Extracted from MTO on 13-Jul-2025 00:42,
last changed 11-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 13-Aug-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Aug-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Aug-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Aug-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Aug-2019 | |
6 | 1 | No interference with Geodetic Survey Station SSM-CUE 27, 28, 96, 97, 98, 99, 100, 101, 102 and 103 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Aug-2019 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 13-Aug-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 13-Aug-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Aug-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Aug-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Aug-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Aug-2019 | |
6 | 1 | No interference with Geodetic Survey Station SSM-CUE 27, 28, 96, 97, 98, 99, 100, 101, 102 and 103 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 13-Aug-2019 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 13-Aug-2019 | |
Type | Number | Details |
Objection | 513273 | Lodged:10:11 28 August 2017Objectors:RICHARDS, ChristopherObjection Type:Tenement ApplicationRECORDED:10:11 28 August 2017WITHDRAWN:09:40 19 October 2017Wardens Decision Made on:09:40 19 October 2017Wardens Decision Status:Dismissed |
Application to Amend | 544636 | Lodged:12:28:53 13 December 2018Amending:Address (Including DTC Details)From:Principal Place of Business : DUKETON CONSOLIDATED PTY LTD, PO BOX 1043, WEST PERTH, WA, 6872 and DTC :DUKETON CONSOLIDATED PTY LTD, TENEMENT MANAGER, PO BOX 1043, WEST PERTH, WA, 6872, xxxxxxxxxxxxx@bigpond.com, xxxxxxx745To:Principal Place of Business : DUKETON CONSOLIDATED PTY LTD, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866 and DTC :DUKETON CONSOLIDATED PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866RECORDED:12:28:53 13 December 2018 |
Amalgamation | 568694 | Lodged:13:19 12 December 2019Amalgamating:Whole of former P 21/733Situated within:External boundaries of E 21/201Granted 22/01/2020 in respect to P 21/733 |
Extension of Time | 633858 | Lodged:08:30 11 October 2021Type:Form 5RECORDED:08:30 11 October 2021APPROVED:16:40:37 01 November 2021Time to lodge extended to 22 Oct 2021 |
Excess Tonnage | 638002 | Lodged:14:08:10 20 December 2021RECORDED:14:08:10 20 December 2021GRANTED:11:02:01 02 February 2022For an additional 1,100 tonnes |
Application to Amend | 642080 | Lodged:16:21:59 23 February 2022Amending:Address (Including DTC Details)From:Principal Place of Business : GARDNER MINING PTY LTD, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxx866 and DTC :GARDNER MINING PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxx866To:Principal Place of Business : GARDNER MINING PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :GARDNER MINING PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:16:21:59 23 February 2022 |
Amalgamation | 646111 | Lodged:10:42:58 31 March 2022Amalgamating:Whole of P 21/716Situated within:External boundaries of E 21/201Granted 03/02/2023 in respect to P 21/716 |
Excess Tonnage | 665182 | Lodged:11:20:41 12 December 2022RECORDED:11:20:41 12 December 2022GRANTED:13:38:13 17 February 2023For an additional 144.42 tonnes |
Extension / Renewal of Term | 711995 | Lodged:08:30 12 August 2024Applied For Period:5 YearsRECORDED:08:30 12 August 2024GRANTED:12 December 2024Granted Period:5 YearsTerm Extended To:12/08/2029 |
Amalgamation | 716374 | Lodged:08:30 07 October 2024Amalgamating:Portion of former P 58/1710Situated within:External boundaries of E 21/201Granted 14/11/2024 in respect to P 58/1710 |
Application to Amend | 737980 | Lodged:10:44:43 10 July 2025PENDING |