Extracted from MTO on 30-Jun-2024 00:24,
last changed 27-Jun-2024.
# | Ver | Text | Start | End |
1 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use and Benefit of Aborigines Reserve 22032. | 10-Jun-2011 | 08-Jan-2017 |
| 1 | Consent to explore on Use and Benefit of Aborigines Reserve 22032 granted by the Minister responsible for the Mining Act 1978 subject to the following conditions: | 09-Jan-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Jan-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Jan-2017 | |
4 | 1 | No interference with Geodetic Survey Station SSM-DUKETON 19 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 09-Jan-2017 | |
5 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 09-Jan-2017 | |
6 | 1 | Entry on Use & Benefit of Aborigines Reserve 22032 and activities undertaken on the Licence by any non-Aboriginal lessee, licensee, employee, contractor or agent being authorised by an entry permit issued under the provisions of the Aboriginal Affairs Planning Authority Act 1972. | 09-Jan-2017 | |
7 | 1 | No exploration activities being carried out within the buffer zone for Cosmo Newberry Community (designated FNA 442).
| 09-Jan-2017 | |
8 | 1 | The rights of ingress to and egress from Miscellaneous Licence 38/259 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 25-May-2021 | |
9 | 1 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Jun-2024 | |
10 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Jun-2024 | |
11 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 10-Jun-2024 | |
12 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 10-Jun-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use and Benefit of Aborigines Reserve 22032. | 10-Jun-2011 | 08-Jan-2017 |
| 1 | Consent to explore on Use and Benefit of Aborigines Reserve 22032 granted by the Minister responsible for the Mining Act 1978 subject to the following conditions: | 09-Jan-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Jan-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Jan-2017 | |
4 | 1 | No interference with Geodetic Survey Station SSM-DUKETON 19 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 09-Jan-2017 | |
5 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 09-Jan-2017 | |
6 | 1 | Entry on Use & Benefit of Aborigines Reserve 22032 and activities undertaken on the Licence by any non-Aboriginal lessee, licensee, employee, contractor or agent being authorised by an entry permit issued under the provisions of the Aboriginal Affairs Planning Authority Act 1972. | 09-Jan-2017 | |
7 | 1 | No exploration activities being carried out within the buffer zone for Cosmo Newberry Community (designated FNA 442).
| 09-Jan-2017 | |
8 | 1 | The rights of ingress to and egress from Miscellaneous Licence 38/259 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 25-May-2021 | |
9 | 1 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Jun-2024 | |
10 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 10-Jun-2024 | |
11 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 10-Jun-2024 | |
12 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 10-Jun-2024 | |
Type | Number | Details |
Extension of Time | 325818 | Lodged:10:29 16 July 2009Type:AdvertRECORDED:10:29 16 July 2009APPROVED:11:45 17 July 2009 |
Extension of Time | 325822 | Lodged:10:29 16 July 2009Type:SecurityRECORDED:10:29 16 July 2009APPROVED:14:45 31 July 2009 |
Licence Instrument | 418515 | Lodged:08:30 10 June 2011ISSUED:08:30 10 June 2011 |
Forfeiture | 406013 | Initiated:14/09/2012 for non-compliance with reporting requirements( Form 5 )WITHDRAWN:14 September 2012 (new list to be created)Notice Issued:Regulation 50 Notice sent 14/09/2012 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:22/10/2012 |
Forfeiture | 406041 | Initiated:18/09/2012 for non-compliance with reporting requirements( Form 5 )RECORDED:14:31:06 14 September 2012Notice Issued:Regulation 50 Notice sent 18/09/2012 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:22/10/2012FINALISED:Order by Minister on 16 November 2012 that E 38/2274 be Penalty Imposed |
Application for Forfeiture | 408040 | Lodged:11:45 15 October 2012Applicant:FOLEY, Michael JosephRespondent:FLYNN, PrestonRECORDED:11:45 15 October 2012WithdrawnWarden's Determination:Finalised 07/03/2013 10:30:00WITHDRAWN:10:30 07 March 2013 |
Application to Amend | 409700 | Lodged:15:50 05 November 2012Amending:AddressFrom:FLYNN, Preston, PO BOX 1109, CLAREMONT, WA, 6910To:FLYNN, Preston, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES, PO BOX 8249, PERTH, WA, 6849RECORDED:15:50 05 November 2012 |
Fine | 411443 | Fine in respect to:Forfeiture Process 406041Fine reason:Non-compliance with expenditure obligationsPenalty amount:$480.00Notification date:22/11/2012Due date:28/12/2012Pursuant to:Section 96A(5)RECORDED:22 November 2012PAYMENT RECEIVED:29 November 2012Receipt Number:06-118017Amount:$480.00Remaining balance:$0.00FINALISED:29 November 2012 |
Copy Document | 418308 | Lodged:11:50 06 March 2013In lieu of original declared lost.REJECTED:11:50 06 March 2013 |
Caveat | 422639 | Lodged:14:00:11 07 May 2013Caveat Type:Absolute CaveatCaveator:3D RESOURCES LTDShares Caveated:75/100 shares FLYNN, PrestonRECORDED:14:00:11 07 May 2013WITHDRAWN:09:30 08 May 2013 |
Application to Amend | 422727 | Lodged:09:30 08 May 2013Amending:AddressFrom:3D RESOURCES LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, WA, 6849To:3D RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:09:30 08 May 2013 |
Copy Document | 422728 | Lodged:09:30 08 May 2013REJECTED:09:30 08 May 2013 |
Withdrawal of Dealing | 422729 | Lodged:09:30 08 May 2013In respect to:Caveat 422639RECORDED:09:30 08 May 2013 |
Application to Amend | 478401 | Lodged:13:30 04 December 2015Amending:AddressFrom:FOLEY, Michael Joseph, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:FOLEY, Michael Joseph, 9 NEVILLE ROAD, DALKEITH, WA, 6009RECORDED:13:30 04 December 2015 |
Application for Forfeiture | 481006 | Lodged:14:40 01 February 2016Applicant:TODD, Michael LawrenceRespondent:FOLEY, Michael Joseph, 3D RESOURCES LTDRECORDED:14:40 01 February 2016Warden LemmonWarden's Determination:Dismissed 12/04/2016 14:15:00 |
Extension / Renewal of Term | 488033 | Lodged:11:41:42 08 June 2016Applied For Period:5 YearsRECORDED:11:41:42 08 June 2016GRANTED:27 September 2016Granted Period:5 YearsTerm Extended To:09/06/2021 |
Application to Amend | 501840 | Lodged:15:30 28 February 2017Amending:Total Shares/Holder Share Ratio ChangeFrom:FOLEY, Michael Joseph 25 / 100To:FOLEY, Michael Joseph 250 / 1000From:3D RESOURCES LTD 75 / 100To:3D RESOURCES LTD 750 / 1000Amending:Other/Non-title changesRECORDED:15:30 28 February 2017From: Foley Michael Joseph - 25/100
3D Resources Ltd - 75/100
To: Foley Michael Joseph - 250/100
3D Resources Ltd - 750/100 |
Partial Surrender - Compulsory | 508016 | Lodged:12:04:15 09 June 2017Section:Section 65 (3)Surrendered Blocks:WILUNA 3346 e, k, p, u
WILUNA 3347 a, b, c, d, f, g, h, j, l, m, n, o, q, r, s, t
WILUNA 3419 t, u, x, y, z
KALGOORLIE 35 d, e, tSurrendered Total:28 BL.REGISTERED:Midnight 09 June 2017Surrendered area to be released 08:30:00 04/07/2017 under Section 65 (3)Surrendered area released 08:30:00 04/07/2017 under Section 65 (3) |
Extension of Time | 513814 | Lodged:14:32:04 04 September 2017Type:Stat DecRECORDED:14:32:04 04 September 2017APPROVED:15:59:34 20 September 2017Time to lodge extended to 22 Sep 2017 |
Extension of Time | 515116 | Lodged:15:39:51 22 September 2017Type:Stat DecRECORDED:15:39:51 22 September 2017APPROVED:13:17:40 26 September 2017Time to lodge extended to 06 Oct 2017. |
Extension of Time | 562200 | Lodged:09:08:15 03 September 2019Type:Stat DecRECORDED:09:08:15 03 September 2019APPROVED:11:36:45 12 September 2019Time to lodge extended to 27 Sep 2019 |
Application for Forfeiture | 566061 | Lodged:10:46 05 November 2019Applicant:PETERS, GregoryRespondent:FOLEY, Michael Joseph, 3D RESOURCES LTDRECORDED:10:46 05 November 2019By consent of the parties the Warden on 09/07/2020 ordered the dismissal of the Application for Forfeiture with no orders for costWarden's Determination:Dismissed 09/07/2020 14:30:00 |
Application to Amend | 573982 | Lodged:08:30 11 March 2020Amending:Address (Including DTC Details)From:FOLEY, Michael Joseph, 9 NEVILLE ROAD, DALKEITH, WA, 6009To:FOLEY, Michael Joseph, U12-15 LANTANA AVENUE, MOUNT CLAREMONT, WA, 6010RECORDED:08:30 11 March 2020 |
Application to Amend | 620854 | Lodged:15:09:05 21 April 2021Amending:NameFrom:COSMO GOLD PTY LTDTo:COSMO GOLD LIMITEDRECORDED:15:09:05 21 April 2021 |
Application to Amend | 621697 | Lodged:11:28:16 04 May 2021Amending:Address (Including DTC Details)From:Principal Place of Business : COSMO GOLD LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400 and DTC :COSMO GOLD LIMITED, COSMO GOLD PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400To:Principal Place of Business : COSMO GOLD LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxx400 and DTC :COSMO GOLD LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxx400RECORDED:11:28:16 04 May 2021 |
Plaint | 623815 | Lodged:11:55 01 June 2021Plaintiffs:HARRINGTON-SMITH, RonaldSeeking:That the Cosmo Gold Cosmo Newberry project be given to PlaintiffRespondents:COSMO GOLD LIMITEDRECORDED:11:55 01 June 2021Warden's Determination:Dismissed 10:30 05 January 2022Warden confirmed oral decision made on 30/11/2021 at the 05 January 2022 Wardens Court and the Plaint was dismissed. |
Extension / Renewal of Term | 625881 | Lodged:11:09:49 09 June 2021Applied For Period:2 YearsRECORDED:11:09:49 09 June 2021GRANTED:17 November 2021Granted Period:2 YearsTerm Extended To:09/06/2023 |
Application for Forfeiture | 628394 | Lodged:11:10 19 July 2021Applicant:PETERS, RobynRespondent:FOLEY, Michael Joseph, COSMO GOLD LIMITEDRECORDED:11:10 19 July 2021Warden's Determination:Withdrawn 19/05/2022 10:00:00 |
Objection | 630495 | Lodged:11:40 17 August 2021Objectors:PETERS, Robyn VictoriaObjection Type:Exemption From ExpenditureRECORDED:11:40 17 August 2021WITHDRAWN:10:00 19 May 2022Wardens Decision Made on:10:00 19 May 2022Wardens Decision Status:Dismissed |
Objection | 631028 | Lodged:12:45 23 August 2021Objectors:HARRINGTON-SMITH, RonObjection Type:Exemption From ExpenditureRECORDED:12:45 23 August 2021WITHDRAWN:11:28:21 20 May 2022Wardens Decision Made on:11:25:38 20 May 2022Wardens Decision Status:DismissedWardens Decision Text:By the consent of the Parties, The Perth Mining Warden made the following orders:
1. The Objection be dismissed.
2.There be no order as to costs.Warden:CLEARY |
Objection | 631675 | Lodged:11:45 01 September 2021Objectors:FOLEY, Michael JosephObjection Type:Exemption From ExpenditureRECORDED:11:45 01 September 2021FINALISED:10:00 21 September 2022Wardens Decision Made on:10:00 21 September 2022Wardens Decision Status:DismissedWardens Decision Text:Exemptions recommended for grant.
Objections dismissed.
See 2022 WAMW 21Warden:Cleary |
Application for Forfeiture | 637038 | Lodged:08:30 07 December 2021Applicant:FOLEY, Michael JosephRespondent:COSMO GOLD LIMITEDRECORDED:08:30 07 December 2021Warden's Determination:Dismissed 21/10/2022 11:29:55For Application for Forfeiture 637038, 631110 & 631111.1. The Applications for Forfeiture are dismissed.2.There is no order as to costs, the application for costs being dismissed.3.The question of an order banning Mr.Foley from taking further actions regarding the tenements in the Wardens Court is adjourned to 18 November 2022.Warden:CLEARY |
Appeal | 637997 | Lodged:13:45:40 20 December 2021RECORDED:13:45:40 20 December 2021 |
Application for Forfeiture | 640836 | Lodged:15:35 04 February 2022Applicant:LAUNDER, MatthewRespondent:FOLEY, Michael Joseph, COSMO GOLD LIMITEDRECORDED:15:35 04 February 2022Warden's Determination:Dismissed 19/05/2022 10:00:00Warden:Cleary |
Extension / Renewal of Term | 677972 | Lodged:15:19:20 07 June 2023Applied For Period:2 YearsRECORDED:15:19:20 07 June 2023GRANTED:28 September 2023Granted Period:2 YearsTerm Extended To:09/06/2025 |