Extracted from MTO on 06-Jul-2025 00:31,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 16-Oct-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 16-Oct-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Oct-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Oct-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Oct-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Oct-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 16-Oct-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 16-Oct-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Oct-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Oct-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Oct-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Oct-2015 | |
Type | Number | Details |
Application to Amend | 492899 | Lodged:16:05 25 August 2016Amending:NameFrom:ASR RESOURCES PTY LTDTo:ASR RESOURCES LTDAmending:Address (Including DTC Details)From:Principal Place of Business : ASR RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :ASR RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Principal Place of Business : ASR RESOURCES LTD, PO BOX 502, BALLARAT, VICTORIA, 3353 and DTC :ASR RESOURCES LTD, ASR RESOURCES LTD, PO BOX 502, BALLARAT, VICTORIA, 3353RECORDED:16:05 25 August 2016 |
Application to Amend | 535462 | Lodged:11:30 16 July 2018Amending:Address (Including DTC Details)From:Principal Place of Business : ASR RESOURCES LTD, PO BOX 502, BALLARAT, VICTORIA, 3353 and DTC :ASR RESOURCES LTD, PO BOX 502, BALLARAT, VICTORIA, 3353To:Principal Place of Business : ASR RESOURCES LTD, C/- AP & CO PTY LTD, 2 DEHLI STREET, BENTLEIGH, VICTORIA, 3204 and DTC :ASR RESOURCES LTD, C/- AP & CO PTY LTD, 2 DEHLI STREET, BENTLEIGH, VICTORIA, 3204RECORDED:11:30 16 July 2018 |
Application to Amend | 546183 | Lodged:11:09:06 17 January 2019Amending:Address (Including DTC Details)From:Principal Place of Business : ASR RESOURCES LTD, C/- AP & CO PTY LTD, 2 DEHLI STREET, BENTLEIGH, VICTORIA, 3204 and DTC :ASR RESOURCES LTD, C/- AP & CO PTY LTD, 2 DEHLI STREET, BENTLEIGH, VICTORIA, 3204To:Principal Place of Business : ASR RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400 and DTC :ASR RESOURCES LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400RECORDED:11:09:06 17 January 2019 |
Application to Amend | 572093 | Lodged:12:42:03 11 February 2020Amending:Address (Including DTC Details)From:Principal Place of Business : A.P. & CO. PTY LTD, 2 DELHI STREET, BENTLEIGH, VIC, 3204 and DTC :A.P. & CO. PTY LTD, A. P. & CO PTY LTD, 2 DELHI STREET, BENTLEIGH, VIC, 3204To:Principal Place of Business : A.P. & CO. PTY LTD, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433, xxxx@getmining.com.au, xxxxxxx525 and DTC :A.P. & CO. PTY LTD, GLOBAL EXPLORATION TENEMENT SERVICES, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433, xxxx@getmining.com.au, xxxxxxx525RECORDED:12:42:03 11 February 2020 |
Extension / Renewal of Term | 588225 | Lodged:08:30:41 14 October 2020Applied For Period:5 YearsRECORDED:08:30:41 14 October 2020GRANTED:24 February 2021Granted Period:5 YearsTerm Extended To:15/10/2025 |
Caveat | 632930 | Lodged:15:03:23 22 September 2021Caveat Type:Consent CaveatCaveator:A.P. & CO. PTY LTDShares Caveated:100/100 shares BROAD ARROW HOLDINGS (WA) PTY LTDRECORDED:15:03:23 22 September 2021WITHDRAWN:11:51:21 20 December 2021 |
Withdrawal of Dealing | 637984 | Lodged:11:51:21 20 December 2021In respect to:Caveat 632930RECORDED:11:51:21 20 December 2021 |
Application to Amend | 641497 | Lodged:14:29:49 16 February 2022Amending:Address (Including DTC Details)From:BROAD ARROW HOLDINGS (WA) PTY LTD, GLOBAL EXPLORATION TENEMENT SERVICES, PO BOX 10939, KALGOORLIE, WA, 6430, xxxx@getmining.com.au, xxxxxxxxx525To:BROAD ARROW HOLDINGS (WA) PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxx@mmwc.com.au, xxxxxxxxx866RECORDED:14:29:49 16 February 2022 |