Extracted from MTO on 11-Jul-2025 01:36,
last changed 27-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Apr-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Apr-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Apr-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Apr-2017 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Apr-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Apr-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Apr-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Apr-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Apr-2017 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Apr-2017 | |
Type | Number | Details |
Excess Tonnage | 506869 | Lodged:10:00 19 May 2017RECORDED:10:00 19 May 2017GRANTED:09:43:35 24 May 2017 |
Application to Amend | 591518 | Lodged:10:24:33 01 December 2020Amending:Address (Including DTC Details)From:Principal Place of Business : ARUMA EXPLORATION PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxx400 and DTC :ARUMA EXPLORATION PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxx400To:Principal Place of Business : ARUMA EXPLORATION PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :ARUMA EXPLORATION PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:10:24:33 01 December 2020 |
Application to Amend | 638745 | Lodged:08:30 17 December 2021Amending:Address (Including DTC Details)From:Principal Place of Business : BLACK CAT (BULONG) PTY LTD, SUITE 5,16 NICHOLSON ROAD, SUBIACO, WA, 6008, xxxx@mmts.net.au, xxxxx997 and DTC :BLACK CAT (BULONG) PTY LTD, SUITE 5,16 NICHOLSON ROAD, SUBIACO, WA, 6008To:Principal Place of Business : BLACK CAT (BULONG) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxx997 and DTC :BLACK CAT (BULONG) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxx997RECORDED:08:30 17 December 2021 |
Extension / Renewal of Term | 642518 | Lodged:14:16:56 02 March 2022Applied For Period:5 YearsRECORDED:14:16:56 02 March 2022GRANTED:25 May 2022Granted Period:5 YearsTerm Extended To:02/04/2027 |
Application to Amend | 647332 | Lodged:12:39:48 14 April 2022Amending:NameFrom:BLACK CAT (BULONG) PTY LTDTo:BLACK CAT (KAL EAST) PTY LTDRECORDED:12:39:48 14 April 2022 |
Partial Surrender - Compulsory | 671771 | Lodged:10:21:29 27 March 2023Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2327 o, t, y, z
KALGOORLIE 2328 c, g, h, n, w, xSurrendered Total:10 BL.REGISTERED:Midnight 02 April 2023Surrendered area to be released 08:30:00 20/04/2023 under Section 65 (3)Surrendered area released 08:30:00 20/04/2023 under Section 65 (3) |
Surrender - Outright | 731972 | Lodged:15:37:49 28 April 2025REGISTERED:15:37:49 28 April 2025 |