Tenement: E09/2333

View on Landtracker Maps (logon required)

Extracted from MTO on 09-Jun-2026 00:43, last changed 09-Jun-2026.

Tenement Summary

Identifier:E 09/2333Type:Exploration Licence
Status:LiveDistrict:GASCOYNE M.F.
Lodged:ONLINEArea:7 BL
Purposes:Term:5 Years (Extended)
Markout:Received:12-Oct-2018 10:29
Commence:16-Jan-2020 Expiry:15-Jan-2030

Holders

Company NameSharesTotal Shares
YANGIBANA JUBILEE PTY LTD40100
WYLOO GASCOYNE PTY LTD60100

Applicants on Receival

Company NameSharesTotal Shares
GASCOYNE METALS PTY LTD70100
MOJITO RESOURCES LIMITED30100

Shires

Shire NameShire NumberStartArea
UPPER GASCOYNE SHIRE847012-Oct-2018 7.00000 BL

Conditions

#VerTextStartEnd
12Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration.26-Feb-2026
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.16-Jan-2020 25-Feb-2026
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.16-Jan-2020
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.16-Jan-2020
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.16-Jan-2020
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
16-Jan-2020
61The rights of ingress to and egress from Miscellaneous Licence 09/89 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.16-Jan-2020
71All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration.26-Feb-2026
81The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department of Mines, Petroleum and Exploration upon request.26-Feb-2026
91All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.26-Feb-2026

Endorsements

Cond #VerTextStartEnd
12Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration.26-Feb-2026
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.16-Jan-2020 25-Feb-2026
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.16-Jan-2020
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.16-Jan-2020
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.16-Jan-2020
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
16-Jan-2020
61The rights of ingress to and egress from Miscellaneous Licence 09/89 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.16-Jan-2020
71All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration.26-Feb-2026
81The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department of Mines, Petroleum and Exploration upon request.26-Feb-2026
91All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.26-Feb-2026

Dealings

TypeNumberDetails
Application to Amend673176Lodged:15:24:05 12 April 2023Amending:Address (Including DTC Details)From:Principal Place of Business : YANGIBANA PTY LTD, LEVEL 3, 5 MILL STREET, PERTH, WA, 6000 and DTC :YANGIBANA PTY LTD, YANGIBANA PTY LTD, LEVEL 3, 5 MILL STREET, PERTH, WA, 6000To:Principal Place of Business : YANGIBANA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400 and DTC :YANGIBANA PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400RECORDED:15:24:05 12 April 2023
Extension / Renewal of Term723526Lodged:08:30 15 January 2025Applied For Period:5 YearsRECORDED:08:30 15 January 2025GRANTED:17 July 2025Granted Period:5 YearsTerm Extended To:15/01/2030
Application to Amend734926Lodged:15:17:42 03 June 2025From:YANGIBANA PTY LTDAmending:NameTo:YANGIBANA JUBILEE PTY LTDRECORDED:15:17:42 03 June 2025

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202719-Dec-2025 10985283$2,968.007 BL16-Jan-2020 $2,968.00$0.00
Rental202603-Jan-2025 10731212$2,898.007 BL16-Jan-2020 $2,898.00$0.00
Rental202502-Jan-2024 10474978$2,023.007 BL16-Jan-2020 $2,023.00$0.00
Rental202430-Dec-2022 10314528$1,925.007 BL16-Jan-2020 $1,925.00$0.00
Rental202314-Jan-2022 10238811$1,022.007 BL16-Jan-2020 $1,022.00$0.00
Rental202231-Dec-2020 10177053$987.007 BL16-Jan-2020 $987.00$0.00
Rental202112-Oct-2018 87670796239$952.007 BL16-Jan-2020 $952.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2027$50,000.00false
2026$50,000.0013-Mar-2026 $58,548.00$47,304.00$0.00$0.00$5,098.00$6,146.00$0.00false
2025$30,000.0013-Mar-2025 $36,176.00$25,078.00$0.00$0.00$5,098.00$6,000.00$0.00false
2024$30,000.0012-Mar-2024 $30,083.00$23,133.00$0.00$0.00$950.00$6,000.00$0.00false
2023$20,000.0010-Mar-2023 $18,231.0067064510-Mar-2023 $20,000.00Granted03-Jul-2023 $12,978.00$0.00$0.00$2,875.00$2,378.00$0.00false
2022$20,000.0015-Mar-2022 $23,822.00$20,350.00$0.00$0.00$1,472.00$2,000.00$0.00false
2021$20,000.0016-Mar-2021 $29,997.00$23,635.00$0.00$0.00$2,594.00$3,768.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
09-Aug-2019 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2019-08-232019-12-23CLEARED - Expedited Applies2020-01-167 BL235347S11654E95.4km NW'ly of Mt augustusCombined Thiin-Mah, Warriyangka, Tharrkari and Jiwarli People(WCD2019/003)WC2016/003WAD464/2016trueWCD2019/003EXISTYes14GeraldtonYamatji Marlpa Aboriginal Corporation