Extracted from MTO on 09-Jul-2025 01:25,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 22-May-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-May-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-May-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-May-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-May-2019 | |
6 | 1 | No interference with Geodetic Survey Station SSM-G 20-4 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 22-May-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 22-May-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-May-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-May-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 22-May-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 22-May-2019 | |
6 | 1 | No interference with Geodetic Survey Station SSM-G 20-4 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 22-May-2019 | |
Type | Number | Details |
Application to Amend | 618665 | Lodged:11:33:42 24 March 2021Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN DRILLING PTY LTD, LEVEL 8, 99 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :NORTHERN DRILLING PTY LTD, LEVEL 8, 99 ST GEORGES TERRACE, PERTH, WA, 6000To:Principal Place of Business : NORTHERN DRILLING PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400 and DTC :NORTHERN DRILLING PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400RECORDED:11:33:42 24 March 2021 |
Extension / Renewal of Term | 704507 | Lodged:08:30 21 May 2024Applied For Period:5 YearsRECORDED:08:30 21 May 2024GRANTED:27 August 2024Granted Period:5 YearsTerm Extended To:21/05/2029 |
Forfeiture | 723096 | Initiated:13/12/2024 for non-compliance with expenditure conditionsRECORDED:08:30 13 December 2024FINALISED:Order by Minister on 26 February 2025 that E 20/938 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 13/12/2024 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:31/01/2025 |
Fine | 727567 | Fine in respect to:Forfeiture Process 723096Fine reason:Non-compliance with expenditure obligationsPenalty amount:$5,285.00Notification date:06/03/2025Due date:11/04/2025Pursuant to:Section 96A(5)RECORDED:06 March 2025PAYMENT RECEIVED:14 March 2025FINALISED:14 March 2025Receipt Number:10779523Amount:$5,285.00Remaining balance:$0.00 |
Application to Amend | 732042 | Lodged:13:34:37 29 April 2025Amending:Address (Including DTC Details)From:Principal Place of Business : NORTHERN DRILLING PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400 and DTC :NORTHERN DRILLING PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400To:Principal Place of Business : NORTHERN DRILLING PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :NORTHERN DRILLING PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:13:34:37 29 April 2025 |
Amalgamation | 732100 | Lodged:09:31:44 30 April 2025 |
Caveat | 735353 | Lodged:14:23:49 09 June 2025Caveat Type:Consent CaveatCaveator:BAIN GLOBAL RESOURCES PTY LTDShares Caveated:100/100 shares NORTHERN DRILLING PTY LTDRECORDED:14:23:49 09 June 2025 |