Tenement: L09-66

View on Landtracker Maps (logon required)

Extracted from MTO on 20-Jun-2026 00:39, last changed 17-Jun-2026.

Tenement Summary

Identifier:L 09/66Type:Miscellaneous Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:108.13100 HA
Purposes:a pipeline, a roadTerm:21 Years
Markout:Received:08-Sep-2015 12:06
Commence:06-May-2016 Expiry:05-May-2037

Holders

Company NameSharesTotal Shares
YANGIBANA JUBILEE PTY LTD40100
WYLOO GASCOYNE PTY LTD60100

Applicants on Receival

Company NameSharesTotal Shares
GASCOYNE METALS PTY LTD100100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847008-Sep-2015 108.13100 HA

Conditions

#VerTextStartEnd
11The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.06-May-2016
21The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
06-May-2016
31To properly maintain the installations as directed by the Environmental Officer, Department of Mines and Petroleum.06-May-2016
41All topsoil that may be removed ahead of pipelaying operations to be stockpiled for replacement in accordance with the directions of the Environmental Officer, Department of Mines and Petroleum.06-May-2016
51Ingress and egress of pastoralists and tenement holders to be preserved by the construction of vehicular access crossings over any pipeline constructed pursuant to this licence.06-May-2016
61Wherever any part of a road intersects an existing fence, the holder shall where necessary construct a gate or livestock grid having such dimensions and be constructed of such materials and be of such standard as agreed with the pastoralist or as determined by the Environmental Officer, DMP.06-May-2016
71The road to be constructed using proper materials to suit the purpose for which it is being constructed, and further that it be constructed in a workman like manner and further that it be constructed to the satisfaction of the Environmental Officer, DMP.06-May-2016
81The holder shall maintain the road from time to time as shall be required to ensure that it is safe for the purpose that it is constructed.06-May-2016
91The licensee is to obtain the written approval of the Shire of Upper Gascoyne or Main Roads WA or both where applicable and lodge a copy of that approval with the Mining Registrar prior to the construction of that part of the road that will intersect with any existing road. Where a difference exists between DMP conditions and the requirements of either authority, the requirements of the authority prevail.06-May-2016
101The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.02-Dec-2020
111Topsoil and vegetation to be removed ahead of mining operations and appropriately stockpiled for later respreading or immediately respread as rehabilitation progresses.02-Dec-2020
121All rubbish and waste will be appropriately managed and disposed.02-Dec-2020
131The Licensee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations.02-Dec-2020
141Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles.02-Dec-2020
151All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.02-Dec-2020
161All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety.02-Dec-2020
172All mining operations approved by a Mining Proposal submitted on or after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
171All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
182All ground disturbance approved by a Mining Proposal submitted on or after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s.30-Nov-2021
181All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 17 October 2019 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 6920069.02-Dec-2020 29-Nov-2021
192No alteration or expansion of mining operations beyond the activities described within the Activity, and Key Mine Activity tables of the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety.30-Nov-2021
191No alteration or expansion of mining operations beyond the activities detailed in Table 2 and table 3 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
202The Licensee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted on or after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
201The Licensee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
212Management of mine closure to be undertaken in accordance with the latest, relevant approved Mine Closure Plan.30-Nov-2021
211Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 83200) "Yangibana Rare Earths Project Mine Closure Plan Revision 8a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807024.02-Dec-2020 29-Nov-2021
222Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.30-Nov-2021
221Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.02-Dec-2020 29-Nov-2021
232Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted on or after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.30-Nov-2021
231Report any breach of environmental outcome or performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.02-Dec-2020 29-Nov-2021
241An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • March
02-Dec-2020
253A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Energy, Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2027
14-Apr-2025
252A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2024
15-Jan-2024 13-Apr-2025
251A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2023
02-Dec-2020 14-Jan-2024

Endorsements

Cond #VerTextStartEnd
11The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.06-May-2016
21The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
06-May-2016
31To properly maintain the installations as directed by the Environmental Officer, Department of Mines and Petroleum.06-May-2016
41All topsoil that may be removed ahead of pipelaying operations to be stockpiled for replacement in accordance with the directions of the Environmental Officer, Department of Mines and Petroleum.06-May-2016
51Ingress and egress of pastoralists and tenement holders to be preserved by the construction of vehicular access crossings over any pipeline constructed pursuant to this licence.06-May-2016
61Wherever any part of a road intersects an existing fence, the holder shall where necessary construct a gate or livestock grid having such dimensions and be constructed of such materials and be of such standard as agreed with the pastoralist or as determined by the Environmental Officer, DMP.06-May-2016
71The road to be constructed using proper materials to suit the purpose for which it is being constructed, and further that it be constructed in a workman like manner and further that it be constructed to the satisfaction of the Environmental Officer, DMP.06-May-2016
81The holder shall maintain the road from time to time as shall be required to ensure that it is safe for the purpose that it is constructed.06-May-2016
91The licensee is to obtain the written approval of the Shire of Upper Gascoyne or Main Roads WA or both where applicable and lodge a copy of that approval with the Mining Registrar prior to the construction of that part of the road that will intersect with any existing road. Where a difference exists between DMP conditions and the requirements of either authority, the requirements of the authority prevail.06-May-2016
101The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.02-Dec-2020
111Topsoil and vegetation to be removed ahead of mining operations and appropriately stockpiled for later respreading or immediately respread as rehabilitation progresses.02-Dec-2020
121All rubbish and waste will be appropriately managed and disposed.02-Dec-2020
131The Licensee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations.02-Dec-2020
141Where saline water is used for dust suppression, all reasonable measures being taken to avoid any detrimental effects to surrounding vegetation and topsoil stockpiles.02-Dec-2020
151All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.02-Dec-2020
161All activities being carried out in such a manner so as to not have a detrimental effect on the natural water flow through the lease and surrounding areas to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety.02-Dec-2020
172All mining operations approved by a Mining Proposal submitted on or after 3 March 2020 to meet the environmental outcomes and performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
171All mining operations to meet the environmental outcomes as measured by the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
182All ground disturbance approved by a Mining Proposal submitted on or after 3 March 2020 to be undertaken within the disturbance envelope as presented within the latest, relevant approved Mining Proposal/s.30-Nov-2021
181All ground disturbance to be undertaken within the disturbance envelope as represented by the spatial data provided on 17 October 2019 and retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 6920069.02-Dec-2020 29-Nov-2021
192No alteration or expansion of mining operations beyond the activities described within the Activity, and Key Mine Activity tables of the latest, relevant approved Mining Proposal/s unless a subsequent Mining Proposal is submitted, in the form defined in section 70O of the Mining Act 1978, to cover the alteration or expansion, and until such Mining Proposal is approved by the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety.30-Nov-2021
191No alteration or expansion of mining operations beyond the activities detailed in Table 2 and table 3 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
202The Licensee to ensure adequate environmental monitoring and analysis is undertaken of activities approved by a Mining Proposal submitted on or after 3 March 2020 to demonstrate the level of achievement of the performance criteria stated in the latest, relevant approved Mining Proposal/s.30-Nov-2021
201The Licensee to ensure adequate environmental monitoring and analysis is undertaken to demonstrate the level of achievement of the performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026.02-Dec-2020 29-Nov-2021
212Management of mine closure to be undertaken in accordance with the latest, relevant approved Mine Closure Plan.30-Nov-2021
211Management of mine closure to be undertaken in accordance with the Mine Closure Plan (Reg ID 83200) "Yangibana Rare Earths Project Mine Closure Plan Revision 8a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807024.02-Dec-2020 29-Nov-2021
222Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.30-Nov-2021
221Report any incident arising from mining activities that has caused, or has the potential to cause environmental harm or injury to the land, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety, within 24 hours of becoming aware of the occurrence of the incident.02-Dec-2020 29-Nov-2021
232Report any breach of environmental outcome or performance criteria contained within an approved Mining Proposal submitted on or after 3 March 2020, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.30-Nov-2021
231Report any breach of environmental outcome or performance criteria stated in Table 35 of the Mining Proposal (Reg ID 83200) "Yangibana Rare Earths Project Mining Proposal Minor and Preliminary works (stage 1 and 2) and Site- Wide Mining Proposal Revision 7a" retained on Department of Mines, Industry Regulation and Safety File No. EARS-MPMCP-83200 as Doc ID 7807026, to the Executive Director, Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety within 24 hours of becoming aware of the occurrence of the breach.02-Dec-2020 29-Nov-2021
241An annual environmental report is to be submitted to the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety, outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months. This report is to be submitted each year in:
  • March
02-Dec-2020
253A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Energy, Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2027
14-Apr-2025
252A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2024
15-Jan-2024 13-Apr-2025
251A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2023
02-Dec-2020 14-Jan-2024

Dealings

TypeNumberDetails
Objection475836Lodged:15:20:28 13 October 2015Objectors:MOJITO RESOURCES LIMITEDObjection Type:Tenement ApplicationRECORDED:15:20:28 13 October 2015WITHDRAWN:10:00 27 April 2016
Application to Amend526837Lodged:14:50:57 29 March 2018Amending:Address (Including DTC Details)From:Principal Place of Business : GASCOYNE METALS PTY LTD, SAME AS CORRESPONDENCE and DTC :GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : GASCOYNE METALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :GASCOYNE METALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:14:50:57 29 March 2018

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202727-Mar-2026 11056543$2,943.00108.13100 HA06-May-2016 $2,943.00$0.00
Rental202616-May-2025 10822097$2,877.60108.13100 HA06-May-2016 $2,877.60$0.00
Rental202503-May-2024 10561030$2,616.00108.13100 HA06-May-2016 $2,616.00$0.00
Rental202428-Apr-2023 10353181$2,398.00108.13100 HA06-May-2016 $2,398.00$0.00
Rental202316-May-2022 10262907$2,147.30108.13100 HA06-May-2016 $2,147.30$0.00
Rental202230-Apr-2021 10194565$1,951.10108.13100 HA06-May-2016 $1,951.10$0.00
Rental202105-May-2020 10143315$1,907.50108.13100 HA06-May-2016 $1,907.50$0.00
Rental202002-May-2019 10094533$1,798.50108.13100 HA06-May-2016 $1,798.50$0.00
Rental201902-May-2018 8951543258$1,700.40108.13100 HA06-May-2016 $1,700.40$0.00
Rental201812-May-2017 MT-210011064776-DD$1,645.90108.13100 HA06-May-2016 $1,645.90$0.00
Rental201708-Sep-2015 525114381634$1,591.40108.13100 HA06-May-2016 $1,591.40$0.00

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
14-Sep-2015 Tenement ApplicationInfrastructure Procedure : Infrastructure Cleared Native TitleInfrastructure Procedure2015-10-022015-12-02CLEARED - Infrastructure Cleared Native Title2015-12-04108.13 HA235240S116757E160km NE'ly of Gascoyne Junctiona pipeline a road14GeraldtonYamatji Marlpa Aboriginal Corporation