Extracted from MTO on 06-Jul-2025 00:37,
last changed 05-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 02-Feb-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 02-Feb-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 02-Feb-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 02-Feb-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 02-Feb-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 02-Feb-2015 | |
7 | 1 | No interference with Geodetic Survey Station SSM-KURN 75 and SSM-KURN 76 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 02-Feb-2015 | |
8 | 1 | During any year that prospecting activities are undertaken on the Licence under an approved Programme of Works, the Licensee is to submit to the Executive Director, Environment Division, DMP, in December of that year, a map and brief report that identifies the location of all disturbances and rehabilitation activities that have occurred on the tenement under the approved Programme(s) of Works. | 22-Dec-2016 | 09-May-2022 |
9 | 1 | Exploration and prospecting activities are to be managed to ensure that no more than two hectares of disturbance may be undertaken at any time without progressive rehabilitation. | 22-Dec-2016 | 09-May-2022 |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 02-Feb-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 02-Feb-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 02-Feb-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 02-Feb-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 02-Feb-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 02-Feb-2015 | |
7 | 1 | No interference with Geodetic Survey Station SSM-KURN 75 and SSM-KURN 76 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 02-Feb-2015 | |
8 | 1 | During any year that prospecting activities are undertaken on the Licence under an approved Programme of Works, the Licensee is to submit to the Executive Director, Environment Division, DMP, in December of that year, a map and brief report that identifies the location of all disturbances and rehabilitation activities that have occurred on the tenement under the approved Programme(s) of Works. | 22-Dec-2016 | 09-May-2022 |
9 | 1 | Exploration and prospecting activities are to be managed to ensure that no more than two hectares of disturbance may be undertaken at any time without progressive rehabilitation. | 22-Dec-2016 | 09-May-2022 |
Type | Number | Details |
Application to Amend | 453694 | Lodged:10:35 27 August 2014Amending:NameFrom:EDWARDS, CranstonTo:EDWARDS, Cranston GilbertRECORDED:10:35 27 August 2014 |
Excess Tonnage | 477723 | Lodged:08:30 30 June 2015RECORDED:08:30 30 June 2015REFUSED:08:30 23 March 2016 |
Excess Tonnage | 491793 | Lodged:08:30 24 June 2016RECORDED:08:30 24 June 2016GRANTED:09:29:25 13 December 2016Approved for additional 100,000 tonnes. |
Extension / Renewal of Term | 570815 | Lodged:15:03:05 23 January 2020Applied For Period:5 YearsRECORDED:15:03:05 23 January 2020GRANTED:03 April 2020Granted Period:5 YearsTerm Extended To:01/02/2025 |
Application to Amend | 647332 | Lodged:12:39:48 14 April 2022Amending:NameFrom:BLACK CAT (BULONG) PTY LTDTo:BLACK CAT (KAL EAST) PTY LTDRECORDED:12:39:48 14 April 2022 |
Amalgamation | 688552 | Lodged:16:22:06 24 October 2023Amalgamating:Whole of P 25/2674Situated within:External boundaries of E 25/512Granted 19/04/2024 in respect to P 25/2674 |
Extension / Renewal of Term | 724463 | Lodged:14:49:56 28 January 2025Applied For Period:2 YearsRECORDED:14:49:56 28 January 2025GRANTED:02 May 2025Granted Period:2 YearsTerm Extended To:01/02/2027 |