Extracted from MTO on 12-Jul-2025 01:19,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 14-Mar-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 29-Nov-2017 | 13-Mar-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Nov-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Nov-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Nov-2017 | |
6 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 14-Mar-2025 | |
7 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 14-Mar-2025 | |
8 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 14-Mar-2025 | |
9 | 1 | Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time. | 14-Mar-2025 | |
Cond # | Ver | Text | Start | End |
1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 14-Mar-2025 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 29-Nov-2017 | 13-Mar-2025 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Nov-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Nov-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Nov-2017 | |
6 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 14-Mar-2025 | |
7 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 14-Mar-2025 | |
8 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 14-Mar-2025 | |
9 | 1 | Scrape and detecting and dry blowing operations are to be progressively rehabilitated so that no more than two hectares will be open (meaning disturbed without rehabilitation works being completed) at any one time. | 14-Mar-2025 | |
Type | Number | Details |
Excess Tonnage | 539173 | Lodged:08:30 17 September 2018RECORDED:08:30 17 September 2018GRANTED:08:53:02 05 October 2018For an additional 5,958 tonnes |
Excess Tonnage | 543698 | Lodged:15:43:39 30 November 2018RECORDED:15:43:39 30 November 2018GRANTED:13:47:29 18 December 2018For an additional 2,394 tonnes |
Extension of Time | 546546 | Lodged:13:03:39 24 January 2019Type:Form 5RECORDED:13:03:39 24 January 2019APPROVED:14:11:49 29 January 2019Time to lodge extended to 11 Feb 2019 |
Excess Tonnage | 565925 | Lodged:15:39:37 01 November 2019RECORDED:15:39:37 01 November 2019GRANTED:14:33:25 29 November 2019For an additional 648 tonnes |
Extension of Time | 570911 | Lodged:14:50:37 24 January 2020Type:Form 5RECORDED:14:50:37 24 January 2020APPROVED:13:01:53 07 February 2020Time to lodge extended to 11 Feb 2020 |
Extension of Time | 594726 | Lodged:15:24:31 22 January 2021Type:Form 5RECORDED:15:24:31 22 January 2021extension of time to lodge Form 5 until 11 February 2021APPROVED:09:53:53 19 February 2021 |
Excess Tonnage | 621941 | Lodged:08:30 07 May 2021RECORDED:08:30 07 May 2021WITHDRAWN:14:55 12 May 2021 |
Excess Tonnage | 628013 | Lodged:08:30 13 July 2021RECORDED:08:30 13 July 2021GRANTED:08:30 18 August 2021An additional 4,309 tonnes |
Extension of Time | 640408 | Lodged:15:58:24 28 January 2022Type:Form 5RECORDED:15:58:24 28 January 2022APPROVED:09:50:30 08 February 2022Time to lodge extended to 16 Feb 2022 |
Extension / Renewal of Term | 663922 | Lodged:15:06:44 24 November 2022Applied For Period:5 YearsRECORDED:15:06:44 24 November 2022GRANTED:12 April 2023Granted Period:5 YearsTerm Extended To:28/11/2027 |
Extension of Time | 724366 | Lodged:16:16:54 24 January 2025Type:Form 5RECORDED:16:16:54 24 January 2025APPROVED:10:02:49 03 February 2025Extension of Time to lodge an Expenditure Report (Form 5) to 24 February 2025 is approved. |