Extracted from MTO on 16-May-2022 04:33,
last changed 14-Mar-2022.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Nov-2016 | |
5 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 16-Nov-2016 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 06-Oct-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 16-Nov-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 16-Nov-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 16-Nov-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 16-Nov-2016 | |
5 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 16-Nov-2016 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 06-Oct-2020 | |
Type | Number | Details |
Amalgamation | 498335 | Lodged:14:02 05 December 2016Amalgamating:Portion of former M 20/197Situated within:External boundaries of E 20/894Granted 13/03/2018 in respect to M 20/197 |
Application to Amend | 521427 | Lodged:14:45 10 January 2018Amending:Address (Including DTC Details)From:POLARIS AUSTRALASIA RESOURCES PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913To:POLARIS AUSTRALASIA RESOURCES PTY LTD, C/- CHARLES RIDOLFO AND CO, PO BOX 8678, PERTH BC, WA, 6849RECORDED:14:45 10 January 2018 |
Application to Amend | 524948 | Lodged:13:59:38 07 March 2018Amending:Address (Including DTC Details)From:Principal Place of Business : POLARIS AUSTRALASIA RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :POLARIS AUSTRALASIA RESOURCES PTY LTD, C/- CHARLES RIDOLFO AND CO, PO BOX 8678, PERTH BC, WA, 6849To:Principal Place of Business : POLARIS AUSTRALASIA RESOURCES PTY LTD, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866 and DTC :POLARIS AUSTRALASIA RESOURCES PTY LTD, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxxxx866RECORDED:13:59:38 07 March 2018 |
Application for Forfeiture | 547888 | Lodged:14:25:04 18 February 2019Applicant:LIEDER, Mark JohnRespondent:FICARRA RESOURCES PTY LTDRECORDED:14:25:04 18 February 2019Warden's Determination:Withdrawn 18/04/2019 10:30:00WITHDRAWN:12:00:01 18 April 2019 |
Excess Tonnage | 585072 | Lodged:08:30 31 August 2020RECORDED:08:30 31 August 2020GRANTED:15:48 24 September 2020An additional 9,000 tonnes |
Extension / Renewal of Term | 635799 | Lodged:08:30 15 November 2021Applied For Period:5 YearsRECORDED:08:30 15 November 2021GRANTED:10 February 2022Granted Period:5 YearsTerm Extended To:15/11/2026 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
23-Dec-2016 | Tenement Amalgamation | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2017-01-112017-05-11CLEARED - Expedited Applies2018-03-07251.3 HA271446S1174113E29km NW'ly of Cue | WO2017/02292017-04-11WC2004/010Objection Withdrawn Agreement2018-03-07 | | | Wajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019trueDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |
14-Jun-2016 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2016-06-292016-10-29CLEARED - Expedited Applies2016-11-1514 BL27150S1173930E30km NW'ly of Cue | | | | Wajarri Yamatji #1(WC2004/010)WC2004/010WAD28/2019falseDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |