Extracted from MTO on 01-Jul-2025 00:43,
last changed 29-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 08-Jul-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 08-Jul-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Jul-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Jul-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Jul-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Jul-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 08-Jul-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 08-Jul-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Jul-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Jul-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Jul-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Jul-2015 | |
Type | Number | Details |
Application to Amend | 461183 | Lodged:16:15 27 January 2015Amending:LocalityFrom:24To:CanegrassRECORDED:16:15 27 January 2015 |
Amalgamation | 473530 | Lodged:16:19 27 August 2015Granted 04/05/2017 in respect to M 24/541-IGranted 04/05/2017 in respect to M 24/731-IGranted 04/05/2017 in respect to M 24/732-I |
Caveat | 554837 | Lodged:15:46:24 28 May 2019Caveat Type:Absolute CaveatCaveator:KALGOORLIE NICKEL PTY LTDShares Caveated:100/100 shares KING, Alastair GraemeRECORDED:15:46:24 28 May 2019WITHDRAWN:13:11:34 12 June 2019 |
Application to Amend | 555006 | Lodged:11:50 30 May 2019Amending:Address (Including DTC Details)From:Principal Residence : KING, Alastair Graeme, SAME AS CORRESPONDENCE and DTC :KING, Alastair Graeme, 23 DOVER RD, SCARBOROUGH, WA, 6019To:Principal Residence : KING, Alastair Graeme, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :KING, Alastair Graeme, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:11:50 30 May 2019 |
Withdrawal of Dealing | 555983 | Lodged:13:11:34 12 June 2019In respect to:Caveat 554837RECORDED:13:11:34 12 June 2019 |
Extension / Renewal of Term | 579977 | Lodged:13:30:16 15 June 2020Applied For Period:5 YearsRECORDED:13:30:16 15 June 2020GRANTED:03 September 2020Granted Period:5 YearsTerm Extended To:07/07/2025 |
Extension / Renewal of Term | 733785 | Lodged:09:19:14 20 May 2025Applied For Period:2 YearsRECORDED:09:19:14 20 May 2025 |