Extracted from MTO on 16-Jul-2025 00:38,
last changed 03-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 20-Nov-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 20-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 20-Nov-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 20-Nov-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 20-Nov-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 20-Nov-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 20-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 20-Nov-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 20-Nov-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 20-Nov-2017 | |
Type | Number | Details |
Excess Tonnage | 519332 | Lodged:14:35:20 30 November 2017RECORDED:14:35:20 30 November 2017GRANTED:10:24:55 18 December 2017For an additional 10,000 tonnes |
Application to Amend | 633807 | Lodged:14:11:21 08 October 2021Amending:Address (Including DTC Details)From:Principal Residence : SANDER, Thomas Peter, 23 TUNNEL RD, SWAN VIEW, WA, 6056, xxxxxxxxxxxx@gmail.com, xxxxxxx746 and DTC :SANDER, Thomas Peter, THOMAS SANDER, 23 TUNNEL RD, SWAN VIEW, WA, 6056, xxxxxxxxxxxx@gmail.com, xxxxxxx746To:Principal Residence : SANDER, Thomas Peter, C/- HG TITLE SERVICES PTY LTD, PO BOX Z5312 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxx@hopgoodganim.com.au, xxxxxxxx163 and DTC :SANDER, Thomas Peter, SENIOR TENEMENT MANAGER, C/- HG TITLE SERVICES PTY LTD, PO BOX Z5312 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxx@hopgoodganim.com.au, xxxxxxxx163RECORDED:14:11:21 08 October 2021 |
Extension / Renewal of Term | 663032 | Lodged:12:42:54 10 November 2022Applied For Period:5 YearsRECORDED:12:42:54 10 November 2022GRANTED:12 April 2023Granted Period:5 YearsTerm Extended To:19/11/2027 |