Extracted from MTO on 27-Sep-2026 01:14,
last changed 25-Sep-2026.
| # | Ver | Text | Start | End |
| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-May-2015 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-May-2015 | |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-May-2015 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-May-2015 | |
| 5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-May-2015 | |
| 6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-May-2015 | |
| 7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 24-May-2017 | |
| Cond # | Ver | Text | Start | End |
| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-May-2015 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-May-2015 | |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-May-2015 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-May-2015 | |
| 5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-May-2015 | |
| 6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-May-2015 | |
| 7 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 24-May-2017 | |
| Type | Number | Details |
| Application to Amend | 501101 | Lodged:10:50 14 February 2017Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:10:50 14 February 2017 |
| Application to Amend | 503353 | Lodged:15:10 27 March 2017Amending:NameFrom:xxxxxxxxTo:xxxxxxxxAmending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:15:10 27 March 2017 |
| Application to Amend | 510367 | Lodged:15:04:25 12 July 2017Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:15:04:25 12 July 2017 |
| Extension of Time | 511334 | Lodged:15:57:22 26 July 2017Type:Form 5RECORDED:15:57:22 26 July 2017Time to lodge Form 5 extended to COB Friday 11 August 2017APPROVED:10:52:48 27 July 2017 |
| Extension / Renewal of Term | 578802 | Lodged:09:34:01 27 May 2020Applied For Period:5 YearsRECORDED:09:34:01 27 May 2020GRANTED:11 August 2020Granted Period:5 YearsTerm Extended To:28/05/2025 |
| Application to Amend | 666681 | Lodged:09:49:30 11 January 2023Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxREJECTED:09:49:30 11 January 2023 |
| Application to Amend | 676403 | Lodged:08:30 19 May 2023Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:08:30 19 May 2023 |
| Application to Amend | 676404 | Lodged:08:30 19 May 2023Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:08:30 19 May 2023 |
| Application to Amend | 716872 | Lodged:16:17:08 14 October 2024Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:16:17:08 14 October 2024 |
| Extension / Renewal of Term | 734374 | Lodged:08:30 27 May 2025Applied For Period:2 YearsRECORDED:08:30 27 May 2025GRANTED:08 August 2025Granted Period:2 YearsTerm Extended To:28/05/2027 |
| Application to Amend | 749335 | Lodged:10:16:37 22 December 2025Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:10:16:37 22 December 2025 |