1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Nov-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 26/18, 26/204, 26/247, 26/261 and 26/269 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 07-Nov-2016 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Water Pipline Corridor 51414. | 07-Nov-2016 | |
7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 16-May-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Nov-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 26/18, 26/204, 26/247, 26/261 and 26/269 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 07-Nov-2016 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Water Pipline Corridor 51414. | 07-Nov-2016 | |
7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 16-May-2018 | |
Type | Number | Details |
Objection | 454495 | Lodged:09:48:53 11 September 2014Objectors:BARRICK (AUSTRALIA PACIFIC) LIMITED, KALGOORLIE LAKE VIEW PTY LTDObjection Type:Tenement ApplicationRECORDED:09:48:53 11 September 2014WITHDRAWN:11:14:40 01 July 2015Wardens Decision Made on:00:00 29 June 2015Wardens Decision Status:FinalisedWardens Decision Text:Objection 454495 - Withdrawn as per correspondence dated 19/06/2015 as access deed reached. |
Objection | 455050 | Lodged:11:00:53 22 September 2014Objectors:BELLAMEL MINING PTY LTDObjection Type:Tenement ApplicationRECORDED:11:00:53 22 September 2014WITHDRAWN:00:00 18 May 2016Wardens Decision Made on:00:00 18 May 2016Wardens Decision Status:FinalisedWardens Decision Text:Objection Withdrawn |
Objection | 455051 | Lodged:11:06:10 22 September 2014Objectors:PADDINGTON GOLD PTY LIMITEDObjection Type:Tenement ApplicationRECORDED:11:06:10 22 September 2014WITHDRAWN:00:00 18 May 2016Wardens Decision Made on:00:00 18 May 2016Wardens Decision Status:FinalisedWardens Decision Text:Objection Withdrawn |
Objection | 455052 | Lodged:11:09:55 22 September 2014Objectors:NORTON GOLD FIELDS LIMITEDObjection Type:Tenement ApplicationRECORDED:11:09:55 22 September 2014FINALISED:00:00 18 May 2016Wardens Decision Made on:00:00 18 May 2016Wardens Decision Status:FinalisedWardens Decision Text:Objection Withdrawn |
Conversion | 549182 | New Tenement:M 26/849Application Date:10:52:28 12 Mar 2019Section:S67Converted 00:00 25 May 2023 being commencement of term of M 26/849 |
Extension / Renewal of Term | 634704 | Lodged:14:13:58 26 October 2021Applied For Period:5 YearsRECORDED:14:13:58 26 October 2021GRANTED:08 March 2022Granted Period:5 YearsTerm Extended To:06/11/2026 |
Application to Amend | 665693 | Lodged:12:13:46 16 December 2022Amending:Address (Including DTC Details)From:Principal Place of Business : FIRST AU LIMITED, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxx688 and DTC :FIRST AU LIMITED, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxx688To:Principal Place of Business : FIRST AU LIMITED, C/- AUSTRALIAN MINING & EXPLORATION TITLE SERVICES PTY LTD, PO BOX 40, DUNCRAIG, WA, 6023, xx@amets.com.au, xxxxxxxxx853 and DTC :FIRST AU LIMITED, TENEMENT MANAGER, C/- AUSTRALIAN MINING & EXPLORATION TITLE SERVICES PTY LTD, PO BOX 40, DUNCRAIG, WA, 6023, xx@amets.com.au, xxxxxxxxx853RECORDED:12:13:46 16 December 2022 |
Expiry - Partial | 676889 | Expired Land:Portion contained within Kalgoorlie 2321 cRetained Blocks:KALGOORLIE 2249 w
KALGOORLIE 2321 a, b, hRetained Total:4 BL.EFFECTIVE:00:00 25 May 2023 |