Cache entry for E 25/535

Extracted from MTO on 17-Sep-2021 04:46, last changed 10-Jul-2021.

Tenement Summary

Identifier:E 25/535Type:Exploration Licence
Status:LiveDistrict:BULONG
Lodged:ONLINEArea:8 BL
Purposes:Term:5 Years (Extended)
Markout:Received:21-Oct-2015 16:15
Commence:04-May-2016 Expiry:03-May-2026

Holders

Company NameSharesTotal Shares
RESOURCE HOLDINGS PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
RESOURCE HOLDINGS PTY LTD100100

Shires

Shire NameShire NumberStartArea
KALGOORLIE-BOULDER CITY428021-Oct-2015 8.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.04-May-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.04-May-2016
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.04-May-2016
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
04-May-2016
51The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Majestic Timber Reserve 195.04-May-2016
61All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.09-Mar-2021

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.04-May-2016
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.04-May-2016
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.04-May-2016
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
04-May-2016
51The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Majestic Timber Reserve 195.04-May-2016
61All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.09-Mar-2021

Dealings

TypeNumberDetails
Extension of Time534124Lodged:16:18:44 02 July 2018Type:Form 5RECORDED:16:18:44 02 July 2018APPROVED:10:36:54 05 July 2018Time extended until 6 July 18 for YE 2018.
Extension of Time583068Lodged:10:29:14 30 July 2020Type:Stat DecRECORDED:10:29:14 30 July 2020Replaced by 583106LAPSED:14:03:10 30 July 2020
Extension of Time583106Lodged:14:03:10 30 July 2020Type:Stat DecRECORDED:14:03:10 30 July 2020APPROVED:09:25:24 03 August 2020
Forfeiture590398Initiated:20/10/2020 for non-compliance with expenditure conditionsRECORDED:11:00 13 November 2020Notice Issued:Regulation 50 Notice sent 20/10/2020 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:24/11/2020FINALISED:Order by Minister on 21 December 2020 that E 25/535 be Penalty Imposed
Fine593072Fine in respect to:Forfeiture Process 590398Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,813.00Notification date:23/12/2020Due date:27/01/2021Pursuant to:Section 96A(5)RECORDED:23 December 2020PAYMENT RECEIVED:25 January 2021FINALISED:27 January 2021Receipt Number:10179653Amount:$1,813.00Remaining balance:$0.00
Extension / Renewal of Term621571Lodged:09:56:09 03 May 2021Applied For Period:5 YearsRECORDED:09:56:09 03 May 2021GRANTED:09 July 2021Granted Period:5 YearsTerm Extended To:03/05/2026

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202220-May-2021 10197573$2,600.008 BL04-May-2016 $2,600.00$0.00
Rental202129-May-2020 10147043$1,864.008 BL04-May-2016 $1,864.00$0.00
Rental202010-May-2019 10096009$688.008 BL04-May-2016 $1,760.00$0.00
Rental202012-Apr-2019 10092318$1,072.00
Rental201901-Jun-2018 EFT$1,072.008 BL04-May-2016 $1,072.00$0.00
Rental201826-May-2017 73918943608$1,036.008 BL04-May-2016 $1,036.00$0.00
Rental201721-Oct-2015 529419565182$1,002.008 BL04-May-2016 $1,002.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2022$50,000.00false
2021$30,000.0028-Jun-2021 $38,044.00$31,936.00$0.00$0.00$3,108.00$3,000.00$0.00false
2020$30,000.0002-Jul-2020 $11,864.0058132002-Jul-2020 $30,000.00Refused20-Oct-2020 $6,000.00$0.00$0.00$2,364.00$3,500.00$0.00false
2019$20,000.0002-Jul-2019 $22,670.00$18,500.00$0.00$0.00$1,170.00$3,000.00$0.00false
2018$20,000.0006-Jul-2018 $23,289.00$18,750.00$0.00$0.00$1,539.00$3,000.00$0.00false
2017$20,000.0030-Jun-2017 $21,094.00$16,500.00$0.00$0.00$1,594.00$3,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
26-Nov-2015 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-12-162016-04-16CLEARED - Expedited Applies2016-05-028 BL305625S121590E42km NE'ly of Kambalda13GoldfieldsNative Title Services Goldfields