Extracted from MTO on 01-Jul-2025 00:37,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 05-Oct-2010 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 05-Oct-2010 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Oct-2010 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Oct-2010 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Oct-2010 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Oct-2010 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 05-Oct-2010 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 05-Oct-2010 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 05-Oct-2010 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 05-Oct-2010 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 05-Oct-2010 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 05-Oct-2010 | |
Type | Number | Details |
Application to Amend | 400992 | Lodged:14:05 06 July 2012Amending:AddressFrom:PIONEER RESOURCES LIMITED, PO BOX 1787, WEST PERTH, WA, 6872To:PIONEER RESOURCES LIMITED, C/- GPO BOX 2567, PERTH, WA, 6001RECORDED:14:05 06 July 2012 |
Mortgage | 402166 | Lodged:12:30 24 July 2012Mortgaged Shares:100/100 shares CARRICK GOLD LIMITEDMortgagee:PIONEER RESOURCES LIMITEDREGISTERED:12:30 24 July 2012DISCHARGED:15:40 20 November 2014Full Discharge:458061 Registered 15:40 20 November 2014 |
Application to Amend | 408199 | Lodged:13:25 16 October 2012Amending:NameFrom:CARRICK GOLD LIMITEDTo:KALNORTH GOLD MINES LIMITEDRECORDED:13:25 16 October 2012 |
Application to Amend | 432040 | Lodged:15:20 26 September 2013REJECTED:15:20 26 September 2013 |
Application to Amend | 441904 | Lodged:15:51 11 March 2014Amending:AddressFrom:KALNORTH GOLD MINES LIMITED, GPO BOX 2567, PERTH, WA, 6001To:KALNORTH GOLD MINES LIMITED, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433RECORDED:15:51 11 March 2014 |
Mortgage - Discharge | 458061 | Lodged:15:40 20 November 2014In respect to:Mortgage 402166REGISTERED:15:40 20 November 2014 |
Application to Amend | 458396 | Lodged:15:45 28 November 2014Amending:AddressFrom:KALNORTH GOLD MINES LIMITED, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433To:KALNORTH GOLD MINES LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849RECORDED:15:45 28 November 2014 |
Amalgamation | 459619 | Lodged:15:45 18 December 2014E27/242 - Amalgamation of portions of former P27/1892 and Mining Leases 27/247 - 27/340 and the whole of P27/1893 situated within the external boundaries of the licence.- |
Extension / Renewal of Term | 474259 | Lodged:13:47:06 11 September 2015Applied For Period:5 YearsRECORDED:13:47:06 11 September 2015GRANTED:27 November 2015Granted Period:5 YearsTerm Extended To:04/10/2020 |
Application to Amend | 490162 | Lodged:11:01:03 07 July 2016Amending:Address (Including DTC Details)From:PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:11:01:03 07 July 2016 |
Application to Amend | 554340 | Lodged:15:35 21 May 2019Amending:Address (Including DTC Details)From:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, SAME AS CORRESPONDENCE and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977RECORDED:15:35 21 May 2019 |
Expiry - Full | 588422 | EFFECTIVE:Midnight 04 October 2020 |