Extracted from MTO on 04-Mar-2021 04:11,
last changed 13-Feb-2021.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Jul-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Jul-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Jul-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Jul-2016 | |
5 | 1 | No interference with Geodetic Survey Stations SSM -CUE 34, 35, 36, 36A, 113 and 114 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 07-Jul-2016 | |
6 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 07-Jul-2016 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Sanitary Depot Reserve 9603, Aerial Landing Ground Reserve 42391 and Water Act Reserves 7747 and 11772. | 07-Jul-2016 | |
| 1 | In respect to the area designated as CPL/63 (Lakeside Pastoral Lease 3114/484) in TENGRAPH the following conditions apply: | 07-Jul-2016 | |
8 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 07-Jul-2016 | |
9 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 07-Jul-2016 | |
10 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 07-Jul-2016 | |
| 1 | Consent to mine on Water Reserve 5 granted subject to the following condition: | 07-Jul-2016 | |
11 | 1 | No mining on any Wellhead Protection Zone (WPZ0000015) located within the subject mining tenement boundaries without first obtaining the written consent of the Minister responsible for the Mining Act 1978. | 07-Jul-2016 | |
12 | 1 | In respect of the area covered by this licence, if the Yugunga-Nya People being the applicants in Federal Court Application No. (WC1999/046) send a request by prepaid post to the licencee's or agent's address, not more than ninety day after the grant of this licence, the licencee shall within thirty days of the request, execute in favour of Yugunga-Nya People the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation. | 07-Jul-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 07-Jul-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 07-Jul-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 07-Jul-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 07-Jul-2016 | |
5 | 1 | No interference with Geodetic Survey Stations SSM -CUE 34, 35, 36, 36A, 113 and 114 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 07-Jul-2016 | |
6 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 07-Jul-2016 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Sanitary Depot Reserve 9603, Aerial Landing Ground Reserve 42391 and Water Act Reserves 7747 and 11772. | 07-Jul-2016 | |
| 1 | In respect to the area designated as CPL/63 (Lakeside Pastoral Lease 3114/484) in TENGRAPH the following conditions apply: | 07-Jul-2016 | |
8 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 07-Jul-2016 | |
9 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 07-Jul-2016 | |
10 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 07-Jul-2016 | |
| 1 | Consent to mine on Water Reserve 5 granted subject to the following condition: | 07-Jul-2016 | |
11 | 1 | No mining on any Wellhead Protection Zone (WPZ0000015) located within the subject mining tenement boundaries without first obtaining the written consent of the Minister responsible for the Mining Act 1978. | 07-Jul-2016 | |
12 | 1 | In respect of the area covered by this licence, if the Yugunga-Nya People being the applicants in Federal Court Application No. (WC1999/046) send a request by prepaid post to the licencee's or agent's address, not more than ninety day after the grant of this licence, the licencee shall within thirty days of the request, execute in favour of Yugunga-Nya People the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Yamatji Marlpa Aboriginal Corporation. | 07-Jul-2016 | |
Type | Number | Details |
Extension of Time | 467633 | Lodged:13:30 13 April 2015Type:Service on PastoralistRECORDED:13:30 13 April 2015APPROVED:09:43 21 May 2015 |
Forfeiture | 514882 | Initiated:21/09/2017 for non-compliance with rent requirementsRECORDED:10:02:22 20 September 2017Notice Issued:Regulation 50 Notice sent 21/09/2017 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:26/10/2017FINALISED:Order by Minister on 08 November 2017 that E 21/183 be Penalty Imposed |
Fine | 518111 | Fine in respect to:Forfeiture Process 514882Fine reason:Non-compliance with rent obligationsPenalty amount:$285.00Notification date:10/11/2017Due date:15/12/2017Pursuant to:Section 96A(5)RECORDED:10 November 2017PAYMENT RECEIVED:15 December 2017FINALISED:15 December 2017Receipt Number:01-015430Amount:$285.00Remaining balance:$0.00 |
Application to Amend | 591784 | Lodged:08:30 04 December 2020Amending:Address (Including DTC Details)From:MOLLOY, Marjorie Ann, 8 BROULA RD, KALAMUNDA, WA, 6170To:MOLLOY, Marjorie Ann, MARJORIE ANN MOLLOY, 45 REYNOLDS CLOSE, SWAN VIEW, WA, 6056REJECTED:08:30 04 December 2020 |
Excess Tonnage | 593683 | Lodged:14:00:27 12 January 2021RECORDED:14:00:27 12 January 2021GRANTED:16:18 11 February 2021An additional 9,000 tonnes |