# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 12-Dec-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Dec-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Dec-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Dec-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Dec-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Dec-2013 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained, with the concurrence of the Minister for Environment, before entering or commencing any prospecting or exploration activity on Randall Timber Reserve 194 | 22-Jan-2015 | 18-Jan-2018 |
| 1 | Consent to explore on Randell Timber Reserve 194 granted subject to the following conditions: | 18-Jan-2018 | |
8 | 1 | Exploration and related activities and measures to protect the environment being carried out in accordance with the Conservation Management Plan document entitled "Conservation Management Plan for Exploration and Prospecting in the Randell Timber Reserve E25/474, E25/497, E25/551" dated 12 November 2017 and retained on Department of Mines, Industry Regulation and Safety's (DMIRS) files numbered E25/474, E25/497 and E25/551. | 18-Jan-2018 | |
9 | 1 | At least five working days prior to accessing the reserve area, the licensee is to provide the relevant Regional Manager, Department of Biodiversity, Conservation and Attractions (DBCA) with an itinerary and program of the locations of operations on the licence area and informing at least five days in advance of any changes to that itinerary. All activities and movements shall comply with reasonable access and travel requirements of the relevant Regional Manager, DBCA regarding seasonal/ground conditions. | 18-Jan-2018 | |
10 | 1 | The licensee submitting to the Director, Environment, Department of Mines, Industry Regulation and Safety and to the relevant Regional Manager, DBCA annually within a month of the anniversary of grant in each year, a brief report outlining the operations and rehabilitation work undertaken in the previous 12 months and any proposed operations and rehabilitation work for the next 12 months. The report must include a map showing the location of all disturbances. | 18-Jan-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 12-Dec-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Dec-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Dec-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Dec-2013 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Dec-2013 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Dec-2013 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained, with the concurrence of the Minister for Environment, before entering or commencing any prospecting or exploration activity on Randall Timber Reserve 194 | 22-Jan-2015 | 18-Jan-2018 |
| 1 | Consent to explore on Randell Timber Reserve 194 granted subject to the following conditions: | 18-Jan-2018 | |
8 | 1 | Exploration and related activities and measures to protect the environment being carried out in accordance with the Conservation Management Plan document entitled "Conservation Management Plan for Exploration and Prospecting in the Randell Timber Reserve E25/474, E25/497, E25/551" dated 12 November 2017 and retained on Department of Mines, Industry Regulation and Safety's (DMIRS) files numbered E25/474, E25/497 and E25/551. | 18-Jan-2018 | |
9 | 1 | At least five working days prior to accessing the reserve area, the licensee is to provide the relevant Regional Manager, Department of Biodiversity, Conservation and Attractions (DBCA) with an itinerary and program of the locations of operations on the licence area and informing at least five days in advance of any changes to that itinerary. All activities and movements shall comply with reasonable access and travel requirements of the relevant Regional Manager, DBCA regarding seasonal/ground conditions. | 18-Jan-2018 | |
10 | 1 | The licensee submitting to the Director, Environment, Department of Mines, Industry Regulation and Safety and to the relevant Regional Manager, DBCA annually within a month of the anniversary of grant in each year, a brief report outlining the operations and rehabilitation work undertaken in the previous 12 months and any proposed operations and rehabilitation work for the next 12 months. The report must include a map showing the location of all disturbances. | 18-Jan-2018 | |
Type | Number | Details |
Amalgamation | 497372 | Lodged:15:35 22 November 2016Granted 04/05/2017 in respect to P 25/1919 |
Amalgamation | 527685 | Lodged:15:00 11 April 2018Amalgamating:Portion of former P 25/1863Situated within:External boundaries of E 25/497Granted 18/01/2019 in respect to P 25/1863 |
Extension / Renewal of Term | 543869 | Lodged:13:46:53 04 December 2018Applied For Period:5 YearsRECORDED:13:46:53 04 December 2018GRANTED:01 February 2019Granted Period:5 YearsTerm Extended To:11/12/2023 |
Application to Amend | 550443 | Lodged:14:14:09 28 March 2019Amending:Address (Including DTC Details)From:Principal Place of Business : SOUTHERN GOLD LIMITED, SAME AS CORRESPONDENCE and DTC :SOUTHERN GOLD LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : SOUTHERN GOLD LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwide.com.au, xxxxxxxx400 and DTC :SOUTHERN GOLD LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwide.com.au, xxxxxxxx400RECORDED:14:14:09 28 March 2019 |
Caveat | 562064 | Lodged:16:11:36 30 August 2019Caveat Type:Consent CaveatCaveator:AURENNE CANNON PTY LTDShares Caveated:100/100 shares SOUTHERN GOLD LIMITEDRECORDED:16:11:36 30 August 2019Courtesy Letter Sent 17/10/2019.WITHDRAWN:14:08:23 31 July 2020 |
Partial Surrender - Compulsory | 564551 | Lodged:11:47:14 11 October 2019Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2620 g, h, m, n, r, v
KALGOORLIE 2692 a, b, hSurrendered Total:9 BL.Duplicate formREJECTED:11:47:14 11 October 2019 |
Partial Surrender - Compulsory | 564619 | Lodged:10:41:48 14 October 2019Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2620 g, h, m, n, r, v
KALGOORLIE 2692 a, b, hSurrendered Total:9 BL.REGISTERED:Midnight 11 December 2019Surrendered area to be released 08:30:00 06/01/2020 under Section 65 (3)Surrendered area released 08:30:00 06/01/2020 under Section 65 (3) |
Application to Amend | 565186 | Lodged:14:38:20 21 October 2019Amending:Address (Including DTC Details)From:Principal Place of Business : SOUTHERN GOLD LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwide.com.au, xxxxxxxx400 and DTC :SOUTHERN GOLD LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwide.com.au, xxxxxxxx400To:Principal Place of Business : SOUTHERN GOLD LIMITED, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433, xxxx@getmining.com.au, xxxxxxxxx525 and DTC :SOUTHERN GOLD LIMITED, GLOBAL EXPLORATION TENEMENT SERVICES, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433, xxxx@getmining.com.au, xxxxxxxxx525RECORDED:14:38:20 21 October 2019 |
Withdrawal of Dealing | 583205 | Lodged:14:08:23 31 July 2020In respect to:Caveat 562064RECORDED:14:08:23 31 July 2020 |
Application to Amend | 618181 | Lodged:13:14:37 18 March 2021Amending:Address (Including DTC Details)From:AURENNE CANNON PTY LTD, UNIT 1, 31-33 DUGAN STREET, KALGOORLIE, WA, 6430, xxx@goldfieldstechnicalservices.com.au, xxxxxxx004To:AURENNE CANNON PTY LTD, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433, xxxx@getmining.com.au, xxxxxxxxx525RECORDED:13:14:37 18 March 2021 |
Mortgage | 634287 | Lodged:11:25:27 18 October 2021Mortgaged Shares:100/100 shares BLACK MOUNTAIN GOLD LIMITEDMortgagee:AURENNE CANNON PTY LTDREGISTERED:11:25:27 18 October 2021DISCHARGED:10:59:49 07 December 2022Full Discharge:664931 Registered 10:59:49 07 December 2022 |
Mortgage - Discharge | 664931 | Lodged:10:59:49 07 December 2022In respect to:Mortgage 634287REGISTERED:10:59:49 07 December 2022 |
Surrender - Outright | 671276 | Lodged:08:30 20 March 2023REGISTERED:08:30 20 March 2023 |