Extracted from MTO on 01-Jul-2025 00:18,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 11-Feb-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Feb-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Feb-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Feb-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Feb-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 11-Feb-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Feb-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Feb-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Feb-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Feb-2019 | |
Type | Number | Details |
Application to Amend | 584568 | Lodged:12:40 20 August 2020Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDEN RIDGE NORTH KAMBALDA PTY LTD, PO BOX 1787, WEST PERTH, WA, 6872, xxxxxx@pioresources.com.au, xxxxx974 and DTC :GOLDEN RIDGE NORTH KAMBALDA PTY LTD, DAVID CROOK, PO BOX 1787, WEST PERTH, WA, 6872, xxxxxx@pioresources.com.au, xxxxx974To:Principal Place of Business : GOLDEN RIDGE NORTH KAMBALDA PTY LTD, GROUND FLOOR, 72 KINGS PARK ROAD, WEST PERTH, WA, 6005 and DTC :GOLDEN RIDGE NORTH KAMBALDA PTY LTD, PO BOX 1787, WEST PERTH, WA, 6872RECORDED:12:40 20 August 2020 |
Application to Amend | 629691 | Lodged:12:03:53 05 August 2021Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDEN RIDGE NORTH KAMBALDA PTY LTD, GROUND FLOOR, 72 KINGS PARK ROAD, WEST PERTH, WA, 6005 and DTC :GOLDEN RIDGE NORTH KAMBALDA PTY LTD, PO BOX 1787, WEST PERTH, WA, 6872To:Principal Place of Business : GOLDEN RIDGE NORTH KAMBALDA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxx997 and DTC :GOLDEN RIDGE NORTH KAMBALDA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxx997RECORDED:12:03:53 05 August 2021 |
Extension / Renewal of Term | 695320 | Lodged:15:15:37 30 January 2024Applied For Period:5 YearsRECORDED:15:15:37 30 January 2024GRANTED:10 April 2024Granted Period:5 YearsTerm Extended To:10/02/2029 |