Extracted from MTO on 09-Jul-2025 01:07,
last changed 27-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 08-Nov-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Nov-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Nov-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Nov-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Nov-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 08-Nov-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Nov-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Nov-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Nov-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Nov-2019 | |
Type | Number | Details |
Application to Amend | 514493 | Lodged:15:00 13 September 2017Amending:Other/Non-title changesAmending from: (e) (c) NIL
Attachment 1: PRIMARY NUMBERS 344 AND 345
Amending to: (f) (c) Murchison
Attachment 1: PRIMARY NUMBERS 3144 AND 3145RECORDED:15:00 13 September 2017 |
Extension of Time | 520308 | Lodged:10:45 07 December 2017Type:SecurityRECORDED:10:45 07 December 2017APPROVED:10:45 08 December 2017 |
Excess Tonnage | 594585 | Lodged:09:27:12 22 January 2021RECORDED:09:27:12 22 January 2021GRANTED:15:28 16 February 2021An additional 9,000 tonnes |
Forfeiture | 645867 | Initiated:29/03/2022 for non-compliance with reporting requirementsRECORDED:15:52:12 28 March 2022Notice Issued:Regulation 50 Notice sent 29/03/2022 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:04/05/2022WITHDRAWN:29 July 2022 (lodged prior to issue of Reg 50 Notice) |
Forfeiture | 669102 | Initiated:20/02/2023 for non-compliance with reporting requirements( Form 5 )LAPSED:20 February 2023 (Reg 50 notice not issued.)Notice Issued:Regulation 50 Notice sent 20/02/2023 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:27/03/2023 |
Expiry - Full | 719774 | EFFECTIVE:Midnight 07 November 2024 |