Extracted from MTO on 28-Jun-2025 00:43,
last changed 28-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 21-Mar-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 21-Mar-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-Mar-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 21-Mar-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 21-Mar-2017 | |
| 1 | Consent to explore on Cue Water Reserve WR 5 granted by the Minister responsible for the Mining Act 1978. | 21-Mar-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 21-Mar-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 21-Mar-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 21-Mar-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 21-Mar-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 21-Mar-2017 | |
| 1 | Consent to explore on Cue Water Reserve WR 5 granted by the Minister responsible for the Mining Act 1978. | 21-Mar-2017 | |
Type | Number | Details |
Excess Tonnage | 505915 | Lodged:14:46 05 May 2017RECORDED:14:46 05 May 2017WITHDRAWN:14:08:54 16 May 2017 |
Application to Amend | 529389 | Lodged:11:36:25 04 May 2018Amending:Address (Including DTC Details)From:Principal Residence : WILSON, Gregory David, 26 WARNBRO BEACH ROAD, SAFETY BAY, WA, 6169 and DTC :WILSON, Gregory David, GREGORY DAVID WILSON, 26 WARNBRO BEACH ROAD, SAFETY BAY, WA, 6169, xxxxxxx@bigpond.comTo:Principal Residence : WILSON, Gregory David, 26 WARNBRO BEACH ROAD, SAFETY BAY, WA, 6169, xxxxxxx@bigpond.com, xxxxxxx041 and DTC :WILSON, Gregory David, GREGORY DAVID WILSON, 26 WARNBRO BEACH ROAD, SAFETY BAY, WA, 6169, xxxxxxx@bigpond.com, xxxxxxx041RECORDED:11:36:25 04 May 2018 |
Surrender - Outright | 560821 | Lodged:14:10:18 15 August 2019REGISTERED:14:10:18 15 August 2019 |