1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Nov-2016 | |
5 | 1 | No interference with Geodetic Survey Station SSM-KURNALPI 41 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Nov-2016 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 18-Nov-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Nov-2016 | |
5 | 1 | No interference with Geodetic Survey Station SSM-KURNALPI 41 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 08-Nov-2016 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 18-Nov-2019 | |
Type | Number | Details |
Application to Amend | 486600 | Lodged:14:40 11 May 2016Amending:Address (Including DTC Details)From:BRIMSTONE RESOURCES LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 428, GREENWOOD, WA, 6924To:BRIMSTONE RESOURCES LTD, C/- WESTERN TENEMENT SERVICES, PO BOX 3285, EAST PERTH, WA, 6892RECORDED:14:40 11 May 2016 |
Caveat | 565446 | Lodged:15:30:37 24 October 2019Caveat Type:Consent CaveatCaveator:BRIMSTONE RESOURCES LTDShares Caveated:100/100 shares G & D MINE SERVICES PTY LTDRECORDED:15:30:37 24 October 2019 |
Application to Amend | 588614 | Lodged:11:26:10 21 October 2020Amending:Address (Including DTC Details)From:Principal Place of Business : G & D MINE SERVICES PTY LTD, 13 GATACRE DRIVE, SOMERVILLE, WA, 6430, xxxxx@gadmineservices.com, xxxxxxx332 and DTC :G & D MINE SERVICES PTY LTD, 13 GATACRE DRIVE, SOMERVILLE, WA, 6430, xxxxx@gadmineservices.com, xxxxxxx332To:Principal Place of Business : G & D MINE SERVICES PTY LTD, 25 HESTON COURT, KALGOORLIE, WA, 6430, xxxxxxx@bigpond.com, xxxxxxx792 and DTC :G & D MINE SERVICES PTY LTD, DAYNE BERETH, 25 HESTON COURT, KALGOORLIE, WA, 6430, xxxxxxx@bigpond.com, xxxxxxx792RECORDED:11:26:10 21 October 2020 |
Extension / Renewal of Term | 634942 | Lodged:14:25 29 October 2021Applied For Period:2 YearsRECORDED:14:25 29 October 2021GRANTED:11 January 2022Granted Period:5 YearsTerm Extended To:07/11/2026 |
Partial Surrender - Compulsory | 662881 | Lodged:14:12:35 08 November 2022Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2257 lSurrendered Total:1 BL.REJECTED:14:12:35 08 November 2022 |