Extracted from MTO on 05-Jul-2025 00:56,
last changed 05-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 01-Jul-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 01-Jul-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 01-Jul-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 01-Jul-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 01-Jul-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 01-Jul-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 01-Jul-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 01-Jul-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 01-Jul-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 01-Jul-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 01-Jul-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 01-Jul-2015 | |
Type | Number | Details |
Amalgamation | 470947 | Lodged:15:10 09 July 2015Amalgamating:Whole of former M 20/250Situated within:External boundaries of E 20/844-IAmalgamating:Whole of former P 20/1959Situated within:External boundaries of E 20/844-IAmalgamating:Whole of former P 20/2079Situated within:External boundaries of E 20/844-IAmalgamating:Whole of former P 20/2130Situated within:External boundaries of E 20/844-IGranted 01/08/2016 in respect to M 20/250Granted 01/08/2016 in respect to P 20/1959Granted 01/08/2016 in respect to P 20/2079Granted 01/08/2016 in respect to P 20/2130 |
Application to Amend | 490220 | Lodged:14:14:30 07 July 2016Amending:Address (Including DTC Details)From:WELD RANGE METALS LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:WELD RANGE METALS LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:14:14:30 07 July 2016 |
Application to Amend | 519651 | Lodged:08:30 06 December 2017Amending:NameFrom:WELD RANGE METALS LIMITEDTo:PODIUM MINERALS LIMITEDRECORDED:08:30 06 December 2017 |
Extension / Renewal of Term | 581122 | Lodged:11:10:53 30 June 2020Applied For Period:5 YearsRECORDED:11:10:53 30 June 2020LAPSED:02 December 2020Upon surrender of licence |
Extension of Time | 582005 | Lodged:15:00 14 July 2020Type:OtherRECORDED:15:00 14 July 2020APPROVED:13:54:45 29 July 2020Time to lodge extended to 24 Jul 2020 |
Extension / Renewal of Term | 583026 | Lodged:15:10:40 29 July 2020Applied For Period:5 YearsRECORDED:15:10:40 29 July 2020LAPSED:02 December 2020Upon surrender of licence |
Extension of Time | 583408 | Lodged:15:15:36 03 August 2020Type:OtherRECORDED:15:15:36 03 August 2020APPROVED:11:30:20 13 August 2020Time to lodge extended to 03 Aug 2020 |
Caveat | 584516 | Lodged:15:50 19 August 2020Caveat Type:Consent CaveatCaveator:AUSINOX PTY LIMITEDShares Caveated:100/100 shares PODIUM MINERALS LIMITEDRECORDED:15:50 19 August 2020WITHDRAWN:14:30:46 02 December 2020 |
Application to Amend | 590252 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : PODIUM MINERALS LIMITED, SAME AS CORRESPONDENCE and DTC :PODIUM MINERALS LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : PODIUM MINERALS LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977 and DTC :PODIUM MINERALS LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977RECORDED:14:30 11 November 2020 |
Surrender - Outright | 590082 | Lodged:08:30 12 November 2020REJECTED:08:30 12 November 2020Consent Caveat 584516 in force |
Application for Forfeiture | 590742 | Lodged:08:30 19 November 2020Applicant:MCCLAREN, Kym AnthonyRespondent:PODIUM MINERALS LIMITEDRECORDED:08:30 19 November 2020Warden's Determination:Lapsed 21/01/2021 12:30:00 |
Withdrawal of Dealing | 591690 | Lodged:14:30:46 02 December 2020In respect to:Caveat 584516RECORDED:14:30:46 02 December 2020 |
Surrender - Outright | 591691 | Lodged:14:34:25 02 December 2020REGISTERED:14:34:25 02 December 2020Re Application for Forfeiture 590742: Notice pursuant to Sec 100(1) sent. |