Extracted from MTO on 30-Jun-2025 01:19,
last changed 30-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 09-Mar-2010 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 09-Mar-2010 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Mar-2010 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Mar-2010 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 09-Mar-2010 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 09-Mar-2010 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 26/63 and 27/62 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 09-Mar-2010 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Unnumbered Land Act Reserve 3. | 09-Mar-2010 | |
9 | 1 | No excavation, excepting shafts, approaching closer to the Goldfields Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Goldfields Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 09-Mar-2010 | |
10 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 09-Mar-2010 | |
11 | 1 | No interference with Geodetic Survey Station SSM-Kalgoorlie 192, 192T and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 09-Mar-2010 | |
12 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 24 as shown in TENGRAPH.
| 09-Mar-2010 | |
13 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 12 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 09-Mar-2010 | |
14 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 12 hereof without the prior approval of the operators of the Pipeline Licence 24. | 09-Mar-2010 | |
15 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 12 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 09-Mar-2010 | |
16 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 24 without the prior written consent of the State Mining Engineer DMP. | 09-Mar-2010 | |
17 | 1 | Mining on the Safety Zone established in Condition 12 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 09-Mar-2010 | |
18 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 12 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 24. | 09-Mar-2010 | |
19 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 24. | 09-Mar-2010 | |
20 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land 11 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 09-Mar-2010 | |
21 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (20) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMP. | 09-Mar-2010 | |
22 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (20) hereof being approved by the State Mining Engineer, DMP in consultation with the operator of the railway on corridor land. | 09-Mar-2010 | |
23 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (20) hereof without the prior approval of the operator of the railway on corridor land. | 09-Mar-2010 | |
24 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (20) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMP. | 09-Mar-2010 | |
25 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMP. | 09-Mar-2010 | |
26 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 09-Mar-2010 | |
27 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 09-Mar-2010 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 09-Mar-2010 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 09-Mar-2010 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Mar-2010 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Mar-2010 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 09-Mar-2010 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 09-Mar-2010 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 26/63 and 27/62 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 09-Mar-2010 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Unnumbered Land Act Reserve 3. | 09-Mar-2010 | |
9 | 1 | No excavation, excepting shafts, approaching closer to the Goldfields Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Goldfields Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 09-Mar-2010 | |
10 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 09-Mar-2010 | |
11 | 1 | No interference with Geodetic Survey Station SSM-Kalgoorlie 192, 192T and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 09-Mar-2010 | |
12 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 24 as shown in TENGRAPH.
| 09-Mar-2010 | |
13 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 12 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 09-Mar-2010 | |
14 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 12 hereof without the prior approval of the operators of the Pipeline Licence 24. | 09-Mar-2010 | |
15 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 12 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 09-Mar-2010 | |
16 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 24 without the prior written consent of the State Mining Engineer DMP. | 09-Mar-2010 | |
17 | 1 | Mining on the Safety Zone established in Condition 12 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 09-Mar-2010 | |
18 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 12 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 24. | 09-Mar-2010 | |
19 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 24. | 09-Mar-2010 | |
20 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land 11 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 09-Mar-2010 | |
21 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (20) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMP. | 09-Mar-2010 | |
22 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (20) hereof being approved by the State Mining Engineer, DMP in consultation with the operator of the railway on corridor land. | 09-Mar-2010 | |
23 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (20) hereof without the prior approval of the operator of the railway on corridor land. | 09-Mar-2010 | |
24 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (20) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMP. | 09-Mar-2010 | |
25 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMP. | 09-Mar-2010 | |
26 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 09-Mar-2010 | |
27 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 09-Mar-2010 | |
Type | Number | Details |
Extension of Time | 261596 | Lodged on 06 Mar 2007 to lodge SecurityApproved by the Warden on 06 Mar 2007 |
Extension of Time | 262524 | Lodged on 12 Mar 2007 to lodge late advertisementApproved by the Warden on 19 Mar 2007 |
Transfer | 292913 | Transfer 292913 was registered on 10 Jun 2008 against E 24/112. Pursuant to Section 120AA the applicant details have been amended. |
Application to Amend | 383064 | Lodged:11:31 20 September 2011Amending:AddressFrom:JACKSON MINERALS LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:JACKSON MINERALS LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931From:MURCHISON RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 8638, PERTH BUSINESS CENTRE, WA, 6849To:MURCHISON RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:11:31 20 September 2011 |
Application to Amend | 387484 | Lodged:15:55 15 December 2011Amending:NameFrom:JACKSON MINERALS LTDTo:JACKSON MINERALS PTY LTDRECORDED:15:55 15 December 2011 |
Application to Amend | 397219 | Lodged:11:50 10 May 2012Amending:AddressFrom:JACKSON MINERALS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:JACKSON MINERALS PTY LTD, ATTN: SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901RECORDED:11:50 10 May 2012 |
Extension of Time | 422815 | Lodged:11:24 09 May 2013Type:Exemption from ExpenditureRECORDED:11:24 09 May 2013APPROVED:10:40 15 May 2013 |
Forfeiture | 433695 | Initiated:24/12/2013 for non-compliance with expenditure conditionsRECORDED:10:40 23 October 2013Notice Issued:Regulation 50 Notice sent 24/12/2013 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:29/01/2014FINALISED:Order by Minister on 20 December 2013 that E 24/151 be Penalty Imposed |
Application to Amend | 434280 | Lodged:09:00 01 November 2013Amending:AddressFrom:ZEBINA MINERALS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:ZEBINA MINERALS PTY LTD, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433RECORDED:09:00 01 November 2013 |
Fine | 437723 | Fine in respect to:Forfeiture Process 433695Fine reason:Non-compliance with expenditure obligationsPenalty amount:$803.00Notification date:24/12/2013Due date:29/01/2014Pursuant to:Section 96A(5)RECORDED:24 December 2013PAYMENT RECEIVED:17 January 2014Receipt Number:06-132189Amount:$803.00Remaining balance:$0.00FINALISED:17 January 2014 |
Application to Amend | 439562 | Lodged:11:25 29 January 2014REJECTED:11:25 29 January 2014As per Phil Nell - applicant decided they did not want to lodge the Application to Amend therefore rejected.Relodged:13:50 04 February 2014Amending:AddressFrom:JACKSON MINERALS PTY LTD, ATTN: SHANE ST CLAIR, LAND AND AGREEMENTS MANAGER, PO BOX 1385, WEST LEEDERVILLE, WA, 6901To:JACKSON MINERALS PTY LTD, C/- BARRICK (PD) AUSTRALIA LIMITED, ATTN: LAND MANAGER, LOCKED BAG 12 CLOISTERS SQUARE, PERTH, WA, 6850RECORDED:13:50 04 February 2014 |
Caveat | 440872 | Lodged:14:20 21 February 2014Caveat Type:Consent CaveatCaveator:BARRICK (KANOWNA) LIMITEDShares Caveated:80/100 shares JACKSON MINERALS PTY LTDRECORDED:14:20 21 February 2014WITHDRAWN:12:17 18 December 2015 |
Extension of Time | 444137 | Lodged:15:19 10 April 2014Type:Form 5RECORDED:15:19 10 April 2014Extension of time until 21 May 2014 to lodge Form 5 for the year ending 8 March 2014APPROVED:11:24:24 08 May 2014 |
Application to Amend | 446718 | Lodged:11:20:10 20 May 2014Amending:AddressFrom:JACKSON MINERALS PTY LTD, C/- BARRICK (PD) AUSTRALIA LIMITED, ATTN: LAND MANAGER, LOCKED BAG 12 CLOISTERS SQUARE, PERTH, WA, 6850To:JACKSON MINERALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:11:20:10 20 May 2014 |
Extension / Renewal of Term | 463310 | Lodged:11:34:53 04 March 2015Applied For Period:5 YearsRECORDED:11:34:53 04 March 2015GRANTED:13 May 2015Granted Period:5 YearsTerm Extended To:08/03/2020 |
Application to Amend | 473928 | Lodged:12:16 03 September 2015REJECTED:12:16 03 September 2015 |
Application to Amend | 476094 | Lodged:15:03:44 19 October 2015Amending:AddressFrom:JACKSON MINERALS PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:JACKSON MINERALS PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904RECORDED:15:03:44 19 October 2015 |
Withdrawal of Dealing | 479197 | Lodged:12:17 18 December 2015In respect to:Caveat 440872RECORDED:12:17 18 December 2015 |
Application to Amend | 479940 | Lodged:12:40:20 07 January 2016Amending:AddressFrom:ZEBINA MINERALS PTY LTD, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433To:ZEBINA MINERALS PTY LTD, PO BOX 10204, KALGOORLIE, WA, 6433RECORDED:12:40:20 07 January 2016 |
Application to Amend | 480051 | Lodged:10:40:56 12 January 2016Amending:AddressFrom:NORTHERN STAR (KANOWNA) PTY LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:NORTHERN STAR (KANOWNA) PTY LIMITED, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6008RECORDED:10:40:56 12 January 2016 |
Partial Surrender - Compulsory | 481306 | Lodged:11:28:20 05 February 2016Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2177 o, s, x
KALGOORLIE 2249 k
KALGOORLIE 2250 lSurrendered Total:5 BL.REGISTERED:Midnight 08 March 2016Surrendered area to be released 08:30:00 08/04/2016 under Section 65 (3)Surrendered area released 08:30:00 08/04/2016 under Section 65 (3) |
Application to Amend | 495063 | Lodged:12:55:40 07 October 2016Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN STAR (KANOWNA) PTY LIMITED, SAME AS CORRESPONDENCE and DTC :NORTHERN STAR (KANOWNA) PTY LIMITED, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6008To:Principal Place of Business : NORTHERN STAR (KANOWNA) PTY LIMITED, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxx@nsrltd.com, xxxxx610 and DTC :NORTHERN STAR (KANOWNA) PTY LIMITED, NORTHERN STAR (KANOWNA) PTY LIMITED, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, xxxxx@nsrltd.com, xxxxx610RECORDED:12:55:40 07 October 2016 |
Surrender - Outright | 572465 | Lodged:11:22:16 18 February 2020REGISTERED:11:22:16 18 February 2020 |