Extracted from MTO on 28-Feb-2021 03:42,
last changed 17-Nov-2020.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 25-Jul-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 25-Jul-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-Jul-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-Jul-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 25-Jul-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 25-Jul-2007 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 24/186 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 25-Jul-2007 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licences 24 and 37. | 25-Jul-2007 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 25-Jul-2007 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Pipeline Licences 24 and 37. | 25-Jul-2007 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 25-Jul-2007 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licences 24 and 37 without the prior written consent of the State Mining Engineer, DoCEP. | 25-Jul-2007 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 25-Jul-2007 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licences 24 and 37. | 25-Jul-2007 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licences 24 and 37. | 25-Jul-2007 | |
16 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E24/149 for Pioneer Resources Limited" (Reg ID 27058) dated 21 May 2010 signed by James Guy and retained on Department of Mines and Petroleum File No. T4471/200601
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 05-Aug-2010 | |
17 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 05-Aug-2010 | |
18 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 05-Aug-2010 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 25-Jul-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 25-Jul-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 25-Jul-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 25-Jul-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 25-Jul-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 25-Jul-2007 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 24/186 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 25-Jul-2007 | |
8 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licences 24 and 37. | 25-Jul-2007 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 25-Jul-2007 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Pipeline Licences 24 and 37. | 25-Jul-2007 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 25-Jul-2007 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licences 24 and 37 without the prior written consent of the State Mining Engineer, DoCEP. | 25-Jul-2007 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 25-Jul-2007 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licences 24 and 37. | 25-Jul-2007 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licences 24 and 37. | 25-Jul-2007 | |
16 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E24/149 for Pioneer Resources Limited" (Reg ID 27058) dated 21 May 2010 signed by James Guy and retained on Department of Mines and Petroleum File No. T4471/200601
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 05-Aug-2010 | |
17 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 05-Aug-2010 | |
18 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 05-Aug-2010 | |
Type | Number | Details |
Objection | KA38/067 | Lodged 9:16:00 AM on 14 Sep 2006 by AUSTRALIAN NICKEL MINES NLRECORDED 9:16 AM 14 Sep 2006WITHDRAWN 21 Dec 2006 |
Application to Amend | 336195 | Lodged:12:30 08 December 2009Amending:AddressFrom:ATRIPLEX LTD, C/- PO BOX 1280, KALGOORLIE, WA, 6433To:ATRIPLEX LTD, C/- PIONEER RESOURCES LTD, P.O. BOX 1787, WEST PERTH, WA, 6872RECORDED:12:30 08 December 2009 |
Amalgamation | 349312 | Lodged:10:50 16 June 2010Amalgamating portions of former Prospecting Licences 24/3867-3869 and 24/3874 and 24/3876 situated within the external boundaries of this licence.GRANTED 9 March 2011 |
Bond | 351683 | Lodged:11:20 21 July 2010Bond Type:Unconditional Performance BondBond Amount:$13,000.00RECORDED:21 July 2010RETIRED:08 August 2012 |
Bond Requirement | 352715 | Requirement Date:05/08/2010Amount:$13,000.00RECORDED:09:52:16 05 August 2010FINALISED:11:20:38 02 August 2013 |
Amalgamation | 358150 | Lodged:11:05 26 October 2010Amalgamating:Portion of former P 24/3908Situated within:External boundaries of E 24/149GRANTED 29 June 2011 |
Application to Amend | 400992 | Lodged:14:05 06 July 2012Amending:AddressFrom:PIONEER RESOURCES LIMITED, C/- PO BOX 1787, WEST PERTH, WA, 6872To:PIONEER RESOURCES LIMITED, C/- GPO BOX 2567, PERTH, WA, 6001RECORDED:14:05 06 July 2012 |
Mortgage | 402166 | Lodged:12:30 24 July 2012Mortgaged Shares:100/100 shares CARRICK GOLD LIMITEDMortgagee:PIONEER RESOURCES LIMITEDREGISTERED:12:30 24 July 2012DISCHARGED:15:40 20 November 2014Full Discharge:458061 Registered 15:40 20 November 2014 |
Extension / Renewal of Term | 402175 | Lodged:15:50 24 July 2012Applied For Period:5 YearsRECORDED:15:50 24 July 2012GRANTED:22 August 2012Granted Period:5 YearsTerm Extended To:24/07/2017 |
Deferral of Drop Off | 402187 | Lodged:15:50 24 July 2012RECORDED:15:50 24 July 2012GRANTED:22 August 2012 |
Bond | 402139 | Lodged:12:30 24 July 2012Bond Type:Unconditional Performance BondBond Amount:$13,000.00Affected Tenements:E 24/149REJECTED:12:30 24 July 2012Relodged:16:30 25 July 2012Bond Type:Unconditional Performance BondBond Amount:$13,000.00RECORDED:25 July 2012RETIRED - MRF:02 August 2013 |
Application to Amend | 408199 | Lodged:13:25 16 October 2012Amending:NameFrom:CARRICK GOLD LIMITEDTo:KALNORTH GOLD MINES LIMITEDRECORDED:13:25 16 October 2012 |
Partial Surrender - Voluntary | 426073 | Lodged:14:20 27 June 2013Surrendered Blocks:KALGOORLIE 1889 n, s, x
KALGOORLIE 1960 k
KALGOORLIE 1961 b, c, e, f, j, k, pSurrendered Total:11 BL.REGISTERED:14:20 27 June 2013Re Mortgage 402166 : Consent of Mortgagee given |
Partial Surrender - Voluntary | 427489 | Lodged:15:35 19 July 2013Surrendered Blocks:KALGOORLIE 1889 o, t, y
KALGOORLIE 1960 e
KALGOORLIE 1961 a, d, g, h, m, n, oSurrendered Total:11 BL.REGISTERED:15:35 19 July 2013Re Mortgage 402166 : Consent of Mortgagee given |
Application to Amend | 432040 | Lodged:15:20 26 September 2013REJECTED:15:20 26 September 2013 |
Application to Amend | 441904 | Lodged:15:51 11 March 2014Amending:AddressFrom:KALNORTH GOLD MINES LIMITED, GPO BOX 2567, PERTH, WA, 6001To:KALNORTH GOLD MINES LIMITED, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433RECORDED:15:51 11 March 2014 |
Forfeiture | 458142 | Initiated:13/11/2014 for non-compliance with expenditure conditionsRECORDED:15:38 08 September 2014Notice Issued:Regulation 50 Notice sent 13/11/2014 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:15/12/2014FINALISED:Order by Minister on 20 January 2015 that E 24/149 be Penalty Imposed |
Forfeiture | 454578 | Initiated:17/09/2014 for non-compliance with rent requirementsRECORDED:08:23:21 12 September 2014Notice Issued:Regulation 50 Notice sent 17/09/2014 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:21/10/2014FINALISED:Order by Minister on 30 October 2014 that E 24/149 be Penalty Imposed |
Fine | 457051 | Fine in respect to:Forfeiture Process 454578Fine reason:Non-compliance with rent obligationsPenalty amount:$416.00Notification date:31/10/2014Due date:03/12/2014Pursuant to:Section 96A(5)RECORDED:31 October 2014PAYMENT RECEIVED:07 November 2014FINALISED:07 November 2014Receipt Number:06-140477Amount:$416.00Remaining balance:$0.00 |
Mortgage - Discharge | 458061 | Lodged:15:40 20 November 2014In respect to:Mortgage 402166REGISTERED:15:40 20 November 2014 |
Caveat | 458187 | Lodged:15:35 24 November 2014Caveat Type:Consent CaveatCaveator:PADDINGTON GOLD PTY LIMITEDShares Caveated:100/100 shares KALNORTH GOLD MINES LIMITEDRECORDED:15:35 24 November 2014Caveat to remain in full force and effect on expiry of 14 day notice by order of Warden: ANDREW MAUGHAN 08:30 14 January 2015WITHDRAWN:15:50 09 April 2015 |
Application to Amend | 458420 | Lodged:15:45 28 November 2014Amending:AddressFrom:KALNORTH GOLD MINES LIMITED, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433To:KALNORTH GOLD MINES LIMITED, C/HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849RECORDED:15:45 28 November 2014 |
Partial Surrender - Voluntary | 459511 | Lodged:11:48:15 19 December 2014Surrendered Blocks:KALGOORLIE 1960 p, u
KALGOORLIE 1961 l, q, r, s, t, u
KALGOORLIE 1962 l, qSurrendered Total:10 BL.REJECTED:11:48:15 19 December 2014Relodged:10:30 19 January 2015Surrendered Blocks:KALGOORLIE 1960 p, u
KALGOORLIE 1961 l, q, r, s, t, u
KALGOORLIE 1962 l, qSurrendered Total:10 BL.REGISTERED:10:30 19 January 2015 |
Fine | 460869 | Fine in respect to:Forfeiture Process 458142Fine reason:Non-compliance with expenditure obligationsPenalty amount:$4,193.00Notification date:21/01/2015Due date:24/02/2015Pursuant to:Section 96A(5)RECORDED:20 January 2015PAYMENT RECEIVED:16 February 2015FINALISED:16 February 2015Receipt Number:06-142917Amount:$4,193.00Remaining balance:$0.00 |
Withdrawal of Dealing | 465359 | Lodged:15:50 09 April 2015In respect to:Caveat 458187RECORDED:15:50 09 April 2015 |
Application to Amend | 490162 | Lodged:11:01:03 07 July 2016Amending:Address (Including DTC Details)From:PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:11:01:03 07 July 2016 |
Extension / Renewal of Term | 509543 | Lodged:08:30 03 July 2017Applied For Period:2 YearsRECORDED:08:30 03 July 2017GRANTED:07 March 2018Granted Period:2 YearsTerm Extended To:24/07/2019 |
Application to Amend | 554340 | Lodged:15:35 21 May 2019Amending:Address (Including DTC Details)From:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, SAME AS CORRESPONDENCE and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977RECORDED:15:35 21 May 2019 |
Extension / Renewal of Term | 558403 | Lodged:13:58:18 15 July 2019Applied For Period:2 YearsRECORDED:13:58:18 15 July 2019GRANTED:01 October 2019Granted Period:2 YearsTerm Extended To:24/07/2021 |
Application to Amend | 590206 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxxx977To:Principal Place of Business : PADDINGTON GOLD PTY LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :PADDINGTON GOLD PTY LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxx977RECORDED:14:30 11 November 2020 |