# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 30-Dec-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 30-Dec-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Dec-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Dec-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-Dec-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-Dec-2008 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 24/192 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 30-Dec-2008 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 37. | 30-Dec-2008 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 30-Dec-2008 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Pipeline Licence 37. | 30-Dec-2008 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 30-Dec-2008 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 37 without the prior written consent of the State Mining Engineer, DoCEP. | 30-Dec-2008 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 30-Dec-2008 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 37. | 30-Dec-2008 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 37. | 30-Dec-2008 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 30-Dec-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 30-Dec-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Dec-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Dec-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 30-Dec-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 30-Dec-2008 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 24/192 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 30-Dec-2008 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 37. | 30-Dec-2008 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 30-Dec-2008 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Pipeline Licence 37. | 30-Dec-2008 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 30-Dec-2008 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 37 without the prior written consent of the State Mining Engineer, DoCEP. | 30-Dec-2008 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 30-Dec-2008 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 37. | 30-Dec-2008 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 37. | 30-Dec-2008 | |
Type | Number | Details |
Application to Amend | 336196 | Lodged:12:30 08 December 2009Amending:AddressFrom:HERON RESOURCES LTD, PO BOX 1280, KALGOORLIE, WA, 6433To:HERON RESOURCES LTD, C/- PIONEER RESOURCES LTD, P.O. BOX 1787, WEST PERTH, WA, 6872RECORDED:12:30 08 December 2009 |
Amalgamation | 358160 | Lodged:11:05 26 October 2010Amalgamating portions of late P's 24/3908 to 24/3912 situated within the boundaries of E 24/157.GRANTED 15 August 2011 |
Application to Amend | 400992 | Lodged:14:05 06 July 2012Amending:AddressFrom:PIONEER RESOURCES LIMITED, C/- PO BOX 1787, WEST PERTH, WA, 6872To:PIONEER RESOURCES LIMITED, C/- GPO BOX 2567, PERTH, WA, 6001RECORDED:14:05 06 July 2012 |
Mortgage | 402166 | Lodged:12:30 24 July 2012Mortgaged Shares:100/100 shares CARRICK GOLD LIMITEDMortgagee:PIONEER RESOURCES LIMITEDREGISTERED:12:30 24 July 2012DISCHARGED:15:40 20 November 2014Full Discharge:458061 Registered 15:40 20 November 2014 |
Application to Amend | 408199 | Lodged:13:25 16 October 2012Amending:NameFrom:CARRICK GOLD LIMITEDTo:KALNORTH GOLD MINES LIMITEDRECORDED:13:25 16 October 2012 |
Application to Amend | 432040 | Lodged:15:20 26 September 2013REJECTED:15:20 26 September 2013 |
Extension / Renewal of Term | 437664 | Lodged:13:10 23 December 2013Applied For Period:5 YearsRECORDED:13:10 23 December 2013GRANTED:08 April 2014Granted Period:5 YearsTerm Extended To:29/12/2018 |
Application to Amend | 441904 | Lodged:15:51 11 March 2014Amending:AddressFrom:KALNORTH GOLD MINES LIMITED, GPO BOX 2567, PERTH, WA, 6001To:KALNORTH GOLD MINES LIMITED, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433RECORDED:15:51 11 March 2014 |
Mortgage - Discharge | 458061 | Lodged:15:40 20 November 2014In respect to:Mortgage 402166REGISTERED:15:40 20 November 2014 |
Application to Amend | 458421 | Lodged:15:45 28 November 2014Amending:AddressFrom:KALNORTH GOLD MINES LIMITED, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433To:KALNORTH GOLD MINES LIMITED, C/HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849RECORDED:15:45 28 November 2014 |
Partial Surrender - Compulsory | 459149 | Lodged:15:40 12 December 2014Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2033 m, r, s
KALGOORLIE 2034 qSurrendered Total:4 BL.REGISTERED:Midnight 29 December 2014Surrendered area to be released 08:30:00 27/01/2015 under Section 65 (3)Surrendered area released 08:30:00 27/01/2015 under Section 65 (3) |
Application to Amend | 490162 | Lodged:11:01:03 07 July 2016Amending:Address (Including DTC Details)From:PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:11:01:03 07 July 2016 |
Extension / Renewal of Term | 543964 | Lodged:13:51:48 05 December 2018Applied For Period:2 YearsRECORDED:13:51:48 05 December 2018GRANTED:15 March 2019Granted Period:2 YearsTerm Extended To:29/12/2020 |
Application to Amend | 554340 | Lodged:15:35 21 May 2019Amending:Address (Including DTC Details)From:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, SAME AS CORRESPONDENCE and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977RECORDED:15:35 21 May 2019 |
Application to Amend | 590206 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977To:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxx977RECORDED:14:30 11 November 2020 |
Extension / Renewal of Term | 593098 | Lodged:10:26:42 23 December 2020Applied For Period:2 YearsRECORDED:10:26:42 23 December 2020 |