Tenement: m45/579

View on Landtracker Maps (logon required)

Extracted from MTO on 29-Apr-2024 00:13, last changed 03-Oct-2023.

Tenement Summary

Identifier:M 45/579Type:Mining Lease
Status:LiveDistrict:MARBLE BAR
Lodged:MARBLE BARArea:59.39500 HA
Purposes:Term:21 Years (Renewed)
Markout:30-Apr-1993 10:30Received:30-Apr-1993 11:40
Commence:11-Aug-1993 Expiry:10-Aug-2035

Holders

Company NameSharesTotal Shares
TELFER, John Edward100100

Applicants on Receival

Company NameSharesTotal Shares
TELFER, John Edward100100

Shires

Shire NameShire NumberStartArea
EAST PILBARA SHIRE322030-Apr-1993 59.39500 HA

Conditions

#VerTextStartEnd
11Survey.11-Aug-1993
21Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which would interfere with or damage any Aboriginal site.11-Aug-1993
31All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion.11-Aug-1993
42All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.12-Aug-2005
41All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer.11-Aug-1993 11-Aug-2005
51All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.11-Aug-1993
62Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Aug-2005
61Unless the written approval of the District Mining Engineer, Department of Mines, is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.11-Aug-1993 11-Aug-2005
72No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained.12-Aug-2005
71No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained.11-Aug-1993 11-Aug-2005
82The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
  • "Notice of Intent- Low Impact Mining Operation" for Mining Lease 45/579 dated 06 August 1998 and retained on Department of Minerals and Energy File No. 2197/98.
  • (MPMCP Reg ID 90203) "Mining Proposal and Mine Closure Plan for Small Operations - Owens Gully Mining" dated 26 September 2020, and retained on Department of Mines, Industry Regulation and safety File No. EARS-MPMCP-90203 as Doc ID 7738680
Where a difference exists between the above document(s) and the following conditions then the following conditions shall apply.
26-Oct-2020
81The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled: "Notice of Intent- Low Impact Mining Operation" for Mining Lease 45/579 dated 06 August 1998 and retained on Department of Minerals and Energy File No. 2197/98.Where a difference exists between the above document(s) and the following conditions then the following conditions shall apply.20-Jan-1999 25-Oct-2020
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.20-Jan-1999
101All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses.20-Jan-1999
111At the completion of operation all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer.20-Jan-1999
121All rubbish and scrap being progressively disposed of in a suitable manner.20-Jan-1999
131At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the State Mining Engineer.20-Jan-1999
141Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a program to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained.20-Jan-1999
151The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines in the sum of $2,000 for due compliance with the environmental conditions of the lease.20-Jan-1999 01-Jul-2013
162

The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:

  • April.
30-Aug-2013
161The lessee submitting to the State Mining Engineer in April of each year, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months.20-Jan-1999 30-Aug-2013
171A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
  • 2012.
01-Aug-2012 26-Oct-2020
181A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2025
26-Oct-2020
191All reasonable and practicable measures will be taken to prevent the spread of dieback and weeds.26-Oct-2020
201Lined storage dams will be fitted with appropriate fauna egress points to ensure that any fauna does not become entrapped.26-Oct-2020
211All reasonable measures will be taken to ensure all hydrocarbons, environmentally hazardous chemicals, process water and other environmentally hazardous substances or waste are stored and managed in a manner to prevent discharges to the environment.26-Oct-2020
221All hydrocarbon spills or chemical spills will be contained and cleaned up within a timely manner.26-Oct-2020
231Clearing of large, mature trees will be avoided, where practicable.26-Oct-2020
241All activities to be undertaken so as to avoid or minimise damage, disturbance or contamination of waterways, including their beds and banks, riparian and other water dependent vegetation.26-Oct-2020
251The Lessee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations.26-Oct-2020
261All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.26-Oct-2020
271All excavations will be backfilled and/or closed to ensure they are stable and safe to the satisfaction of the Executive Director, Resource and Environmental Compliance Division, DMIRS.26-Oct-2020
281All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of the operation.26-Oct-2020
291Any watercourses that are disturbed by mining operations will be restored, as far as practicable, to the pre-disturbance conditions.26-Oct-2020
301Any shafts will be covered, fenced or otherwise made safe to the satisfaction of the Executive Director, Resource and Environmental Compliance Division, DMIRS.26-Oct-2020
311All chemicals and hydrocarbons will be removed from site prior to or at the termination of the operation.26-Oct-2020
321Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time.26-Oct-2020

Endorsements

Cond #VerTextStartEnd
11Survey.11-Aug-1993
21Compliance with the provisions of the Aboriginal Heritage Act, 1972 to ensure that no action is taken which would interfere with or damage any Aboriginal site.11-Aug-1993
31All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion.11-Aug-1993
42All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.12-Aug-2005
41All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer.11-Aug-1993 11-Aug-2005
51All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.11-Aug-1993
62Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.12-Aug-2005
61Unless the written approval of the District Mining Engineer, Department of Mines, is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.11-Aug-1993 11-Aug-2005
72No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the Director, Environment, DoIR for assessment; and until his written approval has been obtained.12-Aug-2005
71No developmental or productive mining or construction activity being commenced until the tenement holder has submitted a plan of the proposed operations and measures to safeguard the environment to the State Mining Engineer for assessment; and until his written approval has been obtained.11-Aug-1993 11-Aug-2005
82The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled:
  • "Notice of Intent- Low Impact Mining Operation" for Mining Lease 45/579 dated 06 August 1998 and retained on Department of Minerals and Energy File No. 2197/98.
  • (MPMCP Reg ID 90203) "Mining Proposal and Mine Closure Plan for Small Operations - Owens Gully Mining" dated 26 September 2020, and retained on Department of Mines, Industry Regulation and safety File No. EARS-MPMCP-90203 as Doc ID 7738680
Where a difference exists between the above document(s) and the following conditions then the following conditions shall apply.
26-Oct-2020
81The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the documents titled: "Notice of Intent- Low Impact Mining Operation" for Mining Lease 45/579 dated 06 August 1998 and retained on Department of Minerals and Energy File No. 2197/98.Where a difference exists between the above document(s) and the following conditions then the following conditions shall apply.20-Jan-1999 25-Oct-2020
91The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform.20-Jan-1999
101All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses.20-Jan-1999
111At the completion of operation all buildings and structures being removed from site or demolished and buried to the satisfaction of the State Mining Engineer.20-Jan-1999
121All rubbish and scrap being progressively disposed of in a suitable manner.20-Jan-1999
131At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the State Mining Engineer.20-Jan-1999
141Any alteration or expansion of operations within the lease boundaries beyond that outlined in the above document(s) not commencing until a plan of operations and a program to safeguard the environment are submitted to the State Mining Engineer for his assessment and until his written approval to proceed has been obtained.20-Jan-1999
151The lessee arranging lodgement of an Unconditional Performance Bond executed by a Bank or other approved financial institution in favour of the Minister for Mines in the sum of $2,000 for due compliance with the environmental conditions of the lease.20-Jan-1999 01-Jul-2013
162

The Lessee submitting to the Executive Director, Environment Division, DMP, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months. This report to be submitted each year in:

  • April.
30-Aug-2013
161The lessee submitting to the State Mining Engineer in April of each year, a brief annual report outlining the project operations, minesite environmental management and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programs for the next 12 months.20-Jan-1999 30-Aug-2013
171A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by an Environmental Officer, DMP. The Mine Closure Plan is to be prepared in accordance with the "Guidelines for Preparing Mine Closure Plans" available on DMP's website:
  • 2012.
01-Aug-2012 26-Oct-2020
181A Mine Closure Plan is to be submitted in the Annual Environmental Reporting month specified in tenement conditions in the year specified below, unless otherwise directed by the Executive Director Resource and Environmental Compliance Division, Department of Mines, Industry Regulation and Safety. The Mine Closure Plan is to be prepared in accordance with the Department's "Guidelines for Preparing Mine Closure Plans":
  • 2025
26-Oct-2020
191All reasonable and practicable measures will be taken to prevent the spread of dieback and weeds.26-Oct-2020
201Lined storage dams will be fitted with appropriate fauna egress points to ensure that any fauna does not become entrapped.26-Oct-2020
211All reasonable measures will be taken to ensure all hydrocarbons, environmentally hazardous chemicals, process water and other environmentally hazardous substances or waste are stored and managed in a manner to prevent discharges to the environment.26-Oct-2020
221All hydrocarbon spills or chemical spills will be contained and cleaned up within a timely manner.26-Oct-2020
231Clearing of large, mature trees will be avoided, where practicable.26-Oct-2020
241All activities to be undertaken so as to avoid or minimise damage, disturbance or contamination of waterways, including their beds and banks, riparian and other water dependent vegetation.26-Oct-2020
251The Lessee taking all reasonable and practicable measures to prevent or minimise the generation of dust from mining operations.26-Oct-2020
261All mining related landforms and disturbances must be rehabilitated, in a progressive manner where practicable, to ensure they are safe, stable, non-polluting, integrated with the surrounding landscape and support self-sustaining, functional ecosystems or alternative agreed outcome to the satisfaction of the Executive Director, Resource and Environmental Compliance, Department of Mines, Industry Regulation and Safety.26-Oct-2020
271All excavations will be backfilled and/or closed to ensure they are stable and safe to the satisfaction of the Executive Director, Resource and Environmental Compliance Division, DMIRS.26-Oct-2020
281All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of the operation.26-Oct-2020
291Any watercourses that are disturbed by mining operations will be restored, as far as practicable, to the pre-disturbance conditions.26-Oct-2020
301Any shafts will be covered, fenced or otherwise made safe to the satisfaction of the Executive Director, Resource and Environmental Compliance Division, DMIRS.26-Oct-2020
311All chemicals and hydrocarbons will be removed from site prior to or at the termination of the operation.26-Oct-2020
321Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time.26-Oct-2020

Dealings

TypeNumberDetails
Agreement24H/956Agreement (Option) CRA Exploration Pty Ltd. and John Edward TELFER Lodged 9:30:00 AM on 27 Jul 1995REGISTERED 9:30 AM 27 Jul 1995
Caveat220H/956Lodged 9:30:00 AM on 27 Jul 1995 by CRA EXPLORATION PTY LTDRECORDED 9:30 AM 27 Jul 1995WITHDRAWN 1:15:00 PM 27 Jul 1996
Withdrawal of Dealing58H/967Lodged 1:15:00 PM on 24 Jul 1996 withdrawing Caveat 220H/956REGISTERED 1:15 PM 24 Jul 1996
BondPE4689Lodged on 07 Jan 1999 For $2,000.00RECORDED 07 Jan 1999Lodged:00:00 07 January 1999Bond Type:Unconditional Performance BondBond Amount:$2,000.00RECORDED:07 January 1999RETIRED - MRF:05 February 2015
Application to AmendMB13/001Lodged 3:10:00 PM on 05 Jan 2001 amending the address to read: " PO Box 107, Cue WA 6640."REGISTERED 3:10 PM 05 Jan 2001
Caveat256H/045Lodged 10:00:00 AM on 20 Dec 2004 by Robert Edward WARD in respect to 100/100ths shares in the name of John Edward TELFERRECORDED 10:00 AM 20 Dec 2004Lodged:10:00 20 December 2004Caveat Type:CaveatCaveator:WARD, Robert EdwardShares Caveated:100/100 shares TELFER, John EdwardRECORDED:10:00 20 December 2004Re Agreement 265H/045 (207745), 14 day notice sent 26 February 2019. Caveat to remain in full force and effect by order Warden O'Sullivan SM on 21 February 2019. Re: Transfer 545598 14 Day notice sent 25 February 2019
Application for Forfeiture272308Lodged 9:50:00 AM on 13 Aug 2007 by Robert Edward WARDRECORDED:09:50 13 August 2007DISMISSED: 00:00:00 11/11/2008
Bond Requirement311514Requirement Date:20/11/1999Amount:$2,000.00RECORDED:14:59:13 20 November 1999FINALISED:10:19:29 05 February 2015
Application to Amend388966Lodged:10:20 10 January 2012Amending:AddressFrom:Residential : TELFER, John Edward, SAME AS CORRESPONDENCE and Correspondence :TELFER, John Edward, C/-, PO BOX 216, SOUTHERN CROSS, WA, 6426To:Residential : TELFER, John Edward, ADDRESS NOT PROVIDED and Correspondence :TELFER, John Edward, PO BOX 8236, PERTH BC, WA, 6849RECORDED:10:20 10 January 2012
Application to Amend421871Lodged:08:45 29 April 2013Amending:AddressFrom:TELFER, John Edward, PO BOX 8236, PERTH BC, WA, 6849To:TELFER, John Edward, PO BOX 1093, NEDLANDS, WA, 6909RECORDED:08:45 29 April 2013
Application to Amend440235Lodged:16:15 10 February 2014Amending:AddressFrom:TELFER, John Edward, PO BOX 1093, NEDLANDS, WA, 6909To:TELFER, John Edward, PO BOX 559, NORTH PERTH, WA, 6960RECORDED:16:15 10 February 2014
Extension / Renewal of Term453156Lodged:10:53:40 19 August 2014Applied For Period:21 YearsRECORDED:10:53:40 19 August 2014GRANTED:31 October 2014Granted Period:21 YearsTerm Renewed To:10/08/2035Late application approved and signed by Minister 31/10/2014
Application to Amend472637Lodged:13:34:02 10 August 2015Amending:AddressFrom:TELFER, John Edward, PO BOX 559, NORTH PERTH, WA, 6960To:TELFER, John Edward, P.O BOX 216, SOUTHERN CROSS, WA, 6426RECORDED:13:34:02 10 August 2015
Extension of Time517430Lodged:14:00 31 October 2017Type:Form 5RECORDED:14:00 31 October 2017APPROVED:11:30:58 02 November 2017Time to lodge extended to 02/11/2017
Application to Amend523070Lodged:15:20 07 February 2018Amending:Address (Including DTC Details)From:TELFER, John Edward, P.O BOX 216, SOUTHERN CROSS, WA, 6426To:TELFER, John Edward, P.O BOX 204, MERREDIN, WA, 6415RECORDED:15:20 07 February 2018

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202429-Aug-2023 06-187363PERTH$1,560.0059.39500 HA23-Aug-2003 $1,560.00$0.00
Rental202322-Aug-2022 01-004827SOUTHERN CROSS$1,440.0059.39500 HA23-Aug-2003 $1,440.00$0.00
Rental202207-Sep-2021 10219251$1,320.0059.39500 HA23-Aug-2003 $1,320.00$0.00
Rental202131-Jul-2020 01-004659SOUTHERN CROSS$1,200.0059.39500 HA23-Aug-2003 $1,200.00$0.00
Rental202009-Sep-2019 01-004603SOUTHERN CROSS$1,188.0059.39500 HA23-Aug-2003 $1,188.00$0.00
Rental201910-Sep-2018 01-004490SOUTHERN CROSS$1,122.0059.39500 HA23-Aug-2003 $1,122.00$0.00
Rental201811-Sep-2017 01-004340SOUTHERN CROSS$1,056.0059.39500 HA23-Aug-2003 $1,056.00$0.00
Rental201722-Sep-2016 06-156611PERTH$1,023.0059.39500 HA23-Aug-2003 $1,023.00$0.00
Rental201607-Sep-2015 06-148463PERTH$990.0059.39500 HA23-Aug-2003 $990.00$0.00
Rental201519-Aug-2014 423112336077$966.0059.39500 HA23-Aug-2003 $966.00$0.00
Rental201405-Sep-2013 MT-210010131498-EF$942.0059.39500 HA23-Aug-2003 $942.00$0.00
Rental201306-Jul-2012 MT-210010052385-EF$924.0059.39500 HA23-Aug-2003 $924.00$0.00
Rental201207-Sep-2011 99671PERTH$900.0059.39500 HA23-Aug-2003 $900.00$0.00
Rental201106-Sep-2010 83758PERTH$957.0059.39500 HA23-Aug-2003 $957.00$0.00
Rental201026-Aug-2009 68971PERTH$937.2059.39500 HA23-Aug-2003 $937.20$0.00
Rental200908-Sep-2008 56007PERTH$897.6059.39500 HA23-Aug-2003 $897.60$0.00
Rental200824-Aug-2007 41586PERTH$871.2059.39500 HA23-Aug-2003 $871.20$0.00
Rental200721-Aug-2006 27974PERTH$831.6059.39500 HA23-Aug-2003 $831.60$0.00
Rental200622-Aug-2005 14680PERTH$805.2059.39500 HA23-Aug-2003 $805.20$0.00
Rental200529-Jul-2004 948PERTH$785.4059.39500 HA23-Aug-2003 $785.40$0.00
Rental200428-Jun-2004 (REFUND) 63841PERTH$255.2059.39500 HA23-Aug-2003 $765.60$0.00
Rental200402-Sep-2003 63841PERTH$1,020.80
Rental200311-Sep-2002 52727PERTH$985.6059.39500 HA23-Aug-2003 $739.20$246.40
Rental200215-Oct-2001 4115KALGOORLIE$53.6059.39500 HA23-Aug-2003 $720.00$240.00
Rental200204-Oct-2001 4054KALGOORLIE$906.40
Rental200120-Sep-2000 28275PERTH$906.4059.39500 HA23-Aug-2003 $679.80$226.60
Rental200026-Jul-2000 25595PERTH$9.2359.39500 HA23-Aug-2003 $624.92$208.31
Rental200006-Sep-1999 15190PERTH$824.00
Rental199904-Sep-1998 1386PERTH$824.0059.39500 HA23-Aug-2003 $618.00$206.00
Rental199807-Aug-1997 165810PERTH$800.0059.39500 HA23-Aug-2003 $600.00$200.00
Rental199728-Jun-2004 (REFUND) 147874PERTH$555.3159.39500 HA23-Aug-2003 $600.00-$355.31
Rental199714-Aug-1996 147874PERTH$800.00
Rental199628-Jun-2004 (REFUND) 130483PERTH$800.0059.39500 HA23-Aug-2003 $600.00-$600.00
Rental199616-Aug-1995 130483PERTH$800.00
Rental199528-Jun-2004 (REFUND) 113010PERTH$744.0059.39500 HA23-Aug-2003 $558.00-$558.00
Rental199522-Aug-1994 113010PERTH$744.00
Rental199430-Apr-1993 5074MT. MAGNET$744.0059.39500 HA23-Aug-2003 $558.00$186.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2024$10,000.00false
2023$10,000.0002-Oct-2023 $40,410.00$0.00$0.00$0.00$0.00$0.00$40,410.00false
2022$10,000.0015-Sep-2022 $47,808.43$0.00$0.00$0.00$0.00$0.00$47,808.43false
2021$10,000.0004-Oct-2021 $31,730.00$0.00$0.00$0.00$0.00$0.00$31,730.00false
2020$10,000.0021-Sep-2020 $12,882.00$0.00$0.00$0.00$0.00$0.00$12,882.00false
2019$10,000.0008-Oct-2019 $13,235.80$0.00$0.00$0.00$0.00$0.00$13,235.80false
2018$10,000.0004-Oct-2018 $12,209.65$0.00$0.00$0.00$0.00$0.00$12,209.65false
2017$10,000.0031-Oct-2017 $49,850.00$0.00$0.00$0.00$0.00$0.00$49,850.00false
2016$10,000.0003-Oct-2016 $14,233.00$0.00$0.00$0.00$0.00$0.00$14,233.00false
2015$10,000.0017-Sep-2015 $20,530.00$0.00$0.00$0.00$0.00$0.00$20,530.00false
2014$10,000.0019-Aug-2014 $10,844.00$0.00$0.00$0.00$0.00$0.00$10,844.00false
2013$10,000.0024-Sep-2013 $13,142.00$0.00$0.00$0.00$0.00$0.00$13,142.00false
2012$10,000.0012-Sep-2012 $11,359.00$0.00$0.00$0.00$0.00$0.00$11,359.00false
2011$10,000.0021-Sep-2011 $26,207.00$0.00$0.00$0.00$0.00$0.00$26,207.00false
2010$10,000.0006-Sep-2010 $52,232.00$0.00$0.00$0.00$0.00$0.00$52,232.00false
2009$10,000.0030-Sep-2009 $193,700.00$0.00$0.00$0.00$0.00$0.00$193,700.00false
2008$10,000.0024-Sep-2008 $1,500.00$0.00$0.00$0.00$0.00$0.00$1,500.00false
2007$10,000.0003-Sep-2007 $15,200.00$0.00$0.00$0.00$0.00$0.00$15,200.00false
2006$10,000.0006-Sep-2006 $17,460.00$0.00$0.00$0.00$0.00$0.00$17,460.00false
2005$10,000.0031-Aug-2005 $17,150.00$0.00$0.00$0.00$0.00$0.00$17,150.00false
2004$10,000.0025-Aug-2004 $47,900.00$0.00$0.00$0.00$0.00$0.00$47,900.00false
2003$10,000.0003-Sep-2003 $15,810.00$0.00$0.00$0.00$0.00$0.00$15,810.00false
2002$10,000.0003-Oct-2002 $16,960.00$0.00$15,600.00$0.00$1,360.00$0.00$0.00false
2001$10,000.0008-Oct-2001 $13,200.00$0.00$0.00$0.00$0.00$0.00$0.00false
2000$10,000.0020-Sep-2000 $1,340.004554705-Sep-2000 $10,000.00Granted31-Jan-2001 $0.00$0.00$0.00$0.00$0.00$0.00false
1999$10,000.0028-Sep-1999 $11,680.00$0.00$0.00$0.00$0.00$0.00$0.00false
1998$10,000.0027-Aug-1998 $11,100.00$0.00$0.00$0.00$0.00$0.00$0.00false
1997$10,000.0028-Aug-1997 $12,000.00$0.00$0.00$0.00$0.00$0.00$0.00false
1996$10,000.0016-Sep-1996 $13,285.00$0.00$0.00$0.00$0.00$0.00$0.00false
1995$10,000.0016-Aug-1995 $13,300.00$0.00$0.00$0.00$0.00$0.00$0.00false
1994$10,000.0014-Sep-1994 $10,400.00$0.00$0.00$0.00$0.00$0.00$0.00false

Bond

Bond NumberNameSuretyAmountBond DateStatusStatus DateTypeCeasedOther Affected Tenements
311514Bond Requirement$2,000.0002-Feb-2009 Finalised05-Feb-2015 true
PE4689Bond - Unconditional Performance BondCOMMONWEALTH BANK OF AUSTRALIA$2,000.00 (Inital)07-Jan-1999 Retired - MRF05-Feb-2015 Unconditional Performance Bondtrue

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
Tenement Application