1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Nov-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 09-Jan-2018 | |
6 | 1 | During any year that exploration activities are undertaken on the licence under an approved Programme of Works, the licensee is to submit to the Executive Director, Environment Division, DMIRS, in December of that year, a map and brief report that identifies the location of all disturbances and rehabilitation activities that have occurred on the tenement under the approved Programme(s) of Works. | 09-Jan-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Nov-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 09-Jan-2018 | |
6 | 1 | During any year that exploration activities are undertaken on the licence under an approved Programme of Works, the licensee is to submit to the Executive Director, Environment Division, DMIRS, in December of that year, a map and brief report that identifies the location of all disturbances and rehabilitation activities that have occurred on the tenement under the approved Programme(s) of Works. | 09-Jan-2018 | |
Type | Number | Details |
Application to Amend | 487945 | Lodged:09:31:07 07 June 2016Amending:Address (Including DTC Details)From:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831To:ANGLOGOLD ASHANTI AUSTRALIA LIMITED, WARREN STEWARD, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxxx660RECORDED:09:31:07 07 June 2016 |
Application to Amend | 513171 | Lodged:15:00 24 August 2017Amending:Address (Including DTC Details)From:Principal Place of Business : ANGLOGOLD ASHANTI AUSTRALIA LIMITED, SAME AS CORRESPONDENCE and DTC :ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831To:Principal Place of Business : ANGLOGOLD ASHANTI AUSTRALIA LIMITED, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxxxx660 and DTC :ANGLOGOLD ASHANTI AUSTRALIA LIMITED, WARREN STEWARD, PO BOX Z5046, PERTH, WA, 6831, xxxxxxxxxxxxxxxxxx@anglogoldashanti.com, xxxxxxxxx660RECORDED:15:00 24 August 2017 |
Extension / Renewal of Term | 635182 | Lodged:09:35:22 04 November 2021Applied For Period:5 YearsRECORDED:09:35:22 04 November 2021GRANTED:11 January 2022Granted Period:5 YearsTerm Extended To:06/11/2026 |
Surrender - Outright | 687282 | Lodged:11:20:42 05 October 2023REGISTERED:11:20:42 05 October 2023 |