 1 | Ingress and egress of pastoralists and tenement holders to be preserved by the construction of vehicular access crossings over any pipeline constructed pursuant to this licence. | 06-May-2016 | |
| 7 | 1 | Wherever any part of a road intersects an existing fence, the holder shall where necessary construct a gate or livestock grid having such dimensions and be constructed of such materials and be of such standard as agreed with the pastoralist or as determined by the Environmental Officer, DMP. | 06-May-2016 | |
| 8 | 1 | The road to be constructed using proper materials to suit the purpose for which it is being constructed, and further that it be constructed in a workman like manner and further that it be constructed to the satisfaction of the Environmental Officer, DMP. | 06-May-2016 | |
| 9 | 1 | The holder shall maintain the road from time to time as shall be required to ensure that it is safe for the purpose that it is constructed. | 06-May-2016 | |
| Type | Number | Details |
| Objection | 476054 | Lodged:15:58:10 16 October 2015Objectors:MOJITO RESOURCES LIMITEDObjection Type:Tenement ApplicationRECORDED:15:58:10 16 October 2015WITHDRAWN:10:00 27 April 2016 |
| Application to Amend | 526837 | Lodged:14:50:57 29 March 2018Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE METALS PTY LTD, SAME AS CORRESPONDENCE and DTC :GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :GASCOYNE METALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:14:50:57 29 March 2018 |