| # | Ver | Text | Start | End |
| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-May-2015 | |
| 2 | 2 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 06-Nov-2025 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-May-2015 | 05-Nov-2025 |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-May-2015 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-May-2015 | |
| 5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-May-2015 | |
| 6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-May-2015 | |
| Cond # | Ver | Text | Start | End |
| 1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-May-2015 | |
| 2 | 2 | Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Petroleum and Exploration. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Mines, Petroleum and Exploration. | 06-Nov-2025 | |
| 2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 29-May-2015 | 05-Nov-2025 |
| 3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-May-2015 | |
| 4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-May-2015 | |
| 5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-May-2015 | |
| 6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-May-2015 | |
| Type | Number | Details |
| Excess Tonnage | 469703 | Lodged:00:00 19 June 2015RECORDED:00:00 19 June 2015GRANTED:13:38:57 19 June 2015For an additional four thousand (4,000) tonnes of material for the purpose of scraping, detecting and dry blowing activities. |
| Application to Amend | 495789 | Lodged:11:30 19 October 2016Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:11:30 19 October 2016 |
| Extension / Renewal of Term | 578804 | Lodged:09:51:47 27 May 2020Applied For Period:5 YearsRECORDED:09:51:47 27 May 2020GRANTED:11 August 2020Granted Period:5 YearsTerm Extended To:28/05/2025 |
| Application to Amend | 666681 | Lodged:09:49:30 11 January 2023Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxREJECTED:09:49:30 11 January 2023 |
| Application to Amend | 676403 | Lodged:08:30 19 May 2023Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:08:30 19 May 2023 |
| Application to Amend | 676404 | Lodged:08:30 19 May 2023Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:08:30 19 May 2023 |
| Application to Amend | 716872 | Lodged:16:17:08 14 October 2024Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:16:17:08 14 October 2024 |
| Extension / Renewal of Term | 734367 | Lodged:08:30 27 May 2025Applied For Period:2 YearsRECORDED:08:30 27 May 2025GRANTED:28 July 2025Granted Period:2 YearsTerm Extended To:28/05/2027 |
| Application to Amend | 749335 | Lodged:10:16:37 22 December 2025Amending:Address (Including DTC Details)From:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxTo:xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxRECORDED:10:16:37 22 December 2025 |