Tenement: E21-197

View on Landtracker Maps (logon required)

Extracted from MTO on 12-Jul-2025 01:19, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 21/197Type:Exploration Licence
Status:LiveDistrict:DAY DAWN
Lodged:ONLINEArea:5 BL
Purposes:Term:5 Years (Extended)
Markout:Received:30-Jun-2016 16:25
Commence:29-Nov-2017 Expiry:28-Nov-2027

Holders

Company NameSharesTotal Shares
MURCHISON GOLD MINES PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
MURCHISON GOLD MINES PTY LTD100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Special ProspectingP 21/806-SDead
Special ProspectingP 21/805-SDead
Special ProspectingP 21/804-SDead
Special ProspectingP 21/803-SDead
Special ProspectingP 21/802-SDead
Special ProspectingP 21/801-SDead
Special ProspectingP 21/808-SPending
Special ProspectingP 21/809-SPending
Special ProspectingP 21/810-SPending
Special ProspectingP 21/822-SPending
Special ProspectingP 21/823-SPending
Special ProspectingP 21/824-SPending
Special ProspectingP 21/821-SPending
Special ProspectingP 21/820-SPending
Special ProspectingP 21/819-SPending
Special ProspectingP 21/818-SPending
Special ProspectingP 21/817-SPending
Special ProspectingP 21/816-SPending
Special ProspectingP 21/815-SPending
Special ProspectingP 21/814-SPending
Special ProspectingP 21/813-SPending

Shires

Shire NameShire NumberStartArea
CUE SHIRE238030-Jun-2016 5.00000 BL

Conditions

#VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.14-Mar-2025
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.29-Nov-2017 13-Mar-2025
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-Nov-2017
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Nov-2017
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-Nov-2017
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-Nov-2017
61All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.14-Mar-2025
71The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.14-Mar-2025
81All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.14-Mar-2025
91Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time.14-Mar-2025

Endorsements

Cond #VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.14-Mar-2025
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS.29-Nov-2017 13-Mar-2025
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-Nov-2017
31Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Nov-2017
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-Nov-2017
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-Nov-2017
61All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.14-Mar-2025
71The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.14-Mar-2025
81All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.14-Mar-2025
91Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time.14-Mar-2025

Dealings

TypeNumberDetails
Excess Tonnage539173Lodged:08:30 17 September 2018RECORDED:08:30 17 September 2018GRANTED:08:53:02 05 October 2018For an additional 5,958 tonnes
Excess Tonnage543698Lodged:15:43:39 30 November 2018RECORDED:15:43:39 30 November 2018GRANTED:13:47:29 18 December 2018For an additional 2,394 tonnes
Extension of Time546546Lodged:13:03:39 24 January 2019Type:Form 5RECORDED:13:03:39 24 January 2019APPROVED:14:11:49 29 January 2019Time to lodge extended to 11 Feb 2019
Excess Tonnage565925Lodged:15:39:37 01 November 2019RECORDED:15:39:37 01 November 2019GRANTED:14:33:25 29 November 2019For an additional 648 tonnes
Extension of Time570911Lodged:14:50:37 24 January 2020Type:Form 5RECORDED:14:50:37 24 January 2020APPROVED:13:01:53 07 February 2020Time to lodge extended to 11 Feb 2020
Extension of Time594726Lodged:15:24:31 22 January 2021Type:Form 5RECORDED:15:24:31 22 January 2021extension of time to lodge Form 5 until 11 February 2021APPROVED:09:53:53 19 February 2021
Excess Tonnage621941Lodged:08:30 07 May 2021RECORDED:08:30 07 May 2021WITHDRAWN:14:55 12 May 2021
Excess Tonnage628013Lodged:08:30 13 July 2021RECORDED:08:30 13 July 2021GRANTED:08:30 18 August 2021An additional 4,309 tonnes
Extension of Time640408Lodged:15:58:24 28 January 2022Type:Form 5RECORDED:15:58:24 28 January 2022APPROVED:09:50:30 08 February 2022Time to lodge extended to 16 Feb 2022
Extension / Renewal of Term663922Lodged:15:06:44 24 November 2022Applied For Period:5 YearsRECORDED:15:06:44 24 November 2022GRANTED:12 April 2023Granted Period:5 YearsTerm Extended To:28/11/2027
Extension of Time724366Lodged:16:16:54 24 January 2025Type:Form 5RECORDED:16:16:54 24 January 2025APPROVED:10:02:49 03 February 2025Extension of Time to lodge an Expenditure Report (Form 5) to 24 February 2025 is approved.

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202527-Nov-2024 10711709$3,920.005 BL29-Nov-2017 $3,920.00$0.00
Rental202430-Nov-2023 10456354$1,975.005 BL29-Nov-2017 $1,975.00$0.00
Rental202316-Nov-2022 10302506$1,880.005 BL29-Nov-2017 $1,880.00$0.00
Rental202220-Oct-2021 10225981$1,310.005 BL29-Nov-2017 $1,310.00$0.00
Rental202117-Nov-2020 10172570$1,190.005 BL29-Nov-2017 $1,190.00$0.00
Rental202004-Nov-2019 10121282$690.005 BL29-Nov-2017 $690.00$0.00
Rental201918-Oct-2018 87845300289$680.005 BL29-Nov-2017 $680.00$0.00
Rental201829-Nov-2017 (REFUND) 618218650347PERTH$7,389.755 BL29-Nov-2017 $626.25$0.00
Rental201830-Jun-2016 618218650347$8,016.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2025$50,000.00false
2024$30,000.0024-Feb-2025 $95,353.00$88,974.00$0.00$0.00$2,488.00$3,891.00$0.00false
2023Replacement$30,000.0023-Jan-2024 $34,541.00$29,203.00$0.00$0.00$2,373.00$2,965.00$0.00false
2023$30,000.0023-Jan-2024 $34,636.00$29,203.00$0.00$0.00$2,468.00$2,965.00$0.00true
2022$20,000.0027-Jan-2023 $34,929.00$30,274.00$0.00$0.00$2,377.00$2,278.00$0.00false
2021$20,000.0015-Feb-2022 $35,881.00$29,667.00$0.00$0.00$1,822.00$4,392.00$0.00false
2020$15,000.0010-Feb-2021 $24,919.00$19,648.00$0.00$0.00$1,118.00$4,153.00$0.00false
2019$15,000.0007-Feb-2020 $23,006.00$19,315.00$0.00$0.00$1,190.00$2,501.00$0.00false
2018$15,000.0011-Feb-2019 $35,816.00$32,493.00$0.00$0.00$1,445.00$1,878.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
14-Sep-2016 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-10-052017-02-05CLEARED - Expedited Applies2017-11-2464 BL27370S1175929E24km SE'ly of CueWO2016/06972016-10-24WC1999/010Objection Dismissed Sec 148(b)2017-09-11WO2017/00912017-01-26WC1999/046Objection Withdrawn2017-11-23Badimia People(WCD2015/001)WC1996/098WAD6123/1998falseWCD2015/001EXTINYesWutha(WC1999/010)WC1999/010WAD6064/1998falseDismissedYugunga-Nya People (Unregistered)(WC1999/046)WC1999/046WAD29/2019falsePartially Determined14GeraldtonYamatji Marlpa Aboriginal Corporation