Extracted from MTO on 08-Jul-2025 00:59,
last changed 30-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Jan-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Jan-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-Jan-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-Jan-2017 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 22-Jul-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Jan-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Jan-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-Jan-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-Jan-2017 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 22-Jul-2020 | |
Type | Number | Details |
Forfeiture | 528083 | Initiated:18/04/2018 for non-compliance with reporting requirements( Form 5 )RECORDED:15:55:15 16 April 2018Notice Issued:Regulation 50 Notice sent 18/04/2018 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:23/05/2018FINALISED:Order by Minister on 31 May 2018 that E 26/191 be Penalty Imposed |
Fine | 531647 | Fine in respect to:Forfeiture Process 528083Fine reason:Non-compliance with expenditure obligationsPenalty amount:$540.00Notification date:12/06/2018Due date:16/07/2018Pursuant to:Section 96A(5)RECORDED:01 June 2018PAYMENT RECEIVED:15 June 2018FINALISED:15 June 2018Receipt Number:EFTAmount:$540.00Remaining balance:$0.00 |
Application to Amend | 535459 | Lodged:16:07:21 19 July 2018Amending:Address (Including DTC Details)From:HADDISON PTY LTD, 27 CLEAVER STREET, WEST PERTH, WA, 6005To:HADDISON PTY LTD, WESTERN TENEMENT SERVICES, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892, xxxxx@wts.net.au, xxxxxxx111RECORDED:16:07:21 19 July 2018 |
Extension of Time | 573600 | Lodged:13:36:08 06 March 2020Type:Form 5RECORDED:13:36:08 06 March 2020Time to lodge form 5 for YE 2020 extended up until COB 03 March 2020APPROVED:16:00:14 06 March 2020 |
Excess Tonnage | 577804 | Lodged:13:50 07 May 2020RECORDED:13:50 07 May 2020Additional 9,000 tonnes grantedGRANTED:11:26 26 June 2020 |
Surrender - Outright | 632728 | Lodged:16:13:23 20 September 2021REGISTERED:16:13:23 20 September 2021 |