Extracted from MTO on 08-Mar-2021 03:48,
last changed 11-Feb-2021.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 15-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Mar-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Mar-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Mar-2019 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licence 26/241 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 15-Mar-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 15-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 15-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 15-Mar-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 15-Mar-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 15-Mar-2019 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licence 26/241 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 15-Mar-2019 | |
Type | Number | Details |
Objection | 509586 | Lodged:10:52:37 03 July 2017Objectors:MINCOR RESOURCES NL, VIEW NICKEL PTY LTDObjection Type:Tenement ApplicationRECORDED:10:52:37 03 July 2017WITHDRAWN:10:00 03 July 2018Wardens Decision Made on:10:00 03 July 2018Wardens Decision Status:FinalisedWardens Decision Text:Withdrawn by Minute of Programming Directions by Consent |
Application to Amend | 523745 | Lodged:12:04:26 15 February 2018Amending:Address (Including DTC Details)From:HBJ MINERALS PTY LTD, C/- WESTGOLD RESOURCES PTY LTD, LEVEL 3, 18-32 PARLIAMENT PLACE, WEST PERTH, WA, 6005, xxxxxxxxx@westgold.com.au, xxxxxx400To:HBJ MINERALS PTY LTD, C/- WESTGOLD RESOURCES LIMITED, PO BOX 7068, CLOISTERS SQUARE, WA, 6850, xxxxxxxxxx@westgold.com.au, xxxxxxx400RECORDED:12:04:26 15 February 2018 |
Application to Amend | 526882 | Lodged:08:30 03 April 2018Amending:Address (Including DTC Details)From:Principal Place of Business : HBJ MINERALS PTY LTD, C/- WESTGOLD RESOURCES LIMITED, PO BOX 7068, CLOISTERS SQUARE, WA, 6850, xxxxxxxxxx@westgold.com.au, xxxxxxx400 and DTC :HBJ MINERALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400To:Principal Place of Business : HBJ MINERALS PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxx@nsrltd.com, xxxxxx610 and DTC :HBJ MINERALS PTY LTD, NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxx@nsrltd.com, xxxxxx610RECORDED:08:30 03 April 2018 |
Application to Amend | 531795 | Lodged:09:49:59 05 June 2018Amending:NameFrom:HBJ MINERALS PTY LTDTo:NORTHERN STAR (HBJ) PTY LTDRECORDED:09:49:59 05 June 2018 |