Extracted from MTO on 16-Jul-2025 00:19,
last changed 03-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 08-Mar-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 08-Mar-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Mar-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Mar-2012 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Mar-2012 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Mar-2012 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 08-Mar-2012 | |
8 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 08-Mar-2012 | |
9 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Recreation Reserve 6312. | 08-Mar-2012 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 08-Mar-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 08-Mar-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Mar-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Mar-2012 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Mar-2012 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Mar-2012 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the Great Northern Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Northern Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 08-Mar-2012 | |
8 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 08-Mar-2012 | |
9 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Recreation Reserve 6312. | 08-Mar-2012 | |
Type | Number | Details |
Iron Ore Inclusion | 390922 | Lodged:15:00 08 February 2012RECORDED:15:00 08 February 2012AUTHORISED:13:19:26 08 March 2012 |
Application to Amend | 458442 | Lodged:15:50 27 November 2014Amending:AddressFrom:PHOSPHATE AUSTRALIA LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:PHOSPHATE AUSTRALIA LIMITED, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2 326 HAY STREET, EAST PERTH, WA, 6004RECORDED:15:50 27 November 2014 |
Extension / Renewal of Term | 502192 | Lodged:14:10:48 07 March 2017Applied For Period:5 YearsRECORDED:14:10:48 07 March 2017GRANTED:04 July 2017Granted Period:5 YearsTerm Extended To:07/03/2022 |
Application to Amend | 593405 | Lodged:16:01:04 05 January 2021Amending:Address (Including DTC Details)From:Principal Place of Business : MONUMENT MURCHISON PTY LTD, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2, 326 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxx@landadmin.com.au, xxxxx777 and DTC :MONUMENT MURCHISON PTY LTD, JENNY JOHNSON, C/- TENEMENT ADMINISTRATION SERVICES PTY LTD, LEVEL 2, 326 HAY STREET, EAST PERTH, WA, 6004, xxxxxxxx@landadmin.com.au, xxxxx777To:Principal Place of Business : MONUMENT MURCHISON PTY LTD, C/- HG TITLE SERVICES PTY LTD, PO BOX Z5312 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxx@hopgoodganim.com.au, xxxxx163 and DTC :MONUMENT MURCHISON PTY LTD, SENIOR TENEMENT MANAGER, C/- HG TITLE SERVICES PTY LTD, PO BOX Z5312 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxx@hopgoodganim.com.au, xxxxx163RECORDED:16:01:04 05 January 2021 |
Amalgamation | 622777 | Lodged:14:55 12 May 2021Amalgamating:Portion of former P 20/2075Situated within:External boundaries of E 20/782-IGranted 05/07/2024 in respect to P 20/2075 |
Extension / Renewal of Term | 642412 | Lodged:11:18:59 01 March 2022Applied For Period:2 YearsRECORDED:11:18:59 01 March 2022GRANTED:28 October 2022Granted Period:2 YearsTerm Extended To:07/03/2024 |
Extension / Renewal of Term | 698002 | Lodged:08:30 06 March 2024Applied For Period:2 YearsRECORDED:08:30 06 March 2024GRANTED:25 October 2024Granted Period:2 YearsTerm Extended To:07/03/2026 |