Extracted from MTO on 13-Jul-2025 01:36,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 29-Jan-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Jan-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Jan-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Jan-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Jan-2019 | |
6 | 1 | No mining on a strip of land 60 metres wide with the Trans Australian Railway Line as the centreline and no materials being deposited or machinery or buildings being erected on such strip of land. | 29-Jan-2019 | |
7 | 1 | Blasting operations being controlled so that no damage or injury can be caused by fly rock, concussion, vibration or other means. | 29-Jan-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 29-Jan-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Jan-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Jan-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Jan-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Jan-2019 | |
6 | 1 | No mining on a strip of land 60 metres wide with the Trans Australian Railway Line as the centreline and no materials being deposited or machinery or buildings being erected on such strip of land. | 29-Jan-2019 | |
7 | 1 | Blasting operations being controlled so that no damage or injury can be caused by fly rock, concussion, vibration or other means. | 29-Jan-2019 | |
Type | Number | Details |
Application to Amend | 591518 | Lodged:10:24:33 01 December 2020Amending:Address (Including DTC Details)From:Principal Place of Business : ARUMA EXPLORATION PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :ARUMA EXPLORATION PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : ARUMA EXPLORATION PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :ARUMA EXPLORATION PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:10:24:33 01 December 2020 |
Application to Amend | 638745 | Lodged:08:30 17 December 2021Amending:Address (Including DTC Details)From:Principal Place of Business : BLACK CAT (BULONG) PTY LTD, SUITE 5,16 NICHOLSON ROAD, SUBIACO, WA, 6008, xxxx@mmts.net.au, xxxxx997 and DTC :BLACK CAT (BULONG) PTY LTD, SUITE 5,16 NICHOLSON ROAD, SUBIACO, WA, 6008To:Principal Place of Business : BLACK CAT (BULONG) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxx997 and DTC :BLACK CAT (BULONG) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxx997RECORDED:08:30 17 December 2021 |
Application to Amend | 647332 | Lodged:12:39:48 14 April 2022Amending:NameFrom:BLACK CAT (BULONG) PTY LTDTo:BLACK CAT (KAL EAST) PTY LTDRECORDED:12:39:48 14 April 2022 |
Extension / Renewal of Term | 694443 | Lodged:09:53:15 19 January 2024Applied For Period:5 YearsRECORDED:09:53:15 19 January 2024GRANTED:04 April 2024Granted Period:5 YearsTerm Extended To:28/01/2029 |
Partial Surrender - Compulsory | 719978 | Lodged:10:14:35 21 November 2024Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2401 m, x
KALGOORLIE 2473 g, n, xSurrendered Total:5 BL.REGISTERED:Midnight 28 January 2025Surrendered area to be released 08:30:00 18/02/2025 under Section 65 (3)Surrendered area released 08:30:00 18/02/2025 under Section 65 (3) |