Extracted from MTO on 30-Jun-2025 01:19,
last changed 30-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Nov-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 25/52 (if granted) being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 16-Nov-2016 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 20-May-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Nov-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 25/52 (if granted) being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 16-Nov-2016 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 20-May-2020 | |
Type | Number | Details |
Application to Amend | 486600 | Lodged:14:40 11 May 2016Amending:Address (Including DTC Details)From:BRIMSTONE RESOURCES LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD, WA, 6924To:BRIMSTONE RESOURCES LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892RECORDED:14:40 11 May 2016 |
Extension of Time | 571760 | Lodged:14:58:39 06 February 2020Type:Stat DecRECORDED:14:58:39 06 February 2020Extension of time to lodge Statutory Declaration in support of Form 18 YE 2019 extended up until COB 20 February 2020APPROVED:14:53:41 10 February 2020 |
Forfeiture | 580499 | Initiated:28/05/2020 for non-compliance with expenditure conditionsRECORDED:11:00 22 June 2020Notice Issued:Regulation 50 Notice sent 28/05/2020 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:02/07/2020FINALISED:Order by Minister on 06 October 2020 that E 25/547 be Penalty Imposed |
Fine | 587691 | Fine in respect to:Forfeiture Process 580499Fine reason:Non-compliance with expenditure obligationsPenalty amount:$931.00Notification date:07/10/2020Due date:11/11/2020Pursuant to:Section 96A(5)RECORDED:06 October 2020PAYMENT RECEIVED:02 November 2020FINALISED:02 November 2020Receipt Number:10170463Amount:$931.00Remaining balance:$0.00 |
Extension / Renewal of Term | 635795 | Lodged:08:30 15 November 2021Applied For Period:5 YearsRECORDED:08:30 15 November 2021LAPSED:04 March 2022 |
Extension of Time | 636705 | Lodged:14:56:22 29 November 2021Type:OtherRECORDED:14:56:22 29 November 2021APPROVED:15:25:15 29 November 2021Time to lodged extened to 13 December 2021 |
Surrender - Outright | 642703 | Lodged:11:54:37 04 March 2022REGISTERED:11:54:37 04 March 2022 |