Extracted from MTO on 01-Jul-2025 00:31,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 14-Sep-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 14-Sep-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 14-Sep-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 14-Sep-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 14-Sep-2018 | |
6 | 1 | No interference with Geodetic Survey Station SSM-WB157 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 14-Sep-2018 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 14-Sep-2018 | |
8 | 1 | No activities being carried out within the proposed railway corridor (designated FNA 9031) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent. | 14-Sep-2018 | |
9 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use & Benefits Of Aborigines Reserve 16670. | 14-Sep-2018 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 14-Sep-2018 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 14-Sep-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 14-Sep-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 14-Sep-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 14-Sep-2018 | |
6 | 1 | No interference with Geodetic Survey Station SSM-WB157 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 14-Sep-2018 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 14-Sep-2018 | |
8 | 1 | No activities being carried out within the proposed railway corridor (designated FNA 9031) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent. | 14-Sep-2018 | |
9 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use & Benefits Of Aborigines Reserve 16670. | 14-Sep-2018 | |
Type | Number | Details |
Application to Amend | 519651 | Lodged:08:30 06 December 2017Amending:NameFrom:WELD RANGE METALS LIMITEDTo:PODIUM MINERALS LIMITEDRECORDED:08:30 06 December 2017 |
Caveat | 584517 | Lodged:15:50 19 August 2020Caveat Type:Consent CaveatCaveator:AUSINOX PTY LIMITEDShares Caveated:100/100 shares PODIUM MINERALS LIMITEDRECORDED:15:50 19 August 2020WITHDRAWN:09:08:15 28 February 2025 |
Licence Instrument | 589904 | Lodged:09:43 10 November 2020ISSUED:08:33:42 07 December 2020 |
Application to Amend | 590170 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : PODIUM MINERALS LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849 and DTC :PODIUM MINERALS LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : PODIUM MINERALS LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :PODIUM MINERALS LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxxxxx977RECORDED:14:30 11 November 2020 |
Amalgamation | 594226 | Lodged:11:18 15 January 2021Amalgamating:Portion of M 51/498-ISituated within:External boundaries of E 20/928Granted 21/09/2021 in respect to M 51/498-I |
Extension / Renewal of Term | 685342 | Lodged:16:08:19 05 September 2023Applied For Period:5 YearsRECORDED:16:08:19 05 September 2023GRANTED:15 December 2023Granted Period:5 YearsTerm Extended To:13/09/2028 |
Partial Surrender - Compulsory | 714675 | Lodged:14:42:54 13 September 2024Section:Section 65 (3)Surrendered Blocks:MEEKATHARRA 2492 w, x
MEEKATHARRA 2563 a, b, c, f, g, h
MEEKATHARRA 2564 b, c, dSurrendered Total:11 BL.REGISTERED:Midnight 13 September 2024Surrendered area to be released 08:30:00 15/10/2024 under Section 65 (3)Surrendered area released 08:30:00 15/10/2024 under Section 65 (3) |
Caveat | 725174 | Lodged:14:51:57 06 February 2025Caveat Type:Consent CaveatCaveator:JOHNSON MATTHEY PLCShares Caveated:100/100 shares PODIUM MINERALS LIMITEDRECORDED:14:51:57 06 February 2025 |
Withdrawal of Dealing | 727139 | Lodged:09:08:15 28 February 2025In respect to:Caveat 584517RECORDED:09:08:15 28 February 2025 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
29-Jan-2021 | Tenement Amalgamation | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2021-02-242021-06-24CLEARED - Expedited Applies2021-07-120.22401 HA265334S1174017E62.8km N'ly of Cue | | | WAJARRI YAMATJI PART A(WCD2017/007)WC2004/010WAD28/2019falseWCD2017/007BOTHNo | Wajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019trueDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |
28-Mar-2018 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2018-04-182018-08-18CLEARED - Expedited Applies2018-08-3127 BL265430S117360E64km NW'ly of Cue | WO2018/05592018-08-01WC2004/010Objection Withdrawn2018-08-29 | | WAJARRI YAMATJI PART A(WCD2017/007)WC2004/010WAD28/2019falseWCD2017/007BOTHNo | Wajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019trueDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |