Extracted from MTO on 06-Jul-2025 01:13,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 21-Sep-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-Sep-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 21-Sep-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 21-Sep-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 25/35 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 21-Sep-2016 | |
6 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 21-Sep-2016 | |
7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 27-Aug-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 21-Sep-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-Sep-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 21-Sep-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 21-Sep-2016 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 25/35 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 21-Sep-2016 | |
6 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 21-Sep-2016 | |
7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 27-Aug-2020 | |
Type | Number | Details |
Application to Amend | 523685 | Lodged:15:45:33 14 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : HBJ MINERALS PTY LTD, SAME AS CORRESPONDENCE and DTC :HBJ MINERALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : HBJ MINERALS PTY LTD, C/- WESTGOLD RESOURCES LIMITED, PO BOX 7068, CLOISTERS SQUARE, WA, 6850, xxxxxxxxxx@westgold.com.au, xxxxxxx400 and DTC :HBJ MINERALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:45:33 14 February 2018 |
Application to Amend | 526882 | Lodged:08:30 03 April 2018Amending:Address (Including DTC Details)From:Principal Place of Business : HBJ MINERALS PTY LTD, C/- WESTGOLD RESOURCES LIMITED, PO BOX 7068, CLOISTERS SQUARE, WA, 6850, xxxxxxxxxx@westgold.com.au, xxxxxxx400 and DTC :HBJ MINERALS PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : HBJ MINERALS PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxx@nsrltd.com, xxxxxx610 and DTC :HBJ MINERALS PTY LTD, NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxx@nsrltd.com, xxxxxx610RECORDED:08:30 03 April 2018 |
Application to Amend | 531795 | Lodged:09:49:59 05 June 2018Amending:NameFrom:HBJ MINERALS PTY LTDTo:NORTHERN STAR (HBJ) PTY LTDRECORDED:09:49:59 05 June 2018 |
Application to Amend | 569312 | Lodged:09:43:32 20 December 2019Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN STAR (HBJ) PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxx@nsrltd.com, xxxxxx610 and DTC :NORTHERN STAR (HBJ) PTY LTD, NORTHERN STAR RESOURCES LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxx@nsrltd.com, xxxxxx610To:Principal Place of Business : NORTHERN STAR (HBJ) PTY LTD, 163-167 STIRLING HIGHWAY, NEDLANDS, WA, 6009, xxxxxxxxxxxxxx@horizonminerals.com.au, xxxxxxx699 and DTC :NORTHERN STAR (HBJ) PTY LTD, BIANCA TAVEIRA, PO BOX 1104, NEDLANDS, WA, 6909, xxxxxxxxxxxxxx@horizonminerals.com.au, xxxxxxx699RECORDED:09:43:32 20 December 2019 |
Extension / Renewal of Term | 632273 | Lodged:11:20:52 14 September 2021Applied For Period:5 YearsRECORDED:11:20:52 14 September 2021GRANTED:19 November 2021Granted Period:5 YearsTerm Extended To:20/09/2026 |
Caveat | 648942 | Lodged:16:26:46 10 May 2022Caveat Type:Consent CaveatCaveator:METAL HAWK LIMITEDShares Caveated:100/100 shares BLACK MOUNTAIN GOLD LIMITEDRECORDED:16:26:46 10 May 2022WITHDRAWN:08:33:09 11 March 2025 |
Withdrawal of Dealing | 727923 | Lodged:08:33:09 11 March 2025In respect to:Caveat 648942RECORDED:08:33:09 11 March 2025 |