Extracted from MTO on 04-Jul-2025 00:56,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Reserve 195 Timber and Reserve 2972 Water. | 11-Aug-2017 | |
2 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 11-Aug-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Aug-2017 | |
4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Aug-2017 | |
5 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Aug-2017 | |
6 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Aug-2017 | |
7 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Aug-2017 | |
| 1 | Consent to explore on Majestic Timber Reserve R195/25 granted subject to the following conditions: | 08-Aug-2022 | |
8 | 1 | Mining related activities and measures to protect the environment being carried out in accordance with the document Black Cat Syndicate Limited - Majestic Timber Reserve - Conservation Management Plan - M25/360, P25/2248, P 25/2249, P25/2685, P25/2703, E25/558 Document No. BCSL-E-PLN-001, Revision 2, Dated 10/9/21 and retained on Department of Mines, Industry Regulation and Safety (DMIRS) numbered M25/360, P25/2248, P25/2249, P25/2685, P25/2703, E25/558. | 08-Aug-2022 | |
9 | 1 | At least five working days prior to accessing the reserve, the holder providing the relevant Regional Manager, DBCA with an itinerary and programme of the locations of operations on the licence area and informing at least five days in advance of any changes to that itinerary. All activities and movements shall comply with reasonable access and travel requirements of the Regional Manager, DBCA regarding seasonal/ ground conditions. | 08-Aug-2022 | |
10 | 1 | The Licensee submitting to the Executive Director, Resource and Environmental Compliance, DMIRS and to the relevant Regional Manager, DBCA annually and within a month of the anniversary of grant each year, a brief annual report outlining the project operations and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months.The report must include a map showing the location of all disturbances and rehabilitation activities that occurred during the reporting period. | 08-Aug-2022 | |
Cond # | Ver | Text | Start | End |
1 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Reserve 195 Timber and Reserve 2972 Water. | 11-Aug-2017 | |
2 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 11-Aug-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Aug-2017 | |
4 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Aug-2017 | |
5 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Aug-2017 | |
6 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Aug-2017 | |
7 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Aug-2017 | |
| 1 | Consent to explore on Majestic Timber Reserve R195/25 granted subject to the following conditions: | 08-Aug-2022 | |
8 | 1 | Mining related activities and measures to protect the environment being carried out in accordance with the document Black Cat Syndicate Limited - Majestic Timber Reserve - Conservation Management Plan - M25/360, P25/2248, P 25/2249, P25/2685, P25/2703, E25/558 Document No. BCSL-E-PLN-001, Revision 2, Dated 10/9/21 and retained on Department of Mines, Industry Regulation and Safety (DMIRS) numbered M25/360, P25/2248, P25/2249, P25/2685, P25/2703, E25/558. | 08-Aug-2022 | |
9 | 1 | At least five working days prior to accessing the reserve, the holder providing the relevant Regional Manager, DBCA with an itinerary and programme of the locations of operations on the licence area and informing at least five days in advance of any changes to that itinerary. All activities and movements shall comply with reasonable access and travel requirements of the Regional Manager, DBCA regarding seasonal/ ground conditions. | 08-Aug-2022 | |
10 | 1 | The Licensee submitting to the Executive Director, Resource and Environmental Compliance, DMIRS and to the relevant Regional Manager, DBCA annually and within a month of the anniversary of grant each year, a brief annual report outlining the project operations and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitation programmes for the next 12 months.The report must include a map showing the location of all disturbances and rehabilitation activities that occurred during the reporting period. | 08-Aug-2022 | |
Type | Number | Details |
Application to Amend | 591518 | Lodged:10:24:33 01 December 2020Amending:Address (Including DTC Details)From:Principal Place of Business : ARUMA EXPLORATION PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400 and DTC :ARUMA EXPLORATION PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400To:Principal Place of Business : ARUMA EXPLORATION PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :ARUMA EXPLORATION PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:10:24:33 01 December 2020 |
Application to Amend | 638745 | Lodged:08:30 17 December 2021Amending:Address (Including DTC Details)From:Principal Place of Business : BLACK CAT (BULONG) PTY LTD, SUITE 5,16 NICHOLSON ROAD, SUBIACO, WA, 6008, xxxx@mmts.net.au, xxxxx997 and DTC :BLACK CAT (BULONG) PTY LTD, SUITE 5,16 NICHOLSON ROAD, SUBIACO, WA, 6008To:Principal Place of Business : BLACK CAT (BULONG) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxx997 and DTC :BLACK CAT (BULONG) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxx997RECORDED:08:30 17 December 2021 |
Application to Amend | 647332 | Lodged:12:39:48 14 April 2022Amending:NameFrom:BLACK CAT (BULONG) PTY LTDTo:BLACK CAT (KAL EAST) PTY LTDRECORDED:12:39:48 14 April 2022 |
Extension / Renewal of Term | 653631 | Lodged:10:55:07 18 July 2022Applied For Period:5 YearsRECORDED:10:55:07 18 July 2022GRANTED:10 October 2022Granted Period:5 YearsTerm Extended To:10/08/2027 |
Partial Surrender - Compulsory | 682099 | Lodged:09:17:17 26 July 2023Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2472 x, y, z
KALGOORLIE 2473 vSurrendered Total:4 BL.REGISTERED:Midnight 10 August 2023Surrendered area to be released 08:30:00 26/10/2023 under Section 65 (3)Surrendered area released 08:30:00 26/10/2023 under Section 65 (3) |